193778. 193778
• COUNCI FJLE _ NO:_ _------
Council File No- 193778— I
�y In the Matter of grading Germaine
--------- St: from Third St. to Fifth St., under l--
Prelinj'"'ary Order 193191 approved
July 21959.
A p, lilic hearing having been had
LDE
upon , t>7e above improvement upon'
- due - notice, and the Council having
In the Matter of grading Germain St. from Third St. to Fifth St.,
under Preliminary Order ------ 193191 pp July 21, 1959
app. -- -------------------------------------------------
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons,'objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that t , n o l -
ent to �
AN orders 't I`- "I uva mattrr sTme are her,,E�zt cani:A( led, annuile�
ad resecindod'and a;l proceedings In said imttar be diuGWI Med,
nd the Council hereby orders said improvement to b made.
FURTHER, That the Commissioner o blic Works be and is hereby ins eted and
directed to prepare p nd specifications for said improve and submit same to the Cou it for
approval; that upon said app val, the proper city officials are here uthorized and directed to ro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council______J__S E P 1 1959
S E P 11959
Approved---- -
603 '
File
Councilman
DeCOURCY
Councilman
HOLLAND
Councilman
" MORTINSON
Councilman
PETERSON
Councilman
ROSEN
Councilman
WINKEL
Mayor
ERLLON
2.55 2M 2 04!W
---------------- - - - - --
City Clerk.
r.
•
C�� Wi&,u
16
1, J:
CITY OF ST. PAUL
DEPARTMENT OF FINANCE 4 "
REPORT OF COMMISSIONER OF FINANCE
1 ON PRELIMINARY ORDER
(A)
In the matter of grading Germain Street from Third Street to Fifth Street
19 445
under Preliminary Order approved July 21, 1959
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $-13, 286.85
The estimated assessment per foot for the above improvement is - - - - ' $ 6.68
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
Form B. B. 10 1M 8 -68 '@sl08
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION
I LAND VALUATION BLDG.
II
1 151
1 Diett's Subdivision of Lot
11 $3800
itWest j of Lot 17 and all of Lot
1 161
1 10 of Lee's Suburban Homes
1 525 6450
II
1
1
1
it
Lots 1 throukh
1 141
1
1 Heinemanng McConville and 11
800
!' Lote l through
1 141
2
1 Stier% ►s Subdivision of Lots
900
11
1 1
1 IP
2, 121 13 of Lee fs Suburban
100
Except South 10 -fti Lot
1 141
3
1 Homes 11
100
IINorth of vacated alley adjoining
1
I
1 it
Iland West 8 ft. of Lot 14 and all J
151
6
I do
� 125 3750
11
Form B. B. 10 1M 8 -68 '@sl08
t CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
1 ON PRELIMINARY ORDER
(C)
IIDESCRIPTION
I
LOT I
BLOCKI
ADDITION II
�NOVALUAT ASSESSED
I)
Subject, to street; the South j Of I
I
I
II
IIvacated
alley adjoining and West I
Iii"
I
Stierle�s Subdaiaion of Iat�11
II
; of Lot 17 and all of I
161
a I
, 12, M off' Zee Is Suburban
I KO
II
I
I
I
Homes
II
1
721
11
Fred Kabnen Addition
II18
1
11
Spiealer is Addition
hc;o
II
I
I
I
II
II
I
I
I
ll
TOTAL
I $4j775 $27.0550
The Commissioner of Financo- further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing-as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Date �' ode
Commissioner of Finance.
s
Form B.B. 12 IM 3-68 8
s
Y •
• .. St. Paul, Minn ----------------------------------------- 19 --------
To The Honorable, The Council,
City of St. Paul, Minn.
Gentlemen: r- .
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
Third. St.
RMAIN, betty en Fnma= and 5th
----- - - - - -- • ---------------------------------------------------------------------------------- - - - - -- • -- - - - - --
-------------------------------------------------- - - - - -- • ------- = ------------------------------------------------------------------------------- St. Ave.
from--------------------------------------------------------------- - - -St. Ave. to ---------------------------------------------------------- - - - - -- - -_ _ -
--------------------------------------------------------- - - -St. Ave.
11 /d^i
"i
0
0
ti
6M 6 -66 aOGW 2
rim-,
W, R." I MIR =�
L`/ -1L.7 "I '/—
Y/ '
MM
/
I�.�
i
6M 6 -66 aOGW 2
/ V, oa
OFFI'CE OF THE COMMISSIONER OF PUBLIC WORKS
1
REPORT TO COMMISSIONER OF FINANCE
r .
July 24th P 19 59
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 193191
approved July 21 19—.L9 ,relative to grading Germain Street
from Third Street to Fifth Street
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 13,286.85 , and the total cost
(See Letter Attached)
thereof is $ and the nature and extent of said improvement
is as follows:
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
5. Said improvement is asked for upon petition of three
rF'Tr of property, subject to assessment for said improvement.
ADRIAN . V t KEL
ssion of u io VE0 C omm sioner ' 1959 QV CE
GEORGE M. SHEPA'RD
Street +& Highway Engineering Coordinator
w
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WINKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
234 City Hall & Court House
July 24, 1959
Hon. Adrian P. Winkel
Commissioner of Public Works
City of Saint Paul
Dear Sir:
•
ARTHUR W. TEWS
Chief Engineer
I transmit herewith preliminary estimate of cost for grading,
Germain Street from Third Street to Fifth Street, under Preliminary Order
C. F. 193191, approved July 21, 1959.
Total Estimated Cost $13,286.85
Engineering 966.32
Inspection 241.58
Property Assessment 8,857.90
City's Share of Cost (31 E -1) 4,428.95
Cost per front foot to be assessed 6.68
(2/3 estimated total cost
Frontage 1327 ft.
Yours very trul ,
4hA,t-ur W. Tews
Chief Engineer
Approved for transmission to
the Commissioner of Finance
Adrian P Winkel
Commissioner of Pu rk s
In"
b�
O
c,�
•
� uu u� �J�IiU�
KENNARD 5-r.
LANDZAU
C-)—r.
co
HAZ
F-LWOO
M
D
rn
ST
rn
0
Z
--4
0
c
rN
p
G FP-
KENNARD 5-r.
LANDZAU
C-)—r.
Tn
0 C)
04 CP
(D
CD
r ii
4
WA rrE P-1
Ay
co
Tn
0 C)
04 CP
(D
CD
r ii
4
WA rrE P-1
Ay