187680ADDITIONS
At intersection of Geranium Ave. and Kennard St.
Remove existing catch basin and plug catch basin
lead $20.00
Construct 2 new 4A Catch Basins 090.00 180.00
Construct 30 lin. ft. of 1211 V.C..pipe
connection to sewer @ 3.75 112.50
Excavation below 12' depth - 5 cu.yd. ® 3.50 17.50
2 connections to 3611 R.C. Pipe sewer ®25.00 50.00
Total net additions _ - $3ZO: QO
WHEREAS, The total Net Addition is $380.00, now
therefore, be it
RESOLVED, That the City of St. Paul, through its
City Council approve the foregoing addition, made in
accordance with the'specifications in the sum of $380.00,
said amount to be added to the lump sum consideration
named in-th6 contract, known as Comptroller's Contract
L- 5928 -A, for the making of the above improvement. f
The Commissioner of Public Works has agreed with
the above named contractor that the sum of $p380.00 is
the correct amount to be added to the above contract.
(The above addition is to be financed by assessments to property owners
COUNCILMEN Adopted by the Counci 195 —
Yeas Nays MAY 9 1958
DeCourcy
n Approved 195 -
c
n Tn Favor
eP r�i sow Mayor
Rosen Against
Mr. President, Mon 8
5M 6.56 *;00,2 PUBLISHED �
fi
.18"1'680
80
Original to CIty Clerk
CITY OF ST. PAUL
COUNCIL
OFFICE OF THE CITY CLERK
Council File No. 187686 —By Adrian P.
COUNCIL zz Ozffr".TP L FORM
Winkel —
Whereas, Additions which might
prove be nec essary 4he tn.»: i e-
PRESENTED BY Adrian P Winkel
a r.
ment descriheP as ±he gra ;e a• •' ^ e:
,b in H- ' S : r n c •
COMMISSIONE •
Gcr ,� ` _ rn _, . • < t .c{ss3i ,3u -1f,
9VO7 fr.,
WHEREAS, Additions which might prove to
be necessary
in the improvement described as the grade and
sewer job
in Herbert St. from Maryland to Geranium, Comptroller's
Contract L- 5928 -A, St. Paul Dredging Co., Contractor, ,
have been provided for in the specifications,
and
WHEREAS, It has been found necessary to
make the
following additions:
ADDITIONS
At intersection of Geranium Ave. and Kennard St.
Remove existing catch basin and plug catch basin
lead $20.00
Construct 2 new 4A Catch Basins 090.00 180.00
Construct 30 lin. ft. of 1211 V.C..pipe
connection to sewer @ 3.75 112.50
Excavation below 12' depth - 5 cu.yd. ® 3.50 17.50
2 connections to 3611 R.C. Pipe sewer ®25.00 50.00
Total net additions _ - $3ZO: QO
WHEREAS, The total Net Addition is $380.00, now
therefore, be it
RESOLVED, That the City of St. Paul, through its
City Council approve the foregoing addition, made in
accordance with the'specifications in the sum of $380.00,
said amount to be added to the lump sum consideration
named in-th6 contract, known as Comptroller's Contract
L- 5928 -A, for the making of the above improvement. f
The Commissioner of Public Works has agreed with
the above named contractor that the sum of $p380.00 is
the correct amount to be added to the above contract.
(The above addition is to be financed by assessments to property owners
COUNCILMEN Adopted by the Counci 195 —
Yeas Nays MAY 9 1958
DeCourcy
n Approved 195 -
c
n Tn Favor
eP r�i sow Mayor
Rosen Against
Mr. President, Mon 8
5M 6.56 *;00,2 PUBLISHED �
fi
Duplicate to Printer 187689
- CITY OF ST. PAUL COUNCIL �� NO. iiilll
OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
COMM SSIIONER Adrian P. Winkel DAB May 28, 1958
WHEREAS, Additions which might prove to be necessary
in the improvement described as the grade and sewer job
in Herbert St, from Maryland to Geranium, Comptroller's
Contract L- 5928 -A, St. Paul Dredging Co., Contractor,
have been provided for in the specifications, and
WHEREAS, It has been found necessary to make the
following additions;
ADDITIONS
At intersectkon of Geranium Ave. and Kennard St.
Remove existing catch basin and plug catch basin
lead $20.00
Construct 2 new 4A Catch Basins G90.00 180.00
Construct 30 lin. ft. of 12" V.C. pipe
connection to sewer ® 3.75 112.50
Excavation below 12' depth - 5 cu.yd. 0 3.50 17.50
2 connections to 36" R.C. Pipe sewer @25.00 50.00
Total net addifibns
$380.00
WHEREAS, The total Net Addition is 0380.00, now
therefore, be it
RESOLVED, That the City of St. Paul, through its
City Council approve the foregoing addition, made in
accordance with the specifications in the sum of X380.00,
said amount to be added to the lump sum consideration
named in the contract, known as Comptroller's Contract
L- 5928 -A, for the making of the above improvement'.
Tho Commissioner of Public Works has agreed with
the above named contractor that the sum of 0380.00 is
the correct amount to be added to the above contract.
(The above addition is to be financed by assessments to property owners;
COUNCILMEN Adopted by the Councilp��_ 95—
Yeas Nays MAX 2 9 19��
DeCourcy
i
e erso JI
Rosen 171���
Mr. President, Dillon
am o -ae 'Z
n Favor
OAgainst
Approved 195—
Mayor