Loading...
185801....►_ Original to City Clerks JC��� 1 CITY OF ST. PAUL FILE NCIL NO. OFFICE OF THE CITY CLERK COUN 1L- RESOLUTION — GENERAL FORM PRESENTED BY / r COMMISSIONERt- ��14t1___ /4/_/t fw "1 /� DATE Council File No. 185801 —By Adrian P. Winkel— Whereas, Additions which might prove to be necessary in the improvement d—cr4') ^d is T70LTT ^nnrK SEIVER WHEREAS, Additions which might prove to be necessary in the improvement described as TROUT' BROOK SEWER-- RICE- I�IACKUBIN Comptroller's Contract L- 5655 -3, Peter Lametti Construction Co., have been provided for in the specifications at unit prices stipulated therein, and WHEREAS, it has been found necessary to make the following ADDITIWS: See attached sheet (The additional amount is to be financed from 1957 31 E -1) WHEREAS, the Total net Addition is $ 28,294.69, now therefore, be it RESOLVED, that the City of St. Paul through its City Council approves the foregoing addition in accordance with the specifications in the sum of $28,294.69, said sum to be added to the lump sum consideration named in the contract, knovm as Comptroller's Contract L- 5655 -3, for the making of said improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $ 28,294.69 is the correct amount to be added to the above contract. JAN 16 1-0058 COUNCILMEN Adopted by the Council 195 — Yeas Nays )Odhbtm DeCourcy JAN 16 9958 :ffalmrsvn R o s e n Approved 195 — Holland w-, ,Ma=itedk Winkel n Favor �. Mortinson 3 Mayor Peterson - Against Mr. President, Dillon pUBLISHED1— /�' �' 2 Duplicate to Printer PRESENTED BY COMMISSIONE COUNCIL CITY OF ST. PAUL FILE NO. OFFICE OF THE CITY CLERK COUNCIL RESOLUTION— GENERAL FORM 411ERZAS, AddilCions which might prove to be necessary in the improvement described as TOUT BROOK SE''uER- _HXE- MACKUBIN Comptroller's Contract L- 5655 -3, Peter La.°.ik:tti 'Unstruction Co., have bc�an provided for in the specifications at unit prices stipulated therein, and 14I4M AS, it has been ::ounce necessary to r'slke th^ following ADDITIONS: See attached sheet (The additional amount. is to be financed fr(xn 1957 31 E -1) 11HE.REAS9 the Total not ",dlition is $ 23,294.61,10 now therefore, be it RESOLVED, that the City of St. Paul through its City Council approves the foregoing addition in ,acc= ance wit'a the specifications in the sm. of $28,294.69, said sin to be added to the lmip surn consideration na -med in -io contract, knov.ii as Comptroller's contract L- 5655 -3, for the making of said 3.z :proves ent . The Commissioner of Public Works has agreed with the above narnt:d contractor that the surf of $ 23,294.69 is the correct amount to he added? to the abovo contract. COUNCILMEN Yeas Nays .'Mbotw DeCourcy Holland ,Xa=ftWR V'1 nkel In Favor Mortinson Peterson Against Mr. President, Dillon .rail 2 JAN 16 1955 Adopted by the Council 195_ JAN 16 1958 Approved 195— Mayor Due to unsuitable foundation material encountered on Arundel St. from Larpenteur Ave. south, and on Marion St. between Nebraska and Hoyt Avenues it was necessary to furnish and drive additional treated timber piling and place reinforced concrete slab and concrete saddle on Arundel St. from Larpenteur Ave. south for a distance of 369 feet and to extend the re- inforced concrete slab and concrete saddle on Marion St. for a distance of 150 feet north of the original plan location. 