Loading...
187206187"20 J COUNCIL FILE NO. y By - Council File No. 187206 — INTERMEDIARY ORDER P In the matter of regrading and pav- ip�rwd,ri��y y2�venueo, from Highland egne_witia new In the Matter of regrading and paving Fairview Avenue from highland Parkway to St. Clair Avenue with new concrete base and asphaltic concrete surfacing to a width of 40 feet and between Highland Parkway and Randolph Avenue constructing 8 feet wide parking lanes on both'sides adjacent to the new pavement with stabilized base and asphaltic concrete surfacing; grading and paving street, alley and driveway returns; constructing new curbs and sidewalks where necessary; reconstructing drainage facilities; constructing sewer, water and gas service connections from street mains to property lines where necessary; reconstructing the paving, curbing and sidewalks on the intersecting streets where not in conformity with said improvement; constructing conduits and appurtenances for future lighting and traffic control systems and doing all other work which is necessary and incidental to complete said improvement, under Preliminary Order 186353 approved February 27, 1958 The Council of the City of St. Paul having received the report of the Commissioner of Finance upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved and adopted, and the said improvement is hereby ordered to be proceeded with. -- 2. That "the nature of the improvement which the Council recommends is regrade and pave Fairview Avenue from Highland Parkway to St. Clair Avenue with new concrete base and asphaltic concrete surfacing to a width of 40 feet and between Highland Parkway and Randolph Avenue construct 8 feet wide parking lanes on both sides adjacent to the new pavement with stabilized base and asphaltic concrete surfacing; grade and pave street, alley and drive- way returns; construct new curbs and sidewalks where necessary; reconstruct drainage facilities; construct sewer, water and gas service connections from street mains to property lines where,'necessary; reconstruct the paving, curbing and sidewalks on the intersecting streets where not in conformity with said improvement; construct conduits and appurtenances for future lighting and traffic control systems and do all other work which is necessary and incidental to complete said improvement, with no alternatives, and that the estimated cost thereof is $ 21+20716.00 Resolved Further, That a public hearing be had on said improvement on the 27th day of yo•y , 19._,5-8 —, at the hour of 10 o'clock A. M., in the Council Chamber of the Court House and City Hall Building in the City of St. Paul. That the Commissioner of Finance give notice of said meeting to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. Adopted by the Counci C1 (i .�z d APR 211958 Approved, Clerk PUBLISHW 11_x_ sue' Mayor File 14059 Councilman DeCOURCY Councilman HOLLAND Councilman MORTiNSON Councilman PETERSON Councilman _]-KOSEN Councilman Mr. President DILLON