188587. - 188587
COUNCIL FILE N0_________________________
By------ - - - - -- -
Council File No. 188587 —
FINAL ORDER In it matter o grading and a alle-
ing with bituminous material the alle;,
in Block 3,.Chelsea Heights, from Idah,
.e „e.. sp ,T.i °- ^nn *PifT.4•te, ..�,..+.�..,ri,.-
I A
In the Matter of grading and surfacing with bituminous material the alley in Block 3,
Chelsea Heights, from Idaho Ave. to Larpentgur'•Ave.
under Preliminary Order ---------------- 187.455 ---------------- approved -------- - - - - -- ?du- - - ---------------------- - - - - --
IntermediaryOrder ------------------------- ---------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to grade and surface with bituminous material the
alley in Block 3, Chelsea Heights, from Idaho Ave. to Larpenteur ^Ave.
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council_________________ AUG
5 '1958
- -- -- - - - - -- - - - -- ----------------------_---
AUG 5 1958 City Clerk.
nn�
Approved------------------------------------------ - - - - --
------ - - - - --
Fi le 1416 COURCY.
Councilman
Councilman HOLLAND
Councilman MORTINSOW
Councilma
Councilman ROSEN
Councilman WINKEL (0
Mayor DiLLON
2.55 2M 2
-----------
Mayor.
CITY OF ST. PAUL
" DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(A)
In1lthe
matter of grade and surface with bituminous material the alley in Block 3, Chelsea
fights, from Idaho Ave. to Larpenter Ave.
x.8858'7
under
Preliminary Order approved May 14, 1958
To;
'the
Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $
The estimated assessment per foot for the above improvement is - - - - $ 2.93
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation
of
each
lot or parcel as last reported by the Assessor, are as follows:
III
I DESCRIPTION
I LOT IBLOCKI
ADDITION II
VALUATIONB
LAND
DG.
11 lbject
I
(Chelsea
to Widened Iarpenter Ave.•I
Heights
II jLgts
1
1
1
II
1, 2, and
3
3
II
I
14
131
do II
150
II I!
5
131
do
II 150
II l
1
16
1 3
1 do
150
17
13
I do
150
fJfllts
I
I
I
II
8 and North i of Lot,
do
1 of Lot 9 And all of
I
I
I 11
20
II 111
III1
Farm
B. B. 10 1M 8 -58 8
J
y i
'
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
' REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
I
DESCRIPTION
I LOT IBLOCKI
ADDITION II
LAND VALUATION
DG.
II #'West
1•
I I
I
II
!! I
►1 I
I
I do
II
II Iii
I 17
I
I do
II
19
I -1
I d
II 50-n- 9 RO
II
I 1
�3
I n
II 500
!II1
yj1K..()
II1I
�
I+
�
South
I
17.93 feet of Lot 2
11111
',outh
32.27 feet of Lot 24 and
I
I
I
II
11
41e�cept
South 17.93 feet;
123
1 3
I do
11 6?q 11 9001
ii 1181xcept 'I
„
South 32.27 feet; Lot 24
1
II Land
all of Lot
12
I
I do
II 600 3.6.50
II l►
I
1 261
3
1 do
II 500 8-9m
II I
!
1271
3
1 do
II 800 21,300
IIIII
128
13
do
II 850 q.100
ii f
I S� b ject to Widened Larpenter Ave. •
1
I
I
II
ii 11,1Jots
29 and
I 30
I
I rip
112.300
�tl
I
I
I
II
I
Il
i
�l l
I
I
I
ll
II
f
!
I
I
I
II
1
I TOTAL
11 611,$ 00
Form
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Date - r-Q-��
Commissioner of Fin ce. ZR
B.B. 12 1M 3-58 8
L
14
ovember o __________19_2.L._ St: Paul, Minn. - -_- __N
To The Honorable, The Council,
City of St. Paul, Minn.