31395 L.Ft. Treated Timber Filing, complete in place 2.54 89623.30 144 C.Yds Concrete Class "Alf inc. cost of forms 30.00 49320.00 96.11 C.Yds " It " " tt 20.00 1,922.20 239531.7 Lbs. Steel, K°inforcement, complete in place .12 3.50 2,823.80 245.00 70 C.Yds Earth Exc. below 12' depth " 11 3.00 462.00 154 C.Yds 121 depth Drainage structures placed at Nebraska R Marion, and Nebraska & Albemarle to drain adjacent areas previously drained by a 1511 tile line which was removed. NEBRASKA -tVV,R ION 2 3A Catch Basins 120.00 240.00 2 Manhole Cover Castings, Frame "A" 31.00 62.00 2 It if It It I'D" 19.00 38.00 52 L.Ft. 1211 VCP Sewer Connection 3.00 156.00 NEBRASKA- ALBEMARLE 2 3A Catch Basins 120x00 240,00 2 Manhole Cover Castings, Frame "A" 31.00 62.00 2 it it tt tt I'D" 19.00 38.00 36 L.Ft. 12t1 VCP Sewer Connection 3.00 108.00 Labor and equipment for breaking frost for trench excavations 279.94 Granular backfill material placed around sewer pipe through peat areas to insure the laterEl stabil- ity of the sewer along Larpenteur and Arundel 625 C.Yds Sand 2.75 11,718.75 Reconstruct catch basin connections at Marion and Wheelock 69 L.Ft. Wipe coon. to main sewer,inc.exc for C.B. 3.00 207.00 19062 C.Yds Crushed Rock or Gravel Sub -base material for sewer 6.00 60372.00 Miscellaneous work not included in contract Install grate on headwall at Marion north of Wheelock 27.88 Retaining wall at cult'. on Larpenteur west of Galtier 37.63 Cleaning 48" Line Mackubin -Idaho 196.57 Reconstruct existing 4811 sewer at junction with new sewer Idaho- rlackubin _ 114.62 28,294.69 TROUT BROOK SEWER (RICE TO MACKUBIN ) 56 -S -46 K)8 )i Due to unsuitable foundation material encountered on Arundel St. from Larpenteur Ave. south, and on Iviarion St. between Nebraska and Hoyt Avenues it was necessary to furnish and drive additional treated timber piling and place reinforced concrete slab and concrete saddle on Arundel St. from Larpenteur Ave. south for a distance of 369 feet and to extend the re- inforced concrete slab and concrete saddle on Marion St. for a distance of 150 feet north of the original plan location. 39395 L.Ft. Treated Timber Piling, complete in place 2.54 89623.30 144 C.Yds Concrete Class "A" inc. cost of forms 30.00 4,320.00 96.11 C.Yds " 11 TIC" 11 11 " 20.00 11922.20 23,531.7 Lbs. Steel Reinforcement, complete in place .12 2,823.80 70 C.Yds Earth Exc. below 121 depth 3.50 245.00 154 C.Yds if it 121 depth 3.00 462.00 Drainage structures placed at Nebraska & Marion, and Nebraska & Albemarle to drain adjacent areas previously drained by a 1511 tile line which was removed. NEBRASKA - MARION 2 3A Catch Basins 120.00 240000 2 Manhole Cover Castings,.Frame "A" 31.00 62.00 2 11 11 11 t1 "D" 19.00 38.00 52 L.Ft. 12t1 VCP Sewer Connection 3.00 156.00 NEBRASKA- ALBEMARLE 2 3A Catch Basins 120,00 240.00 2 Manhole Cover Castings, Frame "A" 31.00 62.00 2 11 11 11 11 "D" .19.00 38.00 36 L.Ft. 1211 VCP Sewer Connection 3.00 108.00 Labor and equipment for breaking frost for trench excavations 279.94 Granular backfill material placed around sewer pipe through peat areas to insure the lateral stabil- ity of the sewer along Larpenteur and Arundel 625 C.Yds Sand 2.75 1,718.75 Reconstruct catch basin connections at Marion and Wheelock 69 L.Ft. Pipe conn. to main sewer,inc.exc for C.B. 3.00 207.00 1,062 C.Yds Crushed Rock or Gravel Bub -base material for sewer 6.00 62372.00 Miscellaneous work not included in contract Install grate on headwall at Marion north of Wheelock 27.88 Retaining wall at cult'. on Larpenteur west of Galtier 37.63 Cleaning 48" Line Mackubin -Idaho 196.57 Reconstruct existing 4811 sewer at junction with new sewer Idaho- Mackubin _ 114.62 28,294.69