18583118 831
COUNCIL FILE N0_________________________
By_ I ---------------------------------
Council File No. 185831-
. FINAL ORDER In the matter of grading and sur-
.h 1 1Z1J 1 l.11 11, I facing with bituminous inaterial the
alley in Chute Bros. Division No. i1,
fr( "1 r'Frotto St, to Avon St. Also con -
In the Matter of grading and surfacing with bituminous material the alley in
Chute Bros. Division No. 11, from Grotto St. to Avon St. Also constructing a sewer
from the alley to Edmund Ave. in an easement to be obtained on, under and across the
westerly 4 ft. of the easterly b ft. of Lot 23, Chute Bros. Division No. 11,
under Preliminary Order_____________ 185?4l November
__________________a pp roved ___________ - - - 2- 1 - �,___1 95
7---------------- ---
Intermediary Order _ ______________ ____________approved _
-----------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is. grade and surface with bituminous material the
alley in Chute Bros. Division No. 11, from Grotto St. to Avon St. Also construct a
sewer from the alley to Edmund Ave. in an easement to be obtained on, under and
across the westerly 4 ft. of the easterly b ft. of Lot 23, Chute Bros. Division No. 11,
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council--JAR-2-1 _ -1953______
___
�. City Clerk.
JAN2 x.195Z__" � Appproved - -- ------- - - - - -- - - -- ----------- �--- - - - - --
PUBLISHEii — n i; L 1
File13915 - --=---- _------ '------- - - - - -- ----------------------------------------------
Mayor.
Councilman
Councilman DeeCCODU�Y
Councilman MURTINSON
Councilman PETERSON
Councilman f\
.,.
Councilman ROSEN ROSEN WINKEL
Mayor DILLON
2 -55 2M 2
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
In the ma;terof grading and surfacing with bituminous material the alley in Chute Bros.
Division No. 11, from Grotto St. to Avon St. Also constructing a sewer from the alley to
Edmund Ave. in an easement to be obtained on, under and across the westerly 4 ft. of the
easterly 6 ft. of Lot 23, Chute Bros. Division No. 11,
18 a831
under Preliminary Order approved iove=be-,r 21, 1957
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated amount of the assessment for the above improvement is - - $ 5.107.30
The estimated cost per foot for the above improvement is - - - - - - - $_._?±.30
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or
parcel as last reported by the Assessor, are as follows:
DESCRIPTION LOT I BLOCK ADDITION ASSESSED
VALUATION
I Iaxld Eldg.
i '
2
3
i
4
13
14,
FORM B.B.II
Chute Brothers Division No. 11
$650
$2900
'Addition to the City of St,
;Paul, Minnesota
600
2750
1 do
170
do
600
do
604
3600
ao
600
3000
duo
600
3250
J do
600
2750
do
boa
2600
do
600
L 5C
s'Ann
do
600
1750
do
600
2950
TOTAL
(B) --
DESCRIPTION
CITY OF ST. PAUL
DEPARTMENT
OF FINANCE
REPORT OF COMMISSIONER OF
FINANCE
ON PRELIMINARY
ORDER
LOT
BLOCK
ADDITION
ASSESSED
ALU A T I
1$�
Chute Brothers Division lac•, 11 $8W
$4200
Addition to the
City of St.
16
Paul, Minnesota
750
1+200
i
117 I
do
650
2950
I
1c;
do
650
3400
191
c.o
65C
2300
20
I
do
65c,
2200
21
do
650
3250
22
l
do
650
2650
i 23
i
do
650
1900
24
do
650
2750
25
uo
650
5600
26.
i
�
do
650
3750
I
27�
do
650
5250
28
do
650
1950
29I
I
do
600
1150
30(
i
do
i000
6200
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and
hereby submits the foregoing as his report thereon to the Council, together with the report made to him in
reference to said matter by the Commissioner of Public Works.
Dated December 24 19 5h ; t4A40 ,. // %Y1
Norm B. S. A. 8 -5 D
Commissioner of Finance
Ci
•
To The Honorable, The Council,
City of St. Paul, Minn.
