Loading...
188046QJRIGINAL TO CITY CLERK PRESENTED BY COMMISSIONI CITY OF ST. OFFICE THE 1NCIL RE O TION- n _ Council File No. 188048 —By Milton Rosen–. - Whereas, The Board of Water Com- missioners, on June 10, 1958, duly Passed a resolution authorizing the hiring of the engineering services of The Pitometer Associates to conduct a waste water survey and main trunk line flow and loss of head survey pursuVet to a proposal of the said Pitometer Associates, Engineers, sub- mitted .to the said Board on February 28, 1958, a copy of which resolution and WHEREAS, the Board of Water Commissioners, on June 10, 1958, duly passed a resolution authorizing the hiring of the engineering - services of The Pitometer Associates to con- duct a waste water survey and main trunk line flow and loss of head survey survey pursuant tb-a proposal of the said Pitometer Associates, Engineers, submitted to the said Board on February 28, 1958, a copy of which resolution and proposal of The Pitometer Associates, Engineers, is attached hereto and made a part hereof; and WHEREAS, the Council concurs in the conclusion of the Board of Water Commissioners that the engineering survey and report to be conducted by the said Pitometer Associates, Engineers, is a type of work especially needed in the over- all operations of the said water system, Now, Therefore, be it RESOLVED, That the Council hereby concurs in the action of the Board of Water Commissioners in hiring The Pitometer Associates, Engineers, to carry out the technical work for the Board of Water Commissioners as set out in the letter of such firm dated February 28, 1958; and be it further- RESOLVED, That the Board of Water Commissioners is hereby authorized to pay for such services the sum of Seven Thousand, Five Hundred Dollars ($7,500.00) for the services of the engineers of said firm and the use of the said Pitometer, and, further, that the flow measurements and loss of head tests in th,e trunk mains to be carried on at there ular per diem of such firm in the amount of Ninety Dollars,\ ?$90.00) per day; and be it further RESOLVED, That in line with the proposal submitted by said engineering firm, the total cost of both projects shall not exceed the sum of Eleven Thousand Dollars ($11,000.00). COUNCILMEN Yeas Nays DeCourcy 'IT8i3M& -BferMnaen Rosen Winkel Mr. President, Dillon 5M 5 -5s 2 Adopted by the Council JUN 24 1958 19— JUN 24 1958 Approved 19— 44 Favor Q' Q -a- Mayor 0 Against PUBLIS 7 A 188046 DUPLICATE TO PRINTER \' CITY OF ST. PAUL COUNCIL NO. OFFICE OF THE CITY CLERK COUNCIL RESOLUTION — GENERAL FORM PRESENTED BY COMMISSIONER DATE WHEREAS, the Board of Water Commissioners, on June le, 1958, duly passed a resolution authorizing the hiring of the engineering services of The Pitometer Associates to con- duct a waste water survey and main trunk lime flow and loss of head survey survey pursuant to a proposal of the said Pitome,ter Associates, Engineers, submitted to the said Board on February 280 1958, a copy of which resolution and proposal of The Pitometer associates, Engineers, is attached hereto and made a part hereof .l and WHERBAS, the Council concurs in the conclusion of the Board of dater Commissioners that the engineering survey and report to be conducted by the said Pitometer Associates, Engineers, is a type of work especially needed in the over- all operations of the said water system, Now, Therefore,, be it RESOLVED, That the Council hereby concurs in the action of the Board of Water Commissioners in hiring The Pitometer Associates, Engineers,, to carry out the technical work for the Board of Mater Commissioners as set out in the letter of such firm dated February 28, 1938; and be it further RESOLVED, That the Board of Dater Commissioners is hereby authorized to pay for such services the sum of Seven Thousand, Five Hundred Dollars ($79300.00) for the services of the engineers of said firm and the use of the said Pitometer, and, further., that the flow measurements and loss of head tests in the trunk Mains to be carried on at the re ular per diem of such firm in the amount of Ninety Dollars ?