188942ti-
.E
In the Matter of
Overbrook; Blo
COUNCIL FILE NO. - - - -.-
h FINAL ORDERS
FINAL ORDER '! )uncil File No. 188942 —
grading and surfacing with bituminous material,the - alley in Block 6,
9, Berland Addition No. 2 and Block 11, Berland Addition No. 3,
from Hoyt Ave.' south to turn - around; also install a Catch -Basin in the turn - around
in Block 11, Berland Addition No. 3
under Preliminary Order - - - -- 188405 -------------------- - - - - -- approved --------------- ffu,Y-- 7-7, -- x-958--------------------------
IntermediaryOrder J ------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, I be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to grade and surface with bituminous material the
alley in Block 6,I Overbrook; Block 9, Berland Addition No. 2 and Block 11, Berland
Addition No. 3, from Hoyt.Ave. south to turn - around; also install a Catch -Basin in
t
the turn - around in Block 11, Berland Addition No. 3
i
L
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to preparetplans and specifications for said improvement, and submit same tAhe Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvveme tliirLgecordance therewith.
I 55 t 95
Adopted by the Council --------------------
- - - -- - - - - -- -- - - - - --
S t P 2 1958 City Clerk.
4 -
Approved-----------------------------------------------
File121161 I ----------- - - - - -- -- ----------------------------------------- - - - - -- ------- - - - - --
Councilman DeCOURCY Mayor.
�
Councilman 'HOLLAND
Councilman MORTINSON
Councilman PETERSON >
Councilman 1,ROSEN PUBLIS D — (o - 5
Councilman WINKEL -
Mayor + D{LLON
2.55 2M 2 i
• CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(A)
_88942 4
In the matter of Grade' and `surface with bituminous material the alley in Block 6, Overbrook;
Block 9., Berland Addition No. 2 and, Block 11, Berland Addition No. 3, from Hoyt Ave. south
to turn - around. Also install a catch basin in the turn- around in Block 11, Berland Addition'
No. 3,
B
A
under Preliminary Order approved July 171i 1958
To the Council of the City 01f St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $ 2A87• 3
The estimated assessment per foot for the above improvement is - - - - $ 3.90
The lots or parcels of,land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last "reported by the Assessor, are as follows:
i
IIDESCRIPTION
4
I LOT
IBLOCKI
ADDITION
I LAND VALUATION BLDG.
0
I ion
II
li
I 13
T
2�' an es'
II —�5,U0
it I
I
I II
a �+;!
1.9 5W
II I
I
I
I / II
II
I K
l o
I do
1a400
II?ct
to seiner easEm l
t nn
--
!I
South 6110 ft. �
I (
0
I do
II
I
I
I1
valliationsi
IIPlat**
I)
Lots 22 and
II
i
Form B. B. 10 1M 3 -68 8
f
{
(C)
" CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
IIDESCRIPTION
I
LOT IBLOCKI
ADDITION II
LAND VALUATION BLDG.
IILot
21t and South j of
125
16 I
Overbrook
II 9 375 9
IINorth
� of Lot 25 and tal of 126
16 I
do
II 375 6-M
IISouth
20 ft. of Lot 281and
all of 1
27
1 6 1
do
II 375 7-,.3,5o
IIExcept
South 20 ft.; It
28 and a1
29
1 6 I
do
II 151
I�
I I
I I
II
!►
I
I
I
I
II
II
If
I
I
I
II
II
I
I
I
II
II 1
I
I
I
II
.
II i
I
I
I
II
I
I
I
II
TOTAL
11ka got) Z 2 ! 700
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, {
and hereby submits Ithe foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Date r i
-f Commissioner of Finance.
Form B.B. 12 1M 3-58 8 {
t
To the
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
July 23rd l9 58
issioner of Finance of the City of Saint Paul:
The' Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 188405 ,
approved f July 17th 19 58 relative to grade and surface with
bituminous material the alley in Block 6, Overbrook; Block 9, Berland Addition
No. 2 and Block 11, Berland Addition No. 3, from Hoyt Ave. south to turn-
around. !Also install a catch basin in the turn- around in Block 11, Berland
Addition!No. 3
1
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2
thereof i
is as fol
The estimated cost thereof is $ 2.687.13 , and the total cost
(See Attached Letter)
s $ and the nature and extent of said improvement
lows:
3f A plan, profile or sketch of said improvement is hereto attached
and madela part hereof.
J.
5�. Said improvement is asked for upon petition of thre
i or Hers of property, subject to assessment for said improvement.
RECEIVE
L 25
D Commissioner of Public Works
OF + co PMML
RNA ��, ! /
.I.'
� y 1
St. Paul, Minn .........
To The Honorable, The Council,
City of St. Paul, Minn.
_ I v
Gzntlemen :
We, ithe undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
- - --- - - - - -- - -- ------ - - - - -- ------------------------------------------- ----- ----- -- - - -- • -- - - - - --
- - - - - -- -- - - - -- --- - - - - -- II - - - - -- - -- --------------------- �' St. Ave.
— f
1 fx om ........ - - - - - -- [41'14LIt� -- d -------------- e: to------------------------------- - - - - -- ------------------------------
---------------------- - - - - -- ----------------------------- - - -St. Ave.
N
l NAME
LOT
BLOCK
ADDITION
I
G
APR 26 a
DEPT,
OF PUBLIC W =
ii•N
sM 11_62 2
-�► S t
r
is
•
r
St. Paul, Minn.----- - - - - -- .... L7 ............. 19 -Y�0� G
To The Honorable, The Council,
t
City of St. Paul, Minn.
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
----------------- - - - - -- . -- -- - --
I 'O;IO'e;R ... - ----- /
-------------------------------------------------- - - - - -- - Str-•.Ave. to------------------------------------------------------------------
from i �,�
i
6M 6 -66
i
c
� .•'�v'.!'ldas.
ASSISTANT CHIEF ENGINEEIL
HERBERT S. WES'Tf
4
PUBLIC WORKS DESIGN,ENGINEER
ARTHUR G. WEI"
BRIDGE ENGINEER
MAURIC37u. W. HEWETT
f
TRAFFIC ENGINEER
EUGENE V. AVERY
Hon.Adrian P.
Commissioner
City of St. P
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WINKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator
ARTHUR W. TEWS, Chief Engineer
Winkel
f Public Works
July 23, 1958
e
T'
PUBLIC WORKS MAINTENANCE ENGR.
RICHARD L. WHEELER
BUREAU OF SANITATION
JOHN M. COTTER, Supt.
BUREAU OF MUNICIPAL EGUIF►IENT
ARTHUR H. KOCH
PRINCIPAL ACCOUNTANT
JOS. PAVLICES
Dear Sir: I
I transmit herewith preliminary estimate of cost for Grading and sur-
facing with bituminous material the alley in Block 6, Overbrook; Block 9,
Berland Addition No. 2 and Block 11, Berland Addition No. 3, from Hoyt Ave.
south to turn'-around.-
urn around. Also install a catch basin in the turn - around in
Block 11, Berland Addition No. 3, under Preliminary Order C. F. 188405,
approved July 17, 1958.
Estimated Cost $2,687.13
Engineering 190.02
Inspection 48.96
Cost per front foot 3.90
Frontage 690.47 ft.
Yours very truly,
Y
Arthur W. Taws
Chief Engineer
Approved for transmission to
the Issioper Finance
44/rian t. i n
Commissioner of Public Works
f
Mali-ON,
I
col
1Sj �/1/vb'716'
0 Ir I
V� 0 1
n I
' ♦ 1s: - ' -H1 /77no
I
y50
_ II
•N�'ldN
I,
POFA
r
r