Loading...
185197 .8)197 Original to City Clerl; CITY OF ST. PAUL FILE NCIL NO. OFFICE OF THE CITY CLERK • COUNCIL L TION-GENERAL FORM PRESENTED BY Adrian P. Winkel October 29 1957 COMMISSIONER DATF Z____ — 41 File 1`'o. 185197—By Adrian • • and , C. WHEREAS, Additions and Deductions which might prove to be necessary in the improvement described as the storm sewer system from Victoria to Idaho, Comptroller's Contract L-5709, Wolff Construction Co. , Contractor, have been pro- vided for in the specifications at unit prices stipulated therein, and WHEREAS, it has been found necessary to make the net addition set forth in the attached sheet WHEREAS, the total Net Addition is $896.90, now there- fore, be it RESOLVED, that the City of St. Paul through its City Council approves the foregoing addition in accordance with the specifications in the sum of $896.90, said sum to be added to the lump sum consi deration named in the contract, known as Comptroller's Contract L-5709, for the making of the above improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $896.90 is the correct amount to be added to the above contract. �.._ � 1. N U Ji 9196 COUNCILMEN Adopted by the Council 195_ Yeas 14/1" yi • 4,0-. Approved 195_ Holland 1VIarzi lli W rn 5e-/ n Favor 111160.1 Q Mortinson Mayor Peterson�� � Against Mr. President, lolXl n PUBLISF /j-:a 3 -j 5M 6-55 2 . . . . i5J9' ADDITIONS Changes in length of pipe runs: 6.4 Lin.Ft. 12" V.C.P. Milton & Fisk Sts. (10'deep) 4.60 29.44 5.3 Lin.Ft. 12" V.C.P. Victoria St. 8'deep 4.00 21.20 20.0 Lin.Ft. 12" V.C.P. Victoria St. 11'deep 4.90 98.00 9.6 Lin.Ft. 15" B.C.P. Fisk & Idaho Sts. 6'deep 4.14 39.74 4.2 Lin.Ft. 18" R.C.P. Fisk St. 4'deep 4.08 17.14 1.5 Lin.Ft. 21" B.C.P. Milton St. 11'deep 7.95 11.93 4.0 Lin.Ft. 24" B.C.P. Larpenteur Ave. 6'deep 7.08 28:32 1.7 Lin.Ft, 33" R.C.P. Idaho Ave. 9'deep 12.84 21.83 4.7 Lin.Ft. 36" R.C.P. Victoria St. 9'deep 14.41 67.73 4.0 Lin.Fb. 60" R.C.P, Milton St. 21'deep 42.35 169.40 5.3 Lin.Ft. 60" B.C.P. Victoria St. 8'deep 28.28 149,88 8.0 Lin.Ft. Extra M.H. #2 @Fisk & Idaho 16.00 128.00 1 ea. Castings A & B 45.00 5.0 Lin.Ft. Extra M.H. depth at Como Blvd. 15.00 75,00 1 House Connection @ 928 Nebraska 17.63 2 No, 4A Catch Basins ® Idaho & Fisk 65.00 130.00 1 No, 4A Catch Basin 0 Hoyt & Victoria 65.00 65.00 1 Cu. Yd. Solid Bock-Excavation-Montana 15.00 15.00 Asphalt walk on Montana Ave. 20.00 Installation of 16" water main offset at Iowa and Victoria - Labor 73.39 Equipment Rental 94.00 Cleaning sewer on Victoria No. of Hoyt Labor 98.01 Grading of Park property between Como &Arlington Labor 177.78 Equipment Rental 151.75 Relaying sewer at Iowa & Milton due to water main Labor 70.49 Equipment Rental 40.00 Total Additions $1,S55.66 DEDUCTIONS 10.3 Sq. Yd. Street restoration Victoria & Montana 0.75 7.75 Curb not replaced Victoria & Montana 109.3 Lin.Ft. Straight curt) 2.10 229.53 10.0 Lin.Ft. Radius curb 2.40 24.00 144 Sq, Ft. Monolithic Concrete Sidewalk 0.50 72.00 2 IAA Catch basins - Idaho & Fisk 130.00 260.00 2 Side Inlets. - Idaho & Fisk 50.00 100.00 24 Lin.Ft. 12" V.C.P. Side inlet connections 2.75 66.00 Changes in length of pipe runs : 4.8 Lin.Ft. 12' R.C.P. Avon St. 4.90 23.52 1.1 Lin.Ft. 15" R.C.P. Chatsworth St. 5.43 5.97 2.5 Lin.Ft. 18" R.C.P. Milton St. 6.27 15.68 6.o Lin.Ft. 36" R.C.P. Victoria St. 9.21 55.26 283 Sq. Yd. Sod 0.35 99.05 Total Deductions $955.76 TOTAL NET