$90.00) per day; and be it further RESOLVED, by said engineering not exceed the sum COUNCILMEN Yeas Nays DeCourcy I o" =n iwien. Peterson-- Rosen Winkel Mr. President, Dillon sM 5.58 2 That in line with the proposal submitted firm, the total cost of both projects shall of Eleven Thousand Dollars ($11,000,00). n Favor Against JUN 24 1958 Adopted by the Council 19— JUN 24 1958 Approved 19— Mayor . s . PRESENTED BY COMMISSIONER_..... *b -fs•;>_r'.:�;�_ 9r-0 c Adrian _P :....Wind DATE a.OA. -,x.958 .. .................... WHEREAS# THE DEPARTMENT 10 1935 ENPLOYED THE PITONETER ASSOCIATES# ENGINEERS# TO MADE A PARTIAL BASTE MATER SURVEY AND A FLOW SURVEY OF THE MATER DISTRIDVTION SYSTEM OF THE MATER DIEPARTNENT9 ANO WHEREAS# HANY CHANGES HAVE SEEN MADE IN THE DosTRIDVTION SYSTEM SINCE 1935 AND AN INSINEERING SURVEY AND REPORT ON THE FLOUT CONDITIONS OF THE PRESENT SVSTEN# PARTICULARLY AS TO THE LARGER MAINS WHION NAVE SEEN INSTALLES UNDER THE CURRENT IMPROVE — VENT PROSRAN# AS OF VALVE TO THE DEPARTMENT# NOW# THEREFORE# DE IT RESOLVED# THAT THE ENGINEERING SERVICES OF THE 'ITOMlTER ASSOCIATES BE ENGAGED TO CONDUCT A WASTE WATER SURVEY AND MAIN TRUNK LINE FLOW AND LOSS OF HEAD SURVEY AS PER THE ATTACHED PROPOSAL OF THE $AID PITONETER ASSOCIATES# ENGINEERS* Water Commissioners Yeas Nays Rm*u DeCOUrCT :Rsslc91 In favor ............. Opposed. 0 Adopted by the Board of Water Commissioners ----------------- ,dun,a.209 .------------------- - - - - -. 195..1.$ ................................................................ .... ...... E.SHAW POLE ►RESIDENT M_ ASCE M. ASME R 18 OUENEAU MOR LATIN AMERICA M. ASCE C.J. KNOENER DISTRICT MOR. ALBANY A M ABCE J. M SHANLEY PRINCIPAL ENGINEER M. ASCE W. D HUDSON PRINCIPAL ENGINEER A M.ASCE CYRUS R. BIRD VICE PJIESIDIRNT M.ASCE 'Wr A:1 H. E. BECKWITH EGISERT D. CASE' CHAIRMAN VICE PRESIDENT M. ASCE M. ASCE THE PITOMETER ASSOCIATES ENGINEERS NEW YORK CHICAGO PITTSBURGH ALBANY ATLANTA HOUSTON ST. CROIX, V. I. Yr. Leonard M.Thompson, General Superintendent, Water Department) City of St.paul, Minn. Dear iir.Thompson : WATER WASTE SURVEYS TRUNK MAIN SURVEYS WATER DISTRIBUTION STUDIES WATER MEASUREMENT & SPECIAL HYDRAULIC INVESTIGATIONS 80 CHURCH STREET TEL CORTLANDT 7 -8288 NSW YORK 7, N. Y. February 28, 1958. We have brought our proposal of June 3, 1957, up to date, and enclose it herewith. You will note that this proposal contemplates a Pitometer Water Waste Survey in pitometer Sections 4 and 12, and measurements of flow and loss of head tests in the trunk mains, as directed by you, up to a maximum of approximately 40 men days. If further work should be indicated, this could be arranged by extending the contract on the basis of $90.00 per man day. The two sections in which we propose to complete the Water Waste Survey are areas where our previous measurements indicated the existence of underground losses, and contain an estimated 120 miles of main, with a consumption of approximately 7 ngd. We trust that this matter will be given your favorable consideration in the near future so that if the proposed work is authorized the field work could be undertaken as soon as weather conditions permit in the spring. Yours very truly, THE pITOOUlM ASSOCIATES, INC. yLLIL By: rT _ If ' �y Chairman 1 ' PRC ?