189765It In the Matter of
COUNCIL FILE NO.
By---- - - - - -- - - - - -- =--- - - --= =-
I-- - - - - --
t FINAI t MWERS
FINAL ORDER
f?
E�> 2'IYa�. `ilia ;�� t•4.� +
-
,.
grading Beech Street from Birmingham Street to Johnson Parkway
under Preliminary Order----- - - - - -- 188403--------------- - - - - -- approved ------ - Su1Y-- 17,. -- 1958 ------
Intermediary Order ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is. to grade Beech Street from Birmingham ^,treet
to Johnson Parkway
and the Council hereby orders said improvement to be made.
RESOLVED- FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvem�e 18g accordance th ewil,
Adopted by the Council - - -�V -------------------------- - -i 9 !/
NOV a 1958
- Approved - -- --------------------------------------------
File 14159
Councilman D.000RCY
Councilman;,9
Councilman' MOR7INSON
Councilman= PETERSON
Councilman. ROSEN
Councilman WINKEL
Mayor DILLON
2.55 2M 2 _
b
P�I,ISI D % 7' '51
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
(A) ON PRELIMINARY ORDER 1- 819452
In the matter, of Grade Beech Street from Birmingham Street to Johnson Parkways F
6,9411
under Preliminary Order approved July 17, 1958
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $ 150121.80
The estimated assessment per foot for the above improvement is - - - - $ 6.05
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
Form B. B. 10 1M 3 -58 8
• I
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION II
LAND VALUATION BLDG.
!1
1 131
1
lKnauft's Addition to the Citv
A 2oo
11
1 141
1
lof St. Paul
II1
1511
1 do
300
II
1 161
1
1 do 1I
300
i11
171
1
1 do
300 10900
II
I 181
1
1 do li
200 150
1 191
1
1 do II
175
11
1 201
1
1 do 1I
175
11
I 211
1
1 do
175
11
1 2211
1 do
1
Form B. B. 10 1M 3 -58 8
• I
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)
IIDESCRIPTION
I
LOT
B
ADDITION II
LAND VALUATION BLDG.
II
1
231
1 1
Bnauft' s Addition to the City11
A 175
1
241
1 1
of St. Paul
11 150
IlNorth
of vacated alley adjoining I
I I
11
Il
and 1
11
2 1
do
4,425 550
1�
do 1
2121
do
II
!1 do 1
31
21
do
!I. do I
41
2 1
do
I! do
L 5
2
1 do
40
1
12
1 do
do
71
2
1 do
do
I
I 2
1
li do
1
1 do
I
12
1 do
1Ido
1 121
2
1 do .4
11
1 71
1
IMagler's Subdivision
II 12K
II
1 811
1 do
11 75
II
1 911
1 do
11 75
1 1011
1 do
11 75
II
1 111
1
1 do
11 75
1.1
1 1211
1 do
II 75
I�
1 1121
do
75
II
1 212
1 do
11 75
Il
1 312
1 do
11 75
11
1 x.12
1 do
11 75
II
I 51
2
I do
11 12
TOTAL
II
FORM 2.0.11 000 3-29 8
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)
IIDESCRIPTION I LOT IBLOCKI ADDITION II LAND VALUATION
I► I I I II
of eaqt � �T I I I II
II south of Beech St. of Lot 3. Hnmec for the_RnMeleSS,� I to I 2 I Mauler's Sub ra; V1.a; C1]1 II ���n
�I East�of east 39 feet �.of� art of
II
Lot .q,, Homes for the Homel-
Ii i bet�reen ss-
Beeeh�St. and extended I! I I I I
II
center line of alley-in 'Block 2;
IIWallhlomb Addition; and I 6 12 I Wallblomis Addition lno
d0 II 7c:
2 I do I� 7K
I!
� 9 do 75
III
II I I i do
I! I l I I do II 7K
II 1 711 do II 75
!I 181 1 1 do II 7g
II I 9 I 1 do II 75
I! 110 I 1 I do Il 75
�! 111111 do 714
12 I 1 I do II 714
IILots 7 and 18 i 1 I Schoch I s and Al than i s Subd; v; s; cyn ion
II I 9 I 1 ( of Lot of Homes for the II KO
II 110 I 1 I Homeless Kn
II 11 I 1 I d Kn
II 112 I 1 I do II KO
II 1 1 1 2 1 do II 50
II 1 2 1 2 1 do II 50
TOTAL
FORM 9.3.11 goo a•n $
7
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
II
DESCRIPTION
I LOT
IBLOCKI
ADDITION
VALUATION
II ASSESSED
LAND BLDG.
Lots 3 5 and ;i
, , _
I 6
! 2
t
I Schoch 's and Althen s Sub ; v; a; cUn
A 9Ofl S
of Lot '5 of Homes for the
II
II
!
I
lHomeless
II
IIExcept
east 140 ft.; the south
!
I
! Homes for the Homeless
II
II
143 feet of north 296 feet of
! 6
!
I
!! 12K
IISubject
to Birmingham St.; the
I
!
IIsouth
83.05 feet of east 140 feet
!
!
!
IIof
that part north of north line of!
!
!
!I
Beech St. of
! 6
!
I do
11
(!Subject
to Birmingham St. and
!
'
Ilexcept
south 183 feet; the east
!
I
!
i1140
feet of part lying south of
I
!
I
II
lisouth
line of Beech St. of
! 6
!
I do
II
IlExcept
south 133 feet and except
!
