Loading...
183446 COUNCIL FILE NO. By - FINAL ORDERS FINAL ORDER Council File No. 183446— In the matter of grading and sur- facing with bituminous material the In the Matter of grading and surfacing with bituminous material the North East-and- West alley from English St. to the North-and-South alley, and the North-and-South alley from the North East-and-West alley to the South East-and-West alley, and the South East-and-West alley from the North-and-South alley to Point Douglas Road - all in Block 2, Point Douglas Addition. Also constructing a sewer in the South East-and-West alley from the North-and- South alley to English St. in said Block 2, Point Douglas Addition, under Preliminary Order 1821+9-5 approved ,9..px'il 25, 19-57 Intermediary Order approved A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is. grade and surface with biturni nous material the North East-and-West alley from English St. to the North-and-South alley, and the North- and-South alley from the North East-and-West alley to the South East-and-West alley, and the South East-and-West alley from the North-and-South alley to Point Douglas Road - all in Block 2, Point Douglas Addition. Also construct a sewer in the South East-and-West alley from the North-and-South alley to English St. in said Block 2, Point Douglas Addition, and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said imprigniment in accordance therewith. 251957 Adopted by the Council • 2 5 g77 7 City Clerk. Approved File 13750 Mayor. Councilman DeCOURCY �9'GtiaQ Councilman HOLLAND Councilman PUBLISHED MARZITELLI Councilman MORTINSON Councilman .-. Councilman ROSEN Mayor DILLON 2-55 2M 2 . • CITY OF ST. PAUL �e DEPARTMENT OF FINANCE !.7' 6 REPORT OF COMMISSIONER OF FINANCE 18:1/ • ON PRELIMINARY ORDER y1� (D) V� In the matter of grading and surfacing with bituminous material the North East-and-West alley from English St. to the North-and-South alley, and the North-and-South alley from the North East-and- West alley to the South East-and-West alley, and the South East-and-West alley from the North- and-South alley to Point Douglas Road - all in Block 2, Point Douglas Addition; Also constructing a sewer in the South East-and-West alley from the North-and-South alley to English St. in said Block 2, Point Douglas Addition, under Preliminary Order approved April 25, 1957 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated amount of the assessment for the above improvement is - Sewer on 'y585.3 , The estimated cost per foot for the above improvement is - - - - Sewer & Ql] :y 5. b The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: DESCRIPTION LOT BLOCK ADDITION ASSESSED Land VALUATION ld g• 1 1 2 Point Douglas Addition $500 $42001 2 2 do 475 36001 3 2 do 475 40501' 4 2 do 475 40501 NW'ly 15 ft. of Lot 6 and all of 5 2 do 650 200�I Ex. NW'ly 15 ft. ; Lot 6 & NW'ly 30 ft. of 7 2 do 65o 4800 Ex. NW'ly 30 ft. ; Lot 7 & all of 6 2 do 600 Lots 9 and 10 2 do 1600 5150 Ex. W. 20 ft.; 11 2 { do 250 Lot 12 & W. 20 ft. of 11 2 do 750 5200 Lots 13 & 14 2 do 1000 6700 15 2 do 500 2250 19 2 do 600 5050 FORM B.B.iI TOTAL -2- CITY OF ST. PAUL. DEPARTMENT OF FINANCE • - REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (B) - --- _ ----- DESCRIPTION LOT BLOCK ADDITION ASSESSED VALUATION 20 2 Point Douglas Addition $400 $455Q 16 2 do 500 310Q 17 2 do 500 18 2 do 55o 3800 TOTAL $19,475 $56,700 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Dated May 28 19_57 i-' . .,,,, _-' "M. } Commissioner of Fiance, Form B.S.A. 8-5 D • • St. Paul, Minn.