183124 183124
• COUNCIL FILE NO.
By
unc' .'i1e No. 183124—
FINAL ORDER }, cha,
In the Matter of changing the grade of Orange Avenue from Alameda Street to St. Albans
•
Street to conform to the grade as shown on the profile on file in the Department of
Public Works. Also grading Orange Avenue to a width of 50 feet from Alameda Street to
St. Albans Street to the proposed change of grade, and grading Orange Avenue to a width
of 50 feet from Alameda Street to Grotto Street,
under Preliminary Order 180184 approved October 30, 1956
Intermediary Order approved
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is change the grade of Orange Avenue from Alameda Street
to St. Albans Street to conform to the grade as shown on the profile on file in the
Department of Public Works. Also grade Orange Avenue to a width of 50 feet from Alameda
Street to St. Albans Street to the proposed change of grade, and grade Orange Avenue to
a width of 50 feet from Alameda Street to Grotto Street,
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council 4195
�- , t
22.1 4 t157 ry City Clerk.
(2(g-,
Approved
File 13540
Of Mayor.
Councilman
DeCOURCY HOLLAND
fri(Councilman MARZITE w Councilman , s
Councilman MORTINSON i
PETERSON
Councilman ' ' [
ROSEN . '� ;� �� 0
Mayor DILLON / �i�"
2-55 2M 2
PUBLISHED 6, " "S '/ `,
OW
' CITY OF ST. PAUL
• DEPARTMENT OF FINANCE (rk3� 9
REPORT OF COMMISSIONER OF FINANCE 81,18„,-
ON PRELIMINARY ORDER 000
•
(D) 4.---
In the ma:ter of changing the grade of Orange Avenue from Alameda Street to St. Albans Street to
conform to the grade as shown on the profile on file in the Department of Public Works. Also
grading Orange Avenue to a width of 50 feet from Alameda Street to St. Albans Street to the
proposed change of grade and grade Orange Avenue to a width of 50 feet from Alameda Street to
Grotto Street
under Preliminary Order approved October 30, 1956
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated amount of the assessment for the above improvement is - - - $ 5,205.116
The estimated cost per foot for the above improvement is - - - - - - - $ 97.26
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or
parcel as last reported by the Assessor, are as follows:
DESCRIPTION LOT BLOCK ADDITION ASSESSED
_Lan L��ui�
Ryans Sub. of 131k. 6, :Rogers
15 1 & Hendricks Acre Lots ( 350. 1t800.
Lot 16 qt South 20.67 ft. of 17 1 do 200. 51150.
!: Lot 15 A except North 21.36 ft.; j 14 2 do 175. 7800.
16 2 do loo. 5150.
1 Slayton's ,,ub. of Lots 8, 9 &
10, Rogers A Hendricks Acre Lots
I: Lots 1 and 2 do 650. 2600.
18 do 1100. 3050.
Coleman's Sub. of Lots one and
two of block 7 of Rogers and
1 Hendricks Acre Lots
1 do 1100. 11550.
Lot_126c.-.except_S'ly-30..II3_tt.i oo 400. 5550.
— Total 2,975. 38,950. --
—
—
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and
hereby submits the foregoing as his report thereon to the Council, together with the report made to him in
reference to said matter by the Commissioner of Public Works.
Dated November 13 19 56 29- ALt-kiza4L 772.
Commissioner of Fina e.
Form B.S.A. 8-5 D
3fltl
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
r
REPORT TO COMMISSIONER OF FINANCE
November 2, , 19_a__
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration the prelimin-
ary order of the Council, known as Council File No. 180184, approved
October 30, 1956 , relative to , • ,. NO . • • 0 . ..- i zt - an
$lignesia ,5 ree to St. Albans Street t,o confozia to the grade as shown nn the prnfi 1A, on
' S- 1 .. ■U- • P _• W. ,s A • • .• t. • . 4.= e ' - 4 • . . • . • 1
feet from Alameda Street to St. Albans Street to the proposed chance of grade and grade
Orange Atenae to a width of 50 feet fram Alameda Street to Grotto Street
and having investigated the matters and things referred to therein, hereby reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 5,205.46 , and the total cost thereof
Engineering $245.00 Inspection $97.26 Cost per Front Foot $5.31
is $ and the nature and extent of said improvement is as follows:
Frontage 980 ft.
3. A plan, profile or sketch of said improvement is hereto attached and made
a part hereof.
4. iiMMIL
5. Said improvement is asked for upon petition of three or more (-J\
owners of property, subject to assessment for said improvement.
40 12 T �� �
l''/ F A K D. MAR,v)' sc___
;!U'J 0J.mmi s ' .- ':' forks r,�.
5 1956 Ni /
FINANCE 0
.' 1gT-rt
-
ASSISTANT CHIEF ENGINEER CITY ( C SAINT PAUL ACCOUNTING DIVISION
ARTHUR W. TEWS JOS. PAVLICEK
• Prin.Accountant
OFFICE ENGINEER Capital of Minnesota
•
HERBERT S. WEST DEPARTMENT OF PUBLIC WORKS
• BUREAU OF SANITATION
BRIDGE ENGINEER FRANK D. MARZITELLI, Commissioner JOHN M. COTTER, Supt.
MAURICE W. HEWETT •
• CLIFTON G. HOLMGREN, Deputy Commissioner BUREAU OF MUNICIPAL EQUIPMENT
TRAFFIC ENGINEER ARTHUR H. KOCH
EUGENE V. AVERY GEORGE M. SHEPARD, Chief Engineer
• S •
STREETS AND HIGHWAYS ENGINEER BUREAU OF CORRECTION
ARTHUR G. WELIN JOHN P.MULLANEY, Supt.
November 2, 1956
Hon. Frank D. Marzitelli
Commissioner of Public Works
City of St. Paul
Dear Sir:
I transmit herewith preliminary estimate of cost for changing
the grade of Orange Avenue from Alameda Street to St. Albans Street to
conform to the grade as shown on the profile on file in the Department of
Public. Works. Also grading Orange Avenue to a width of 50 feet from Alameda
Street to St. Albans Street to the proposed change of grade and grade Orange
Avenue to a width of 50 feet from Alameda Street to Grotto Street, under
Preliminary Order C. F. 180184 approved October 30, 1956.
Estimated Cost $ 5,205.46
Engineering 245.00
Inspection 97.26
Cost per Front Foot 5.31
Frontage 980 ft.
Yours very truly,
'
-org- M. Shepard
' hie ' Engineer
Approved for transmission
to the Commissioner of Finance
Fank itelli
Commissio��aof •r
7
// 4
i g9VS0
__ - _ -- --- - - - T---_ _ ..._-._._�=--i
LAKE CO MO co/ I _
N V/CTOR/A ), ST. , _
I -------7 / ,t11
I4 )
v /--// 1 HI
j N. AVON 57 N Nk
� 4-\
. _!II o i i
ill �cit'l t`` \ H.� , -r1
k
O FOL.S OM AVE rl
'c
I
RD T TO S7: III
I
L \ \
A L A MEDA _ 5r 1- y
i- N
S7' ALBANS "`" c4.5-T.
11 N .
MAY W000 ST,
II
-- DALE - ST. —
I
1 .
F,,
t
1 qq f
2 r 14' x.. s '4" Z q..
44.