Loading...
18583118 831 COUNCIL FILE N0_________________________ By_ I --------------------------------- Council File No. 185831- . FINAL ORDER In the matter of grading and sur- .h 1 1Z1J 1 l.11 11, I facing with bituminous inaterial the alley in Chute Bros. Division No. i1, fr( "1 r'Frotto St, to Avon St. Also con - In the Matter of grading and surfacing with bituminous material the alley in Chute Bros. Division No. 11, from Grotto St. to Avon St. Also constructing a sewer from the alley to Edmund Ave. in an easement to be obtained on, under and across the westerly 4 ft. of the easterly b ft. of Lot 23, Chute Bros. Division No. 11, under Preliminary Order_____________ 185?4l November __________________a pp roved ___________ - - - 2- 1 - �,___1 95 7---------------- --- Intermediary Order _ ______________ ____________approved _ ----------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is. grade and surface with bituminous material the alley in Chute Bros. Division No. 11, from Grotto St. to Avon St. Also construct a sewer from the alley to Edmund Ave. in an easement to be obtained on, under and across the westerly 4 ft. of the easterly b ft. of Lot 23, Chute Bros. Division No. 11, and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. Adopted by the Council--JAR-2-1 _ -1953______ ___ �. City Clerk. JAN2 x.195Z__" � Appproved - -- ------- - - - - -- - - -- ----------- �--- - - - - -- PUBLISHEii — n i; L 1 File13915 - --=---- _------ '------- - - - - -- ---------------------------------------------- Mayor. Councilman Councilman DeeCCODU�Y Councilman MURTINSON Councilman PETERSON Councilman f\ .,. Councilman ROSEN ROSEN WINKEL Mayor DILLON 2 -55 2M 2 CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER In the ma;terof grading and surfacing with bituminous material the alley in Chute Bros. Division No. 11, from Grotto St. to Avon St. Also constructing a sewer from the alley to Edmund Ave. in an easement to be obtained on, under and across the westerly 4 ft. of the easterly 6 ft. of Lot 23, Chute Bros. Division No. 11, 18 a831 under Preliminary Order approved iove=be-,r 21, 1957 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated amount of the assessment for the above improvement is - - $ 5.107.30 The estimated cost per foot for the above improvement is - - - - - - - $_._?±.30 The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: DESCRIPTION LOT I BLOCK ADDITION ASSESSED VALUATION I Iaxld Eldg. i ' 2 3 i 4 13 14, FORM B.B.II Chute Brothers Division No. 11 $650 $2900 'Addition to the City of St, ;Paul, Minnesota 600 2750 1 do 170 do 600 do 604 3600 ao 600 3000 duo 600 3250 J do 600 2750 do boa 2600 do 600 L 5C s'Ann do 600 1750 do 600 2950 TOTAL (B) -- DESCRIPTION CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER LOT BLOCK ADDITION ASSESSED ALU A T I 1$� Chute Brothers Division lac•, 11 $8W $4200 Addition to the City of St. 16 Paul, Minnesota 750 1+200 i 117 I do 650 2950 I 1c; do 650 3400 191 c.o 65C 2300 20 I do 65c, 2200 21 do 650 3250 22 l do 650 2650 i 23 i do 650 1900 24 do 650 2750 25 uo 650 5600 26. i � do 650 3750 I 27� do 650 5250 28 do 650 1950 29I I do 600 1150 30( i do i000 6200 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Dated December 24 19 5h ; t4A40 ,. // %Y1 Norm B. S. A. 8 -5 D Commissioner of Finance Ci • To The Honorable, The Council, City of St. Paul, Minn. RECr, A St. Paul, Minn.