183446 COUNCIL FILE NO.
By -
FINAL ORDERS
FINAL ORDER Council File No. 183446—
In the matter of grading and sur-
facing with bituminous material the
In the Matter of grading and surfacing with bituminous material the North East-and-
West alley from English St. to the North-and-South alley, and the North-and-South alley
from the North East-and-West alley to the South East-and-West alley, and the South
East-and-West alley from the North-and-South alley to Point Douglas Road - all in
Block 2, Point Douglas Addition.
Also constructing a sewer in the South East-and-West alley from the North-and-
South alley to English St. in said Block 2, Point Douglas Addition,
under Preliminary Order 1821+9-5 approved ,9..px'il 25, 19-57
Intermediary Order approved
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is. grade and surface with biturni nous material the
North East-and-West alley from English St. to the North-and-South alley, and the North-
and-South alley from the North East-and-West alley to the South East-and-West alley,
and the South East-and-West alley from the North-and-South alley to Point Douglas Road -
all in Block 2, Point Douglas Addition.
Also construct a sewer in the South East-and-West alley from the North-and-South
alley to English St. in said Block 2, Point Douglas Addition,
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said imprigniment in accordance therewith.
251957
Adopted by the Council
•
2 5 g77 7 City Clerk.
Approved
File 13750
Mayor.
Councilman DeCOURCY �9'GtiaQ
Councilman HOLLAND
Councilman PUBLISHED
MARZITELLI
Councilman MORTINSON
Councilman .-.
Councilman ROSEN
Mayor DILLON
2-55 2M 2
. • CITY OF ST. PAUL �e
DEPARTMENT OF FINANCE !.7'
6
REPORT OF COMMISSIONER OF FINANCE 18:1/
• ON PRELIMINARY ORDER y1�
(D) V�
In the matter of grading and surfacing with bituminous material the North East-and-West alley from
English St. to the North-and-South alley, and the North-and-South alley from the North East-and-
West alley to the South East-and-West alley, and the South East-and-West alley from the North-
and-South alley to Point Douglas Road - all in Block 2, Point Douglas Addition;
Also constructing a sewer in the South East-and-West alley from the North-and-South alley to
English St. in said Block 2, Point Douglas Addition,
under Preliminary Order approved April 25, 1957
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated amount of the assessment for the above improvement is - Sewer on 'y585.3 ,
The estimated cost per foot for the above improvement is - - - - Sewer & Ql] :y 5. b
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or
parcel as last reported by the Assessor, are as follows:
DESCRIPTION LOT BLOCK ADDITION ASSESSED
Land VALUATION ld
g• 1
1 2 Point Douglas Addition $500 $42001
2 2 do 475 36001
3 2 do 475 40501'
4 2 do 475 40501
NW'ly 15 ft. of Lot 6 and all of 5 2 do 650 200�I
Ex. NW'ly 15 ft. ; Lot 6 & NW'ly
30 ft. of 7 2 do 65o 4800
Ex. NW'ly 30 ft. ; Lot 7 & all of 6 2 do 600
Lots 9 and 10 2 do 1600 5150
Ex. W. 20 ft.; 11 2 { do 250
Lot 12 & W. 20 ft. of 11 2 do 750 5200
Lots 13 & 14 2 do 1000 6700
15 2 do 500 2250
19 2 do 600 5050
FORM B.B.iI TOTAL
-2-
CITY OF ST. PAUL.
DEPARTMENT OF FINANCE
•
- REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B) - --- _ -----
DESCRIPTION LOT BLOCK ADDITION ASSESSED
VALUATION
20 2 Point Douglas Addition $400 $455Q
16 2 do 500 310Q
17 2 do 500
18 2 do 55o 3800
TOTAL $19,475 $56,700
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and
hereby submits the foregoing as his report thereon to the Council, together with the report made to him in
reference to said matter by the Commissioner of Public Works.
