188589COUNCIL FILE NO -----
By---- - - - - -- - - - r
Council File No. 188589 —
FINAL ORDER the matter of changing She grade
..s at�g e.11ry .,ir, F7•- �F.Zp�g^``i
In the Matter of changing the grade of the alley in Block 8, Holcombe's Add. from !
Dale St. to St. Albans St. to conform to the grade as shown on the profile on file,
in the Dept. of Public Works; also grade and surface with bituminous material the
alley in Block 8, Holcombe's Addition, from Dale St. to St. Albans St. to the
proposed change of grade
under Preliminary Order ----------- 187162-
-- - - - - -- approved - - - -- April_24-, - -195$
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to change the grade of the alley in Block 8,
Holcombe's Add. from Dale St. to St. Albans St. to conform to the grade as shown on
the profile on file in the Dept. of Public Works; also grade and surface with bituminou
material the alley in Block 8, Holcombe Is Addition, from Dale St: to St. Albans St. to
the proposed change of grade
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council --------------- AUG ---- 5__195 ___ ----------
--- - - - - -- ==
AUG 5 1958 City Clerk.
Appoved---------------------------------------- - - - - -- j
Counciiian�
Councilman
Councilman
Councilman U
Councilman
Councilman
Mayor
2 -55 2M 2
------------------------------
Mayor.
CITY OF-ST-PAUL
' DEPARTMENT OF FINANCE
' REPORT OF COMMISSIONER OF FINANCE
J ON PRELIMINARY ORDER
-
88,E
.
In
the matter of
i
changing the grade of the alley in Block 8, Holcombe Is Add. from Dale St.
1
to St. Albans St. to conform to the grade as shown on the profile on file in the
Dept. of Public Works. Also from Dale St. to St. Albans St. to the proposed change
1
Im
i
'i
of grade. 188589
'i
t
•
I under
Preliminary Order approved April 24, 1958
-To
I
the Council of the City of St. Paul:
,1
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $ 40 283.20
The estimated assessment per foot for the above improvement is - - - -
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation
of
each
lot or parcel as last reported by the Assessor, are as follows:
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION
I
LANDVALUATIOiBLDG.
t
II.i;
52-5 feet; lots
i
A.
I
I
L,-..ombele *ddi bioii bo
I M1
$3
II '
and
do
II
.. � 1
5
I 8
I do
$950 $2...50
ll'li
16
I 8
( do
$950 $2,
18
I 8
I do
II $950 $2,
II!Ii
h
9
8
d°
ll
Lot
and t 10 f-eet of
I I
I
o
p , ,
I FO
B. B. 10 1M 8 -58 8
IM
i
1
- CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
IIIa
kr: DESCRIPTION
I LOT IBLOCKI
ADDITION II
LANDVALUATIO
BLDG.
•I�!
- .!
I
I I
II
me
Paul I!
feet Lot
I
!
I II
r r
ef
�h
W,7VV voopf,
witnesBes
do
do
�
�
I - 117
I
I do ll
-ep-l- --* 9 feet of North
!!
I
I
I
n
$1,
)o
IT L IF LI
t "A and Want of
I
I
I
II --, ---
I
I
I
II S850 $341
III;
I
I
I
II
-
91
I
I Ao -
II 0 n9K AA - R iL
I!,1�
5114
do
4 t 22 and East 18 feat of Lot
21
CIO
41
I
I
I do II
19140 2'0 01
125
18
I do II
AiI
126
I 8
I do
8-9 --
-950 820 a
!�f1
27
8
dn
m - �tJI
1
I
TOTAL II
i
e
hereby the f his report ther-een ta. the Geuneil, together the
1
I.
"d submits oregoing as wM report made
Bated
-ate R
I
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
` ON PRELIMINARY ORDER
(C)
II'll
DESCRIPTION
LOT
BLOCK
ADDITION
II
ASSESSED
LAND VALUATIOrBLDG.
u'
I
I
I
II
000
jj:jjjavtsHeleembe's
Addition to
Saint
II�1
III
Paul
Ii
111
I
I
I
II •
.I
►,1
I
I
I
II
!L�1
�
I •I
I
� •I
►I��I
I
I
I �
II
II,II
I
I
I
II
�Li1
I
I
I
� �
•
�I
I
I
I
II
►I.�
1
I
I
I
11 . .
