In the Matter of constructing a sanitary sewer in Rankin Street from Stewart Avenue
to 85 feet southerly of Benson Avenue; also constructing a storm sewer in Rankin
Street from Stewart Avenue to 90 feet southerly of Benson Avenue
S
x.
under Preliminary Order -------- 18857.6_ ----------------------- approved _:____A17us_t__1,__195$_
Intermediary Order ---------------------------------------------- - - - - -- approved ---------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is, construct a sanitary sewer in Rankin Street from
Stewart Avenue to 85 feet southerly of Benson Avenue; also construct a storm sewer
in Rankin Street from Stewart Avenue to 90 feet southerly of Benson Avenue
xr
13
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That ,the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit sam to the Council for
approval; that upon said approval, the proper city officials are hereby authorized d directed to pro-
ceed with the making of said improvement in accordance therewith.
SEP 30 1958
Adopted by the Council------------------------------------------------ - - - - -- '
�---------- - - - - -- -
.S E P 3 0 1958 city cierkk�_
Approved------------------------------------------ - - - - --
File 14183
Councilman
DeCOURCY.
Councilman
HOLLAND
Councilman
MORTINSONI
Councilman
PETERSON
Councilman
_�R- --
Councilman
WI;,
Mayor
D' ON
2.55 2M 2
r Tvtx,
- - - -- - -- ----------------- - - - - -- --------------------------------- , Mayor.
g
a '
ol
Ito 6v
e�z,4 '000,�
,yam
. ... .... .... ... .. . ....
le 9
I11 �S'll
a
/N, 64� mzflr
(A)
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
In the matter of constructing a sanitary sewer in Rankin Street from Stewart Avenue to 85 ft.
southerly of Benson Avenue, also constructing a storm sewer in Rankin Street from Stewart
Avenue to 90 ft. southerly of Benson Avenue,
189328
under Preliminary Order approved August 1, 1958
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - _ _ $ 27,119.84
The estimated assessment per foot for the above improvement is - - - - $ 32.67
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
II
DESCRIPTION
I LOT IBLOCKI
ADDITION II
LAND VALUATION BLDG.
II
NW2 of alley vac. adj. and Lots 1
I
I
I
II
11
thru
I 6
1 5
(Kentucky Terrace
II $325
IISE-21 of alley vac. adj. and Lots
I
I
I
II
ii9 and
110
15
I do
II 75
Lots 1 and
I :2
16
I do
75
IIS2 of vac. alley adj. & all of
Rockwood Ave. vac. adj. and fol:
I
I
I
II
ilLots 17 thru 24, southeasterly
I
I
I
II
11145 ft. of Lots 25, 263 27 and all
i1of Lots 28 thru
132
I 5
I Addition to Saint Paul
1,625
Form B. B. 10 1M 8 -58 8
CITY' OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C) Y
IIDESCRIPTION
I LOT IBLOCKI
ADDITION II
LANG VALUATION BLDG.
!_iLots
1 thru 1
141
121Palisade
Addition to Saint Paul
II $1;700
11
Lots 31 and 1
32
1 121
do
11 325
Lots 12 thru
116
! 151-
do
1! 400
!I
1 17
1 131
do
11 175
_II
(Except Rankin St.) That part of thl
I
I
!!
11
E 113 of the SE-11 of the SW;, lying
I
I
I
iiSlY
Of W. 7th St. and Nally of a linj
I
I
I!from
a point on the E line of said
I
I
I
!1tract,
where the same is intersectel
I
I
!!
!!by
the SE line of Rockwood Ave. to
!
!
!
II
!!a
point on the S line of said tract!
I
i1where
the same is intersected by thl
I
11
iisaid
SEly line of Rockwood Ave. par
I
Il
11of
Section 153 Township 28 North,
I
I
I
Il
kange 23,West
I
I
I
II 6,450
11
I
I
I
I!
II
I
I
I
II
II
I
I
I
II
II
I
I
I
II
1
I
TOTAL
I
II $11,150
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Dated , �� l9Sk 01-1
Commissioner of Finan .,
Form B.B. 12 1M 3 -58 8
•r,
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS p � d -3
REPORT TO COMMISSIONER OF FINANCE
August 12th
To the Commissioner of Finance of the City of Saint Paul:
19 58
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 188576
approved August 1st , 19 58 , relative to construct a sanitary
sewer in Rankin Street from Stewart Ave. to 85 ft. southerly of Benson Ave.;
also construct a storm sewer in Rankin Street from Stewart Ave. to 90 ft.
southerly of Benson Ave.
and having i'nvestigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 27,119.84 , and the total cost
(See Attached Lett9
r)
thereof is $ and the nature an extent o said improvement
is as follows:
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
5. Said improvement is asked for upon petition of three
or more owners of property, subject to assessment for said improvement.
12 F D
Commissioner of Public Works
Olt, i
ASSISTANT CHIEF ENGINEER
HERBERT ;3. WEST
•
PUBLIC WORKS DESIGN ENGINEER
ARTHUR G. W?=
y •
BRIDGE L.NGINEER
MAURICE W. HEWETT
•
TRAFFIC ENGINEER
EUGENE V. AVERY
CITY OF SAINT PAUL PUBLIC WORKS MAINTENANCE ENGR.
RICHARD L. WHEELER
Capital of Minnesota •
DEPARTMENT OF PUBLIC WORKS BUREAU OP SANITATION
JOHN M. COTTER, Supt.
ADRIAN P. WINKEL, Commissioner •
BUREAU OF MUNICIPAL EQUIPMENT
CLIFTON G. HOLMGREN, Deputy Commissioner ARTHUR H. KOCH
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator •
ARTHUR W. TEWS, Chief Engineer PRINCIPAL ACCOUNTANT
JOS. PAVLICEK
August 12, 1958
Hon. Adrian P. Winkel
Commissioner of Public Works
City of St. Paul,
Dear Sir:
1 transmit herewith preliminary estimate of cost
of a sanitary sewer in Rankin Street from Stewart Avenue
of Benson Avenue;; also construct a storm sewer in Rankin
Avenue to 90 feet southerly of Benson Avenue, under Pre]
188576, approved August 1, 1958.
Estimated Cost
Engineering & Inspection
Estimated Assessment
Cost per front foot
Frontage
Approved for transmission to
the mmissioner f Fi ance
d ian P. inkel
Commissioner of Public Works
i
for the construction
to 85 feet southerly
Street from Stewart
iminary Order� C. F.
•f'sr�<r�i Ge. • �r'�
$27,119.84
2,465.44
$27,119.84
32.67
830 ft.Ba��s
Yours very truly,
A thur W. Te s
Chief Engineer
Co �