�1 f }K•d' M: wf C[ s M AGM[ R. 13. OUENEAU MOR. LATIN AMERICA M. ASCE C.J. KNOENER DISTRICT MOR ALBANY A M ASCE J. M. SHANLP.Y PRINCIPAL ENGINEER M. ASCE W. D. HUDSON PRINCIPAL ENOINEER A. M. ASCE cvRUu P ,;. Faf:: H. E. BECKWITH VICE PREQIDENT VICE PR[91D[NT "M. A[CE M. AsCE - THE PITOMETER ASSOCIATES ENGINEERS NEW YORK CHICAGO PITTSBURGH ALBANY ATLANTA HOUSTON ST. CROIX, V. I. Mr. Leonard N.Thompson, General Superintendent, Water Department, City of St.Paul, Minn. Dear Sir: EOBERT - *O. CASE M. ASC[ 1 WATER WASTE SURVEYS TRUNK MAIN SURVEYS WATER DISTRIBUTION STUDIES 1 WATER MEASUREMENT a SPECIAL HYDRAULIC INVESTIGATIONS BO CHURCH STREET TEL CORTLANDT 7 -8286 N Ew YORK 7, N. Y. February 28, 1858. We bog to submit the following proposal for a Water Waste Survey of Pitometer Sections 4 and 12 of the water distribution system, and for conducting flow measurements and loss of head tests in the trunk main system as directed. DETAILS OF WORK TO BE DONE: The term. "Pitometer Water Waste Survey" will include the following: 1. A division of these sections into districts, and a measurement of the flow into each district throughout the twenty - four hours. 2. Further investigation in all districts where excessive waste is indicated, for the purpose of locating all underground leaks of the mains and services large enough to be measured by the Pitometer. 3. A check on all large industrial consumers for the purpose of detecting the unauthorized use of unmetered water, through fire lines or otherwise, and a test, in place, of all meters 4" and larger in diameter by direct or indirect measurements with the Pitometer, wherever feasible. 4. Twenty -four hour flow measurements and loss of head I I tests in the trunk mains at points designated by the General Superintendent of the Mater Department. i 5. At the completion of the Survey a report of the work in detail will be submitted, accompanied by a map showing the boundaries of each district and the location of all gauging points, and charts showing the variation of flow into each district. B �t.Paul,?Linn. ` COST OF ENGINEERING SERVICES: ,,;,4- �[w"%'hyjy-ra;er,���d �`�� i-Y�t- ' �4'- ��r "i°�'��X''`�vpy��.�Y�°.��•a "t" '� S�`: �.�; iFi .J- rS.'ti -2- February 28, 1958. We will undertake the Water Waste Survey of Sections 4 and 12 for the sum of $71500.00 (Seventy -Five Hundred Dollars) for the services of our engineers and the use of the necessary Pitometer. The flow measurements and loss of head tests in the trunk mains will be made at our regular per diem of $90.00, but in no event will the total cost of both projects exceed $11,000.00 (Eleven Thousand Dollars). COOPERATION BY THE CITY: The City will furnish and set corporation cocks at the points designated by our engineers, supply competent labor for operating valves, construct and furnish shelter boxes for the protection of our instruments, and furnish transportation necessary for properly conducting the Survey. TEAMS OF PAYMENT: Payments will be made monthly, based on the percentage of the Water Waste Survey completed during the current month, as approved by your engineer, plus the number of men days spent on trunk main tests. Ten percent of our total monthly bill will be retained until the report has been submitted and'accepted. EDC : ep Respectfully submitted, THE PITOMETER ASSOCIATES INC. esident