Loading...
185401Orbrinal to city.Cierk • . CITY OF ST. PAUL OFFICE OF THE CITY CLERK COUNCIL RESO U � — GENERAL FORM PRESENTED BY Adrian P Winkel FILE NCIL December 10 Council File No. 185401 —Hy Adrian P. Winl- no Additions �4i 4 �� which might. prove to b! n ary in the improvement described, as the repaving job on Raymond 'Avenue' from University to Como, Comptrgller's �ne.c.... -;. r.....�f't A_ _ Bros._C,o;,,l Thornton _ WHEREAS, Additions and Deductions which might prove to be necessary in the improvement described as the repaving job on Raymond Avenue from University to Como, Comptroller's Contract L- 5793 -A, Thornton Bros.9o., Contractor, have been provided for in the specifications at unit prices stipulated therein, and WHEREAS, it has been found necessary to make the following additions and deductions: (See attached Sheet) (This additional amount to be charged to Bond Fund 200 St -25) WHEREAS, the total Net Addition is $15,676,00, now there- fore, be it RESOLVED, that the City of St. Paul through its City Council approves the foregoing addition in accordance with the specifications in the sum of $15,676.00, said sum to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L- 5793 -A, for the making of said improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $15,,676,00 is the correct amount to be added to the above contract, V60 101951 COUNCILMEN Adopted by the Council_ 95— Yeas Nays DEC 1 Q 195 MR17ursaw• Approved 196 — Holland c marziteth n Favor Mortinson ^ Mayor Peterson ( J Against Mr. President, Dillon PUBLISHED _ SM 6.55 offlP-2 Duplicate to Printer COUNCIL CITY OF ST. PAUL FILE NO OFFICE OF THE CITY CLERK COUNCIL RESOLUTION—GENERAL FORM PRESENTED BY Adrian P. Winkel DATE December 10, 1957 COMMISSIONER - I WHEREAS, Additions and Deductions which might prove to be necessary in the improvement described as the repaving job on Raymond Avenue from University to Como, Comptroller's Contract L-5793-A, Thornton Bros.9o., Contractor, have been provided for in the specifications at unit prices stipulated therein, and it bas been found necessary to m,,.ke the following additions and deductions: (See attached Sheet) (This additional amount to be charged to Bond Fund 2C0 3t-25) WHIEREA.R9 the total Net Addition Is 115, 676.00, now there- fore, be It 1iE_C11VEDV that the City of St. Paul through Its City Council approves the foregoing addition in accordance with the specifications In the sum of $15,676.00, said sum to be added to the lump sum consideration named In the contract, known as Comptroller's Contract L-5793-A, for the makin� of said improvement. The Commissioner of Public Works has apreed with the above named contractor �aa-t the sum of $15,676.00 is the correct amount to be added to the above contract. COUNCILMEN Yeas Nays –Gibbona-- Halvorson- Holland Warzitelli- Mortinson Peterson Mr. President, Dillon A 6-55 -��M02 In Favor Against Adopted by the Council ;V_J; a. 195— Approved _195— Mayor REPAVING RAYMOND AVENUE from University Avenue to Como Avenue Contract No. 56-P-1-157 ADDITIONS L-5793 A - fm 11.0 Cu. Yd. Excavation- removal of unsuitable mat - @ 1.25 = $ 13.75 erial at N. P. underpass 72,0 Cu. Yd. Embankment -Sand fill @ 1025 - 90000 2 Remove trees C 65.00 a 130.00 225.0 Sq. Yd. Remove Concrete base @ 1.10 = 247.50 1225.0 Sq. Yd. Remove asphalt surface on bridge @ 1.15 - 1,408,75 1217.8 Tons Asphaltic Concrete Binder Course - (Class D) @ 10000 = 12,178.00 125.0 Sq. Yd, 711 Concrete base @ 4.50 = 562.50 10.0 Cu. Yd. Concrete Leveling Course P 21.50 = 980,00 12.0 Lin,Ft, 7" x 18" Radius Concrete Curb @ 2.00 21.00 2.0 Lin.Ft. Saw Joints @ 0.70 = 1,40 11.0 Lin. Ft. Rebuild Catch Basins @ 12.00 ' 48.00 12.0 Lino Ft. 12t1 V.C.P. Catch Basin Connection @ 3.50 a 12.00 DEDUCTIONS 14.0 Lin, Ft, 7" x 1811 Straight Concrete Curb Painting Guard Rail Posts y} 15, 725.90 @ 1.85 = ' 25.90 2.00 49o90 TOTAL ADDITIONS a 15,676.0' REPAVING RAYMOND AVENUE from University Avenue to Como Avenue Contract No. 56 -P -157 11,0 Cu. Yd, 72.0 Cu. Yd, 2 225.0 Sq. Yd. 1225.0 Sq. Yd, 1217.8 Tons 125.0 Sq. Yd. 40.0 Cu. Yd. 12.0 Lin.Ft. 2.0 Lin. Ft, 4.0 Lin. Ft. 1290 Line Ft. 14.0 Lin. Ft. L-5793 A - ADDITIONS @ 10.00 - 12..178.00 Excavation- removal of unsuitable mat - Oc 1.25 - $ 13.75 erial at N. P. underpass @ 24.50 - 980,00 Embankment-Sand fill @ 1.25 - 90.00 Remove trees @ 65.00 - 130000 Remove Concrete base @ 1.10 = 247.50 Remove asphalt surface on bridge @ 1.15 - 1,0408.75 Asphaltic Concrete Binder Course- (Class D) @ 10.00 - 12..178.00 711 Concrete base @ 4.50 - 562050 Concrete Leveling Course @ 24.50 - 980,00 71' x 18" Radius Concrete Curb @ 2.00 - 24.o0 Saw Joints @ 0.70 - 1140 Rebuild Catch Basins @ 12.00 - 48.00 121' V.C.P. Catch Basin Connection 01 3.50 - 12.00 DEDUCTIONS 7" x 18" Straight Concrete Curb Painting Guard Rail Posts $> 15,1725-90 @ 1.85 - $1 25.90 24.00 y X9.90 TOTAL ADDITIONS $ 15,676.00