ADDITIONS $896.90 . • ADDITIONS Changes in length of pipe runs : 6.4 Lin.Ft. 12" V.C.P. Milton 1 Fisk Sts. (101deep) 4.60 29.44 5.3 Lin.Ft. 12" V.C.P. Victoria St. 8'deep 4.00 21.20 20.0 Lin.Ft. 12" V.C.P. Victoria St. 111deep 4.90 98.00 9.6 Lin.Ft. 15" R.C.P. Fisk & Idaho Sts. 6'deep 4.14 39.74 4.2 Lin.Ft. 18" R.C.P. Fisk St. 4'deep 4.08 17.14 1.5 Lin.Ft. 21" R.C.P. Milton ll'cleep 7.95 11.93 4.0 Lin.Ft. 24" R.C.P. Larpenteur Ave. 6Ideep 7.08 28.32 1.7 Lin.Ft. 33" R.C.P. Idaho Ave. 9'deep 12.84 21.83 4.7 Lin.Ft. 36" R.C.P. Victoria St. 9'deep 14.41 67.73 4.0 Lin.Ft. 60" R.C.P. Milton St. 21'deep 42.35 169.40 5.3 Lin.Ft. 6o0 R.C.P. Victoria St. 8Ideep 28.28 149.88 8.0 Lin.Ft. Extra. M.H. • 2 ' Fisk & Idaho 16.00 128.00 1 ea. Castings A & B 45.00 5.0 Lin.Ft. Extra M.H. depth at Como Blvd. 15.00 75.00 a. House Connection f5; 928 Nebraska 17.63 2 No. 4A Catch Brains Idaho & Fisk 65.00 130.00 1 No. 4A Catch Basin CP, Hoyt & Victoria 65.00 65.00 1 Cu. Yd. Solid Bock-Excavation-Fontana 15.00 15.00 Asphalt walk on Montana. Ave. 20.00 Inst.T1latIon of 16" water main offset at Iowa and Victoria Labor 73.39 Equipment Rental 94.00 Cleaning sewer on Victoria No. of Hoyt Labor 98.01 Grading of Park property between Como &Arlington Labor 177.78 Equipment Rental 151.75 Relaying sewer at Iowa & Milton due to water main Labor 70.49 .T,quipment Rental 40.00 Total Additions ------ :1, 855:66-- DEDUCTIONS 10.3 Sq. Yd. Street restoration Victoria & Montana 0.75 7.75 Curb not replaced Victoria & Montana 109.3 Lin.Ft. Straight curb 2.10 229.53 10.0 Lin.Ft. Radius curb 2.40 24.100 144 Sq. Ft. Monolithic Concrete Sidewalk 0.50 72.00 2 IAA Catch basins - Idaho & Fisk 130.00 260.00 2 Axle Inlet r - Idaho & Fisk 50.00 100.00 24 Lin.Ft. 12" V.C.P. Side inlet connections 2.75 66.00 Changes in length of pipe runs : 4.8 Lin.Ft. 12" R.C.P. Avon St. 4.90 23.52 1.1 Lin.Ft. 15" H.C.P. Chatsworth •,t. 5.43 5.97 2.5 Lin.Ft. 18" R.C.P. Maton St. 6.27 15.68 6.o Lin.Ft. 36" R.C.P. Victoria St. 9.21 55.26 273 Sq. Yd. Sod 0.35 99.05 Total Deductins TOTAL NET ADDITIONS ---------- 896.90 1)1 Ur, Duplicate to Printer CITY OF ST. PAUL FILE NCIL Na OFFICE OF THE CITY CLERK COUNCIL RESOLUTION-GENERAL FORM COMM SSDIONER Adrian P. Winkel DATE October 29, 1957 ': WREAS, Additions and Deductions which might prove to be necessary in the improvement described as the storm sewer system from Victoria, to Idaho, Comptroller's Contract L-5709, Wolff Construction Co. , Contractor, have been pro- vided for in the specificrtions at unit prices stipulated therein, and WHEREAS, it has been found. necessary to make the net addition set forth in the attached sheet ' i1EREA .i, the total Net Addition is '896.90, now there- fore, be it RESOLVED, that the City of St. Paul through its City Council approves the foregoinE addition in accordance with the specifications in the sum of =4:896.90, said sum to be added to the lump -sum consi deration named in the contract, known ns Comptroller's Contract L-5709, for the rr ±kine of the above improvement. The Commissioner of Public Works le.s agreed with the above named coti •rector that the sum of $396.90 is the correct amount to be added to the above contract. NOV 19 1963 COUNCILMEN Adopted by the Council 195— Yeas Nays �t,•)�] Gibbons Halvorson • Approved 195_ Holland Marzitelli Vtie'n Kat In Favor Mortinson Mayor Peterson Against Mr. President, Dillon 5M 6-55 ' ' ?