185197 .8)197
Original to City Clerl;
CITY OF ST. PAUL FILE NCIL NO.
OFFICE OF THE CITY CLERK
•
COUNCIL L TION-GENERAL FORM
PRESENTED BY Adrian P. Winkel October 29 1957
COMMISSIONER DATF Z____ —
41 File 1`'o. 185197—By Adrian •
•
and
, C.
WHEREAS, Additions and Deductions which might prove to
be necessary in the improvement described as the storm
sewer system from Victoria to Idaho, Comptroller's Contract
L-5709, Wolff Construction Co. , Contractor, have been pro-
vided for in the specifications at unit prices stipulated
therein, and
WHEREAS, it has been found necessary to make the net
addition set forth in the attached sheet
WHEREAS, the total Net Addition is $896.90, now there-
fore, be it
RESOLVED, that the City of St. Paul through its City
Council approves the foregoing addition in accordance with
the specifications in the sum of $896.90, said sum to be
added to the lump sum consi deration named in the contract,
known as Comptroller's Contract L-5709, for the making of
the above improvement.
The Commissioner of Public Works has agreed with the
above named contractor that the sum of $896.90 is the
correct amount to be added to the above contract.
�.._ � 1.
N U Ji 9196
COUNCILMEN Adopted by the Council 195_
Yeas 14/1" yi
•
4,0-. Approved 195_
Holland
1VIarzi lli W rn 5e-/ n Favor 111160.1 Q
Mortinson Mayor
Peterson�� � Against
Mr. President, lolXl n
PUBLISF /j-:a 3 -j
5M 6-55 2
. . . . i5J9'
ADDITIONS
Changes in length of pipe runs:
6.4 Lin.Ft. 12" V.C.P. Milton & Fisk Sts. (10'deep) 4.60 29.44
5.3 Lin.Ft. 12" V.C.P. Victoria St. 8'deep 4.00 21.20
20.0 Lin.Ft. 12" V.C.P. Victoria St. 11'deep 4.90 98.00
9.6 Lin.Ft. 15" B.C.P. Fisk & Idaho Sts. 6'deep 4.14 39.74
4.2 Lin.Ft. 18" R.C.P. Fisk St. 4'deep 4.08 17.14
1.5 Lin.Ft. 21" B.C.P. Milton St. 11'deep 7.95 11.93
4.0 Lin.Ft. 24" B.C.P. Larpenteur Ave. 6'deep 7.08 28:32
1.7 Lin.Ft, 33" R.C.P. Idaho Ave. 9'deep 12.84 21.83
4.7 Lin.Ft. 36" R.C.P. Victoria St. 9'deep 14.41 67.73
4.0 Lin.Fb. 60" R.C.P, Milton St. 21'deep 42.35 169.40
5.3 Lin.Ft. 60" B.C.P. Victoria St. 8'deep 28.28 149,88
8.0 Lin.Ft. Extra M.H. #2 @Fisk & Idaho 16.00 128.00
1 ea. Castings A & B 45.00
5.0 Lin.Ft. Extra M.H. depth at Como Blvd. 15.00 75,00
1 House Connection @ 928 Nebraska 17.63
2 No, 4A Catch Basins ® Idaho & Fisk 65.00 130.00
1 No, 4A Catch Basin 0 Hoyt & Victoria 65.00 65.00
1 Cu. Yd. Solid Bock-Excavation-Montana 15.00 15.00
Asphalt walk on Montana Ave. 20.00
Installation of 16" water main offset at
Iowa and Victoria -
Labor 73.39
Equipment Rental 94.00
Cleaning sewer on Victoria No. of Hoyt
Labor 98.01
Grading of Park property between Como &Arlington
Labor 177.78
Equipment Rental 151.75
Relaying sewer at Iowa & Milton due to water main
Labor 70.49
Equipment Rental 40.00
Total Additions $1,S55.66
DEDUCTIONS
10.3 Sq. Yd. Street restoration Victoria
& Montana 0.75 7.75
Curb not replaced Victoria & Montana
109.3 Lin.Ft. Straight curt) 2.10 229.53
10.0 Lin.Ft. Radius curb 2.40 24.00
144 Sq, Ft. Monolithic Concrete Sidewalk 0.50 72.00
2 IAA Catch basins - Idaho & Fisk 130.00 260.00
2 Side Inlets. - Idaho & Fisk 50.00 100.00
24 Lin.Ft. 12" V.C.P. Side inlet connections 2.75 66.00
Changes in length of pipe runs :
4.8 Lin.Ft. 12' R.C.P. Avon St. 4.90 23.52
1.1 Lin.Ft. 15" R.C.P. Chatsworth St. 5.43 5.97
2.5 Lin.Ft. 18" R.C.P. Milton St. 6.27 15.68
6.o Lin.Ft. 36" R.C.P. Victoria St. 9.21 55.26
283 Sq. Yd. Sod 0.35 99.05
Total Deductions $955.76
TOTAL NET ADDITIONS $896.90
.