!
►,�
l
I
I
I
II
I!I!
I
I
TOTAL
II $27j325 1111
70
i
1
?�f
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Dated
Commissioner of Finance -TP
fFlI.. B.B. 12 1M 848 8
1
® +kl OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
� A
RJVE�0
APR 30 OF N REPORT TO COMMISSIONER OF FINANCE
DEE ".
OF
YNANCE co
April 29
To the Commissioner of Finance of the City of Saint Paul:
- /.X
0 144
19 58
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 487162 ,
approved April 24 19J-8—, relative to changing the grade of the
allev in Block 8. Holcombe's Add. from Dale St. to St. Albans St. to conform to
the grade as shown on the profile on file i.n the Dept. of Public Works. Also
grade and surface with bituminous material the alley in Block 8, Holcombe's Add.
from Dale St. to St. Albans St. to the proposed change of grade.
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 4.283.20 , and the total cost
Engineering $300.00 Inspection $78.10
thereof is $ and the nature and extent of said improvement
is as follows: Cost per front foot $3.57 Frontage 1200 ft.
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
0
5. Said improvement is asked for upon petition of three
or more owners of property, subject to assessment for said improvement. rzvp�l
c zl�'� %A04
Commissioner of Public Works
I , r
ASSISTANT CHIEF ENGINEER
HERBERT S. NZEST
• .d
PUBLIC WORKS DESIGN ENGINEER
ARTHUR G. WELIN
BRIDGE ENGINEER
MAURICE W. HEWE7T
•
TRAFFIC ENGINEER
EUGENE V. AVERY
•
CITY OF SAINT PAUL PUBLIC WORKS MAINTENANCE EN
4
RICHARD L. WHEELER
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS B "JOHNM COTTER, Supt.
ADRIAN P. WINKEL, Commissioner •
BUREAU OF MUNICIPAL EOUIPHE.
CLIFTON G. HOLMGREN, Deputy Commissioner ARTHUR H. HOCH
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator
•
ARTHUR W. TEWS, Chief Engineer
PRINCIPAL ACCOUNTANT
® JOS. FAVLICEK
April 29, 1958
Hon. Adrian P. Winkel
Commissioner of Public Works
City of St. Paul
Dear Sir:
I transmit herewith preliminary estimate of cost for changing the
grade of the alley in Block 8, Holcombe's Addition from Dale Street to
St. Albans Street to conform to the grade as shown on the profile on file
in the Department of Public Works. Also grade and surface with bituminous
material the alley in Block 8, Holcombe's Addition from Dale Street to
St. Albans Street to the proposed change of grade, under Preliminary
Order C. F. 187162, approved April 24, 1958.
Fig. ONsp/,
Estimated Cost
Engineering
$4,283.20
300.00
Inspection 78.10
Cost per front foot 3.573 7
Frontage 1200 ft.
Yours very truly,
AA hur W. Tews
Chief Engineer PT=O
Approved for transmission to
Zr e ommissioner f Finance
ian inke
Commissioner of Public Works
;• f
V •
_� �J • U L__1 I I
Ole ;-'aelop
S T.
'f
5T,
ST.
.S7
I.�
i.�
v
�J
M
0
1
c
.
o0
f
f
f
F /.sk
�
G�pv rro
'f
5T,
ST.
.S7
I.�
i.�
v
�J
M
0
1
c
5T,
ST.
.S7
I.�
i.�
v
�J
M
0
1
c
.
o0
t
f
• s�- .�«.✓s s7-
4 � a _ _ -- z ...E .: �, • �� �. • _.t -_„ ,�;,�
{ • R - " `s�.:,,r- �' ms's .,, -t._ : .F�. �' � � 3 .a � sY.-
.we'd