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
Opening u. of_North end of alley between Larpentuer and Idaho (now dead end
/%,rR -onl
___- at _ La.rpentuer - -- -- running parallel__with and between Hamline and Heltbg St. Ave.
from= ---------- `----------- - - - - -- -------------------------------- - - -St. Ave. to--------- - - - - -- -------------------------------------------------
------------------------------------------------------------ St. Ave.
ry11
lei
s s�
$o •td
6M 6 -6G p r
DEPT, OF' PUUIIG WORKS
LOT
BLOCK
ADDITION
r�
!' �� �'I WIN; .�1
r
A `
MEAN",
I. wrm 0,
I Man in M
�11 ALL/ / /-ils�:/ 711
/ � I
I VU _, it
®
i
ry11
lei
s s�
$o •td
6M 6 -6G p r
DEPT, OF' PUUIIG WORKS
,I*
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
May 20th
To the Commissioner of Finance of the City of Saint Paul:
19 58
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 187450
approved May l4th ' 19—L, , relative to grade and surfac¢
with bituminous material the alley in Block 3, Chelsea Heights, from Idaho
Avenue to Larpenteur Avenue
and having investigated the matters and things referred to therein, hereby
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 3,424.42 , and the total cost
Engineering $292.00 Inspection $61.42
thereof is $ and the nature and extent of said improvement
is as follows: Cost per front foot $2.93 Frontage 1168 ft.
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
5. Said improvement is asked for upon petition of three
re owners of property, subject to assessment for said improvement.
r
'! Commissioner of Public Works
r
MsurrANT CmEw EN"`"®` CITY OF SAINT PAUL PUBLIC WORKS MAINTENANCE ENGR
HERBERT
S. WEST RICHARD L. WHEEELER
Capital of Minnesota
PUBLIC WORKS DESIGN
VVE ENGINEER DEPARTMENT OF PUBLIC WORKS Bu JOHN COTTER, Supt.
ARTHUR G. WELIN
ADRIAN P. WINKEL, Commissioner •
BRIDGE ENGINEER CLIFTON G. HOLMGREN, Deputy Commissioner BUREAU OF MUNNIICIPAOL EQUIPMENT
MAURICE W. SEWETT
GEORGE M. SHEPARD, Sfreet & Highway Engineering Coordinator
ARTHUR W. TEWS, Chief Engineer
TRAFFIC ENGINEER PRINCIPAL ACCOUNTANT
EUGENE V. AVERY O JOB. PAVLICEK
+s
a •
May 20, 1958
Hon. Adrian P. Winkel
Commissioner of Public Works
City of St. Paul
Dear Sir:
transmit herewith preliminary estimate of cost for grading and
surfacing with bituminous material the alley in Block 3, Chelsea Heights,
from Idaho Avenue to Larpenteur Avenue, under Preliminary Order C. F.
187450, approved May 14, 1958.
Estimated Cost
Engineering
Inspection
Cost per front foot
Frontage
Approved for transmission to
the ommissioner Finance
Adrian Winke
Commissioner of Public Works
$3,424.42
292.00
61.42 to�l
2.93 2 , = tB4 /,
1 168 ft. �o� � 538.
/l a-s, 77/,
Yours very truly,
Arthur W. Taws
Chief Engineer
ea��
IF
f
Y
C4
IMPIZ IAIC
/-/&/Fo,y
z SEA
Cj
Afl-',eeZ4 Z
r
J�
--j I
I-F-A-1 W--o- -oz,7
N. Crrl'gq.5 5;/- --
i
�I
W-Ap - -
IF C)
tj
a
�L FJ .1 '11
..I
- VIA
Z,CX11Yd7 7-01Y— - —A v
41
OFFICE OF THE COMMISSIONER OF FINANCE
St. Paul •2, Minn.
.... Bray . 23 .............19 .. F13
You are hereby notified that the Council of the City of St. Paul will .consider
the matter of application of Ep aup Lgther4p Church fqr
petMit to erect a private parking lot on south side of
Idaho Ave. between Lexington and pxfprd
and that a public hearing will be held in the Council Chambers of the Court
House and (pity HIM, Bif1ding of June 5 , 19 58, in the City of
St. Paul, at 80:00 0 lock A.M. 1
-4210.@ File 14097 Commissioner of Finance.
The City Charter requires this Notice be sent from the Department of Finance