• ADDITIONS
Changes in length of pipe runs :
6.4 Lin.Ft. 12" V.C.P. Milton 1 Fisk Sts. (101deep) 4.60 29.44
5.3 Lin.Ft. 12" V.C.P. Victoria St. 8'deep 4.00 21.20
20.0 Lin.Ft. 12" V.C.P. Victoria St. 111deep 4.90 98.00
9.6 Lin.Ft. 15" R.C.P. Fisk & Idaho Sts. 6'deep 4.14 39.74
4.2 Lin.Ft. 18" R.C.P. Fisk St. 4'deep 4.08 17.14
1.5 Lin.Ft. 21" R.C.P. Milton ll'cleep 7.95 11.93
4.0 Lin.Ft. 24" R.C.P. Larpenteur Ave. 6Ideep 7.08 28.32
1.7 Lin.Ft. 33" R.C.P. Idaho Ave. 9'deep 12.84 21.83
4.7 Lin.Ft. 36" R.C.P. Victoria St. 9'deep 14.41 67.73
4.0 Lin.Ft. 60" R.C.P. Milton St. 21'deep 42.35 169.40
5.3 Lin.Ft. 6o0 R.C.P. Victoria St. 8Ideep 28.28 149.88
8.0 Lin.Ft. Extra. M.H. • 2 ' Fisk & Idaho 16.00 128.00
1 ea. Castings A & B 45.00
5.0 Lin.Ft. Extra M.H. depth at Como Blvd. 15.00 75.00
a. House Connection f5; 928 Nebraska 17.63
2 No. 4A Catch Brains Idaho & Fisk 65.00 130.00
1 No. 4A Catch Basin CP, Hoyt & Victoria 65.00 65.00
1 Cu. Yd. Solid Bock-Excavation-Fontana 15.00 15.00
Asphalt walk on Montana. Ave. 20.00
Inst.T1latIon of 16" water main offset at
Iowa and Victoria
Labor 73.39
Equipment Rental 94.00
Cleaning sewer on Victoria No. of Hoyt
Labor 98.01
Grading of Park property between Como &Arlington
Labor 177.78
Equipment Rental 151.75
Relaying sewer at Iowa & Milton due to water main
Labor 70.49
.T,quipment Rental 40.00
Total Additions ------ :1, 855:66--
DEDUCTIONS
10.3 Sq. Yd. Street restoration Victoria
& Montana 0.75 7.75
Curb not replaced Victoria & Montana
109.3 Lin.Ft. Straight curb 2.10 229.53
10.0 Lin.Ft. Radius curb 2.40 24.100
144 Sq. Ft. Monolithic Concrete Sidewalk 0.50 72.00
2 IAA Catch basins - Idaho & Fisk 130.00 260.00
2 Axle Inlet r - Idaho & Fisk 50.00 100.00
24 Lin.Ft. 12" V.C.P. Side inlet connections 2.75 66.00
Changes in length of pipe runs :
4.8 Lin.Ft. 12" R.C.P. Avon St. 4.90 23.52
1.1 Lin.Ft. 15" H.C.P. Chatsworth •,t. 5.43 5.97
2.5 Lin.Ft. 18" R.C.P. Maton St. 6.27 15.68
6.o Lin.Ft. 36" R.C.P. Victoria St. 9.21 55.26
273 Sq. Yd. Sod 0.35 99.05
Total Deductins
TOTAL NET ADDITIONS ---------- 896.90
1)1 Ur,
Duplicate to Printer
CITY OF ST. PAUL FILE NCIL Na
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION-GENERAL FORM
COMM SSDIONER Adrian P. Winkel DATE October 29, 1957
': WREAS, Additions and Deductions which might prove to
be necessary in the improvement described as the storm
sewer system from Victoria, to Idaho, Comptroller's Contract
L-5709, Wolff Construction Co. , Contractor, have been pro-
vided for in the specificrtions at unit prices stipulated
therein, and
WHEREAS, it has been found. necessary to make the net
addition set forth in the attached sheet
' i1EREA .i, the total Net Addition is '896.90, now there-
fore, be it
RESOLVED, that the City of St. Paul through its City
Council approves the foregoinE addition in accordance with
the specifications in the sum of =4:896.90, said sum to be
added to the lump -sum consi deration named in the contract,
known ns Comptroller's Contract L-5709, for the rr ±kine of
the above improvement.
The Commissioner of Public Works le.s agreed with the
above named coti •rector that the sum of $396.90 is the
correct amount to be added to the above contract.
NOV 19 1963
COUNCILMEN Adopted by the Council 195—
Yeas Nays �t,•)�]
Gibbons
Halvorson • Approved 195_
Holland
Marzitelli Vtie'n Kat In Favor
Mortinson Mayor
Peterson Against
Mr. President, Dillon
5M 6-55 ' ' ?