---------- S - E - P -- I -- 1 1956 -----------------19-------- BEPT, OF PUBLIC WORKS Gentlemen: We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: ----------------- 044 ---------- --------------- ----------"-------"--"e - -- -- -- =� ---------- " Z ------- - • - ----------------------------------- Ave- . from---- ------------------------------------------ St—Ae*e. to------------- ---- - - - - -- ------------------------------------ --------------------------------------------------------- - - -St. Z240V-e: NAME LOT BLOCK ADDITION 641A pk�-- J -27 f L- yell � `� �� A 6M 5-56 -qp-2 1 � t ADDITION. ADDITION -M. • 11 • • To The Honorable, The Council, City of St. Paul, Minn. 1�� �e St. Paul, Minn ----------------------------------------- 19 -------- Gentlemen: We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: - -------- ------ t� ------ ---- ------ e-ZI ------------------------ -----A--- --e - ------ --------- 4 5 Z' ------- -- al*- .-------- --4----- - Ave. - ---------- from ---------------------- ----------------- St. . to - - - - -- -------------------------------- ---------------- ---------------------------------------- - - -St. --AT-Cr- NAM + LOT BLOCK ADDITION 01 44-- C� All ADDITION +DITION Da 0 ASSISTANT CHIEF ENGINEER HERBERT S. WEST PUBLIC WORKS DESIGN ENGINEER ARTHUR G. WELIN . . BRIDGE- ENGINEER MAURICE W. HEWETT TRAFFIC ENGINEER EUGENE V. AVERY CITY OF SAINT PAUL Capital of Minnesota DEPARTMENT OF PUBLIC WORKS ADRIAN P. WINKEL, Commissioner CLIFTON G. HOLMGREN, Deputy Commissioner GEORGE M. SHEPARD, Street & Highway Engineering Coordinator ARTHUR W. TEWS, Chief Engineer November 26, 1957, Hon. Adrian P Winkel Commissioner of Public Works City of St. Paul Dear Sir: PUBLIC WORKS MAINTENANCE ENGRs RICHARD L. WHEELER BUREAU OF SANITATION JOHN M. COTTER, Supt. BUREAU OF MUNICIPAL EQUIPMENT ARTHUR H. KOCH O PRINCIPAL ACCOUNTANT JOS. PAVLICEK • I transmit herewith preliminary estimate of cost for grading and surfacing with bituminous material the alley in Chute Bros. Division No. 11, from Grotto Street to Avon Street. Also constructing a sewer from the alley to Edmund Avenue in an easement to be obtained on, under and across the westerly 4 feet of the easterly 6 feet of Lot 23, Chute Bros. Division No. 11, under Preliminary Order C. F. 185241, approved November 21, 1957. Estimated Cost $5,107.30 Engineering 297.08 Inspection 94.32 Cost per front foot 4.30 Frontage 1188.33 ft. Yours very truly, Az W. Tews Chief Engineer Approved for transmission Z ae Commissions of Finance n P. Winks 1 2 Commissioner of Public Works y iii T a.. Y OFFICE OF THE COMMISSIONER OF PUBLIC WORKS REPORT TO COMMISSIONER OF FINANCE November 26th To the Commissioner of Finance of the City of Saint Paul: /,3 y %� - 19 57 The Commissioner of Public Works, having had under consideration the prelimin- ary order of the Council, known as Council File No. 185241 approved November 21 �19 57 , relative to grading and surfacing with bituminous material the alley in Chute Bros. Division No. 11, from Grotto Street to Avon Street. Also constructing a sewer from the alley to Edmund Avenue in an easement to be obtained on, under and across the westerly 4 feet of the easterly 6 feet of Lot 23, Chute Bros. Division No. 11, _ �~ and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. 2. The estimated cost thereof is 5,107.30 , and the total cost thereof Engineering $297.08 Inspection $94.32 is $ and the nature and extent of said improvement is as follows: Cost per front foot $4.30 Frontage 1188.33 ft. 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 4. 5. Said improvement is asked for upon petition of three or more owners of property, subject to assessment for said improvement. Commissioner of Public 1`lorks. C Z )D U -i 4 D x. i VLc TOQIA S T. co in 10 m la Z r A vo N 5T 1 GQoTTO 8 -r 5T. ALBANS S-T D F� a < < < i DAL F sT. IIL _ 4 N z PI p n W � o 1 a N W Cb n � = G r O Z D N 5T 1 GQoTTO 8 -r 5T. ALBANS S-T D F� a < < < i DAL F sT. IIL _ 4 N z PI p n W � o 1 a N W Cb