I
I
II
ileast
140 feet; that part of lot 6
I
I
I
II
lilying'south
of south line of Beech
I
I
I
II
list.
of
! 6
!
! do
il.
I I
I
11
!i
I
I
I
II
II
I
!
TOTAL
I!ID12 �%r � a iOO
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works. o
Dated
Commissioner of Finance.
Form B.B. 12 1M 3 -68 8 r
•
� v
AIN443
St. Paul, Minn. -Augur.t--1.9 -------------------- 19-57---
To The Honorable, The Council,
City of St. Paul, Minn.
Gentlemen: Z 7
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
-------------- Czrading-- -and.-- bl-a -ck -- topping,--- .9e!.er --- and -- --- - n-- Be- e_ch- _S1;r_eet-- - - - - -- • -
------- - - - - -' •-------------------------------- - - - - -- ------------------------ - - -St. A.ve.
from Brmngam St. =E. to_ Johnson Pa---r----------------------------------------- kway
------ - - - - -- ------------------------------------------ - - - - -. $ .
NAME
'LOT
BLOCK
ADDITION
i
The
East 110
ft. of that part of lot
lags
Sout
line of
euth eat
E. Minnehaha Ave. And We
Birmingham St.
of t3l
No. line
183 fee
ne a' and
of Beech St; except th
thereof.
OT'tl
6
`
Home
line
S. 110 fti
for the. Homeless
Binniqgham
of that part ef let
lying West of We
St. So.
3
line
of
of Beech
anel ofSout
St, except So. 183 ft.th
All
—ex-c7ept
of lot 6
the Eaut.
ome'for the Homeless
lie feet No. Beech
of
except
East 110
ft. So. of Beech St.
c-
Block
1 Lot
,8,9, 10,11,12 Wallbloms
Block
2 Lot
,2,3,4, Wallbloms additi
Block
I Lot
' Schoch and Althens Su
Block
2 Lot 2
Schock and Athens Sub.
"10
I
6M 6 -66 y /�
9
k
St. Paul, Minn ----------------------------------------- 19--------
To The Honorable, The Council,
Gentlemen City of St. Paul, Minn.
6-12)4
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
Grading - and__black-- topping fs ew-er an-d - -water--on--Beech-- -Stre -et - - - - -- • -- - - - - --
- -A-Ve+•
from ----- Birmingham --------------------------------------- St. Ave, to -------- ohn-&ors-- Pa. xkvraT -------------------------
----------------------------------------- ------------------- St. Ave.
5M 5 -6G p
NAME
'LOT
BLOCK
ADDITION
02
�
//
A:lstvcd
21U4
1
s
�.
.
P3
�—
s
f
00 y
C
y
jar
5M 5 -6G p
s
y, St. Paul, Minn. -A-u gust - 1} ----------- - - - - -- 195 - - - --
To The Honorable, The Council,
City of St. Paul, Minn. ! /)
j ( /
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
--------- - - - - -- ---------------------------------- - - - - -- - • ---------------------------------------------------------------------------------- - - - - -- • -- - - - - --
Grading and black toppings sewe--------------- and water on Beech St. ��7P
--------------------- - - - - -- -
from _ Birmingham ------------- - - - - -- ------------------- - - -St. -4=. to-- JQhnaQn --- ar -k - way------------------------- - - - - --
-------------------------------------------------------- - - --St. tie.
NAME
'LOT
BLOCK
ADDITION
, - a
t
R
I
6M 6 -66 2
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
July 23rd P 1958
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 188403 ,
approved July 17th 19 58 relative to grading Beech Street
from Birmingham Street to Johnson Parkway
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 159121.80 and the -total cost
(See Attached Letter)
thereof is $ and the nature and extent of said improvement
is as follows:
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
5. Said improvement is asked for upon petition of three
I rs of property, subject to assessment for said improvement.
f<AA �
dGea� /!j Commissioner of Public Works l
ASSISTANT CHIEF ENGINEER
HERBERT S. WEST
PUBLIC WORKS DESIGN ENGINEER
ARTHUR G. WELIN y
BRIDGE ENGINEER
MAURICE W. HEWETP
•
TRAFFIC ENGINEER
EUGENE V. AVERY
•
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WI.NKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator
ARTHUR W. TEWS, Chief Engineer
d8
July 23, 1958
PUBLIC WORKS MAINTENANCE ENGR.
RICHARD L. WHEELER
•
BUREAU OF SANITATION
JOHN M. COTTER. Supt.
BUREAU OF MUNICIPAL EGUIPYENT
ARTHUR H. KOCH
PRINCIPAL ACCOUNTANT
JOS. PAVLICES
Hon. Adrian P. Winkel
Commissioner of Public Works
City of St. Paul
Dear Sir:
1 transmit herewith preliminary estimate of cost for Grading Beech
Street from Birmingham Street to Johnson Parkway, under Preliminary Order
C. F. 188403, approved July 17, 1958.
Estimated Cost
Engineering
Inspection
Cost per front foot
Frontage
Approved for transmission to
the ission r Finance
Arian P. Winkel
Commissioner of Public Works
$15,121.80
625.00
284.25
6.05
2,500 ft.
Yours very truly,
Ar hur W. Tews
Chief Engineer
=�W
. s
i�vrrrr. #�1:
4
rri 71
CA
CLAZENCF-
ETNA
I�MING RAM.
ry
--5T.
5T
CP
71
RA-Z-F-LWOOD
En
rri
P
I