___ M i r_ch__a_1__1G5&.192 ' To The Honorable, The Council, City of St. Paul, Minn. ` Z Gentlemen: We, the undersigned property owners, hereby petition your Honorable Body to c use the following improvement to be made: Grade and e t t1e alley addording to the attached plat marked in color. This alley is between Burns Ave and Point Douglas Road ,running irre ula.rl from Point Douglas Road to English Street. No work to be done in bask of lots 15, 16, 17, 18 Black 2 Point Douglas Add. St. Ave. a write _. - from St. Ave. to St. Ave. NAME LOT BLOCK ADDITION SCOlne/74 1 �,Fi ,B Point Douglas Add e I Past —'�c.� • '1 II It .r 1 9 II It el I ■ 1 2 // 1.„,41e/(7--C dirtre,:eotio_ 02" , /A G ����� Ao 6'Ta...o_ tv .r • /A./ ea,/4 e/Afr, /4 , r: /f. Jule Q ice/ f 4 c hd e, p•e Grlrn4 fo `S r 2L q /41-4-(-0 • • /37sv OFFICE OF THE COMMISSIONER OF PUBLIC WORKS REPORT TO COMMISSIONER OF FINANCE April 30, , 19 57 To the Commissioner of Finance of the City of Saint Paul: The Commissioner of Public Works, having had under consideration the prelimin- and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. SEE LETTER 2. The estimated cost thereof is $ ATTACHED , and the total cost thereof is $ and the nature and extent of said improvement is as follows= 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. ft 4. 5. Said improvement is asked for upon petition of three or more owners of property, subject to assessment for said improvement. _,; j.4 RANK U• ��RZI A LL _. +1LCEIVE0 ICommissi•, 41111,x ' • yJCS. APR 30 1957 Dom. OF cl RNANcf , oi • • OFFICE ENGINEER'. CITY OF SAINT PAUL ACCOUNTING DIVISION HERBERT S. WEST • JOS. PAVLICEK Prin. Accountant • Capital of Minnesota BRIDGE HEWETT DEPARTMENT OF PUBLIC WORKS BUREAU OF SANITATION JOHN M. COTTER, Supt. • FRANK D. MARZITELLI, Commissioner • TRAFFIC ENGINEER EUGENE V. AVERY CLIFTON G. HOLMGREN, Deputy Commissioner BUREAU OF MUNICIPAL EQUIPMENT GEORGE M. SHEPARD, Street & Highway Engineering Coordinator ARTHUR H. KOCH • • ARTHUR W. TEWS, Chief Engineer STREETS AND HIGHWAYS ENGINEER ARTHUR G. WELIN BUREAU OF CORRECTION ,rd ¢ JOHN P. MULLANEY, Supt. • • April 30, 1957 Hon. Frank D. Marzitelli Commissioner of Public Works City of St. Paul Dear Sir: I transmit herewith preliminary estimate of cost for grading and surfacing with bituminous material the North-East and West alley from English St. to the North and South alley, and the North and South alley from the North- East and West alley to the South-East and West alley, and the South-East and West alley from the North and South alley to Point Douglas Road - all in Block 2, Point Douglas Addition. Also constructing a sewer in the South-East and West alley from the North and South alley to English St. in said Block 2, Point Douglas Addition, under Preliminary Order C. F. 182495 approved April 25, 1957. Total Estimated Cost $ 3,585.35 Engineering 200.00 Inspection 66.00 Cost per Front Foot: Sewer only 2.16 Sewer and alley 5.26 Frontage: Sewer only 200 ft. Sewer and alley 600 ft. Yours very truly, Arthur W. Tews Approved for transmission Chief Engineer to the Commissioner of Finance Frank D. rzit4Li - Commissioner o c W J Opi " 14 e ENCL / .SH - ----- --- sue' — 4 C it U O ss CLA/ZZ/•iCE' S7 3 e 1 4 Z G ETN4 3T. 4G atl 1 V 4s/2"r/�vcti,q,y — 8� T N G 1 84 2CL 4 Y �77 VI m SI , i H w .