Dated May 28 19_57 i-' . .,,,, _-' "M. }
Commissioner of Fiance,
Form B.S.A. 8-5 D
•
• St. Paul, Minn.___ M i r_ch__a_1__1G5&.192
' To The Honorable, The Council,
City of St. Paul, Minn. ` Z
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable
Body to c use the following improvement to be made:
Grade and e t t1e alley addording to the attached plat marked in color.
This alley is between Burns Ave and Point Douglas Road ,running
irre ula.rl from Point Douglas Road to English Street. No work to be
done in bask of lots 15, 16, 17, 18 Black 2 Point Douglas Add. St. Ave.
a write _. -
from St. Ave. to
St. Ave.
NAME LOT BLOCK ADDITION
SCOlne/74 1 �,Fi ,B Point Douglas Add
e I Past
—'�c.� • '1 II It .r
1 9 II It el
I
■ 1 2
//
1.„,41e/(7--C dirtre,:eotio_ 02" ,
/A G ����� Ao
6'Ta...o_ tv .r
•
/A./ ea,/4 e/Afr, /4 , r: /f.
Jule Q ice/ f 4 c hd e, p•e
Grlrn4 fo `S r 2L q /41-4-(-0
•
• /37sv
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
April 30, , 19 57
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration the prelimin-
and having investigated the matters and things referred to therein, hereby reports:
1. Said improvement is necessary and (or) desirable.
SEE LETTER
2. The estimated cost thereof is $ ATTACHED , and the total cost thereof
is $ and the nature and extent of said improvement is as follows=
3. A plan, profile or sketch of said improvement is hereto attached and made
a part hereof. ft
4.
5. Said improvement is asked for upon petition of three or more
owners of property, subject to assessment for said improvement. _,;
j.4
RANK U• ��RZI A LL _.
+1LCEIVE0 ICommissi•, 41111,x ' • yJCS.
APR 30 1957
Dom. OF
cl RNANcf ,
oi
•
•
OFFICE ENGINEER'. CITY OF SAINT PAUL ACCOUNTING DIVISION
HERBERT S. WEST • JOS. PAVLICEK
Prin. Accountant
• Capital of Minnesota
BRIDGE HEWETT DEPARTMENT OF PUBLIC WORKS
BUREAU OF SANITATION
JOHN M. COTTER, Supt.
• FRANK D. MARZITELLI, Commissioner •
TRAFFIC ENGINEER
EUGENE V. AVERY CLIFTON G. HOLMGREN, Deputy Commissioner BUREAU OF MUNICIPAL EQUIPMENT
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator ARTHUR H. KOCH
• •
ARTHUR W. TEWS, Chief Engineer
STREETS AND HIGHWAYS ENGINEER
ARTHUR G. WELIN BUREAU OF CORRECTION
,rd ¢ JOHN P. MULLANEY, Supt.
• •
April 30, 1957
Hon. Frank D. Marzitelli
Commissioner of Public Works
City of St. Paul
Dear Sir:
I transmit herewith preliminary estimate of cost for grading and
surfacing with bituminous material the North-East and West alley from English
St. to the North and South alley, and the North and South alley from the North-
East and West alley to the South-East and West alley, and the South-East and
West alley from the North and South alley to Point Douglas Road - all in Block
2, Point Douglas Addition.
Also constructing a sewer in the South-East and West alley from the
North and South alley to English St. in said Block 2, Point Douglas Addition,
under Preliminary Order C. F. 182495 approved April 25, 1957.
Total Estimated Cost $ 3,585.35
Engineering 200.00
Inspection 66.00
Cost per Front Foot:
Sewer only 2.16
Sewer and alley 5.26
Frontage:
Sewer only 200 ft.
Sewer and alley 600 ft.
Yours very truly,
Arthur W. Tews
Approved for transmission Chief Engineer
to the Commissioner of Finance
Frank D. rzit4Li -
Commissioner o c W J
Opi
" 14 e
ENCL / .SH - ----- --- sue' —
4 C
it U
O
ss
CLA/ZZ/•iCE' S7
3 e
1
4 Z G
ETN4 3T.
4G
atl
1
V
4s/2"r/�vcti,q,y — 8�
T
N
G
1
84 2CL 4 Y �77
VI
m SI
,
i H
w
.