RECr, A
St. Paul, Minn.---------- S - E - P -- I -- 1 1956 -----------------19--------
BEPT, OF PUBLIC WORKS
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
----------------- 044 ---------- ---------------
----------"-------"--"e - -- -- -- =� ---------- " Z -------
-
• - ----------------------------------- Ave- .
from---- ------------------------------------------ St—Ae*e. to------------- ---- - - - - -- ------------------------------------
--------------------------------------------------------- - - -St. Z240V-e:
NAME
LOT
BLOCK
ADDITION
641A pk�--
J
-27
f
L-
yell
� `� ��
A
6M 5-56 -qp-2
1 � t
ADDITION.
ADDITION
-M.
•
11
•
• To The Honorable, The Council,
City of St. Paul, Minn.
1��
�e
St. Paul, Minn ----------------------------------------- 19 --------
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
- -------- ------ t� ------ ---- ------ e-ZI ------------------------
-----A--- --e - ------ --------- 4 5 Z'
------- --
al*- .--------
--4----- - Ave. -
----------
from ---------------------- ----------------- St. . to - - - - -- --------------------------------
---------------- ---------------------------------------- - - -St. --AT-Cr-
NAM +
LOT
BLOCK
ADDITION
01
44--
C�
All
ADDITION
+DITION
Da
0
ASSISTANT CHIEF ENGINEER
HERBERT S. WEST
PUBLIC WORKS DESIGN ENGINEER
ARTHUR G. WELIN
. .
BRIDGE- ENGINEER
MAURICE W. HEWETT
TRAFFIC ENGINEER
EUGENE V. AVERY
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WINKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator
ARTHUR W. TEWS, Chief Engineer
November 26, 1957,
Hon. Adrian P Winkel
Commissioner of Public Works
City of St. Paul
Dear Sir:
PUBLIC WORKS MAINTENANCE ENGRs
RICHARD L. WHEELER
BUREAU OF SANITATION
JOHN M. COTTER, Supt.
BUREAU OF MUNICIPAL EQUIPMENT
ARTHUR H. KOCH
O
PRINCIPAL ACCOUNTANT
JOS. PAVLICEK
•
I transmit herewith preliminary estimate of cost for grading and
surfacing with bituminous material the alley in Chute Bros. Division No. 11,
from Grotto Street to Avon Street. Also constructing a sewer from the alley
to Edmund Avenue in an easement to be obtained on, under and across the
westerly 4 feet of the easterly 6 feet of Lot 23, Chute Bros. Division No. 11,
under Preliminary Order C. F. 185241, approved November 21, 1957.
Estimated Cost $5,107.30
Engineering 297.08
Inspection 94.32
Cost per front foot 4.30
Frontage 1188.33 ft.
Yours very truly,
Az
W. Tews
Chief Engineer
Approved for transmission
Z ae Commissions of Finance
n P. Winks 1 2
Commissioner of Public Works y
iii
T
a..
Y
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
November 26th
To the Commissioner of Finance of the City of Saint Paul:
/,3 y %� -
19 57
The Commissioner of Public Works, having had under consideration the prelimin-
ary order of the Council, known as Council File No. 185241 approved
November 21 �19 57 , relative to grading and surfacing with bituminous
material the alley in Chute Bros. Division No. 11, from Grotto Street to Avon Street.
Also constructing a sewer from the alley to Edmund Avenue in an easement to be obtained
on, under and across the westerly 4 feet of the easterly 6 feet of Lot 23, Chute Bros.
Division No. 11, _ �~
and having investigated the matters and things referred to therein, hereby reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is 5,107.30 , and the total cost thereof
Engineering $297.08 Inspection $94.32
is $ and the nature and extent of said improvement is as follows:
Cost per front foot $4.30 Frontage 1188.33 ft.
3. A plan, profile or sketch of said improvement is hereto attached and made
a part hereof.
4.
5. Said improvement is asked for upon petition of three or more
owners of property, subject to assessment for said improvement.
Commissioner of Public 1`lorks.
C
Z
)D
U
-i
4
D
x.
i
VLc TOQIA S T.
co
in
10
m
la
Z
r
A vo N
5T
1
GQoTTO 8 -r
5T. ALBANS S-T
D
F�
a
< < <
i
DAL F sT.
IIL _
4
N
z
PI
p n
W �
o
1
a
N
W
Cb
n
�
=
G
r
O
Z
D
N
5T
1
GQoTTO 8 -r
5T. ALBANS S-T
D
F�
a
< < <
i
DAL F sT.
IIL _
4
N
z
PI
p n
W �
o
1
a
N
W
Cb