Resolution Ratifying Assessment
In the matter of the assessment of benefits, costs and expenses for
constructing a public sewer from Pedersen St. to a point that is approximately 453 ft.
west of the east City Limits in a 30 ft. wide easement across Tract "B" Registered Land
Survey No. 91, the center line of said easement being described as follows: Comm ncing
at the point of intersection of a line 1275.0 ft. south of and parallel to the north
line of the SE* of Section 35, Township 29`North Range 22 West, with a line 33 ft.
west of and parallel to the east line of said SEA; thence west and parallel to said
north line a distance of 309.6 ft.; thence deflect-to the right 140001, a distance of
549.5 ft.; thence deflect to the left 12000' a distance of 300 ft.; thence deflect to
the right 9000' a distance of 773.5- ►-'ft., said point being the intersection of this
last described line with the east pr6perty line of Pedersen St. and there terminating,
under Preliminary Order... - .181517......., Intermediary Order ....... 18I9$3........ Final Order...... 1823ak ....... ,
approved.- - - - - -. APr: LL 16 ------------------ 19..57..
r
A public hearing having been had upon the assessment for the above improvement, and said assessment
having been further considered by the Council, and having been considered finally satisfactory, be it therefore
RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same
is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation.
BE IT TiBER RESOLVED, That the said assessment be and it is hereby determined to be payable
in........... __ -- .....'..equal installments.
MAY
28 ''1%g
Adoptedby the Council- --------------------------------------- --•-------- ---- - --- - ------------------------- 19.........
MAY 2 3 1958
Approved---------- - - -- - ----- - ----------------------- 19........
Form B. B. Is
i
File 13677
r
r
-r
City Clerk.
--- - - - - -- --- - - - - -- ----------- - - - - -- -�X/ �M ..-- Mayor.
t
7
a
r
• ' � : ,PUBLTSFIEIS �v�.� - ��
# Y
I
CITY OF ST. PAUL �2 g
1 OFFICE OF THE COMMISSIONER OF FINANCE
Report of Completion of. Assessment
� d
i
April 29 19_58
In the matter of the assessment of benefits, costs and expenses for
constructing a public sewer from Pedersen St. to a point that is approximately 453 ft.
west of the'eatt City Limits in a 30 ft. wide easement across Tract "B" Registered
Land Survey,No. 91, the center line of said easement being described as follows: Com-
mencing at the point of intersection of a line 1275.0 ft. south of and parallel to the
north line of the SEu of Section 35, Township 29 North, Range 22 West, with a line
33 ft. westlof and parallel to the east line of said SE,'; thence west and parallel to
said north line a distance of 309.6 ft.; thence deflect to the right 140001, a distance
of 549.5 ft!; thence deflect to the left 12°00'a distance of 300 ft.; thence deflect
to the right 9000' a distance of 773.5 -eft., said point being the intersection of this
last described line with the east property line of Pedersen St. and there terminating,
under Preliminary Order 1 ,91.517 approved February 15., 1957
i
Intermediary Order' 181983 , approved March 19, 1957
Final Order- 182334 , approved April 16, 1957
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports to the Council the following as a statement of the ex-
penditures necessarily incurred for and in connection with the making of the above improvement, viz:
I
Cost of construction . ............................... $ 180884,94
1
Engineering ....... ............................... $ 1,467.89
Inspection fees ............ ........................$ 377.63
Postal cards ......... ..............................$ 0.12
Publications .00
b blications ........ ..............................$ —
Court costs for confirmation ........................$ 0.30
Total expenditures .............................$ 20,731.88
Said Commissioner further reports that he has assessed and levied the total amount as above ascer-
tained, to -wit: the slum of $ 200731-88 upon each and every lot, part or parcel of land deemed
benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferral d thereon; that the said assessment has been completed, and that hereto attached,
identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as
completed by him, Ind which is herewith submitted to the Council for such action thereon as may be
considered proper.
2M 12 -62, g
%%2�• .��1,0- yt.Q.L�a! �%%_ � ,emu
Commissioner of Fana e`er