192837192837
' COUNCIL_F1LE --Nn._ -
Council F4 a No. 192837— i
By° In " tqj tt6l, of grading and surfac-
ing with lilluminuos material the alley+
in Block 4, Hazel Park Division No. 8,
FINAL ORDER Tfrom Ruth St. to Luella St.; also con - ^�
str ''- �' .f� '+ iL�thel alley from
In the Matter of grading and surfacing with bituminous material ethe alley in
Block 4, Hazel Park Division No. 8, from Ruth St. to Luella St.; also constructing
a sewer in the alley from 40 ft. west of the west line of Ruth St. to the existing
sewer in Ruth St.
under Preliminary Order ---------- 9.1?±2Q ---------------------- approved --------- Mar -ch__19t__ 1959------------------------------
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said Citk i to grade and surface with bituminous material the
alley in Block 4, Hazel Park Division o. , from Ruth St. to Luella St.; also construct
a sewer in the alley from 40 ft. west of the west line of Ruth St. to the existing sewer
in Ruth St.
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
Approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith. -7
Adopted by the Council --------- jUN_ 23_1a5'
JUN 23 1959
Approved------------------------------------------ - - - - --
File 14429
Councilman DeCOURCY
Councilman _ReK.*tt5-,
Councilman MORTINSON
Councilman PETERSON
Councilman ROSEN
Councilman WINKEL
Mayor DILLON
2.55 2M 2 OW
CJ
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE)
ON PRELIMINARY ORDER
(A)
Qd)
In the matter of Grading and surfacing with bituminous material the alley in Block 4, Hanel
Park Div. No: 8 from Ruth St. to Luella St. ALSO CONSTRUCT A SEWER in the alley from 40 feet
1
west of the west line of Ruth St. to the existing sewer in Ruth St.,
under Preliminary Order approved March .19, 1959
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $3,848.90
The estimated assessment per foot for the above improvement is - - - - $ 3.29
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
IIDESCRIPTION I LOT ISLOCKI ADDITION II LAND VALUATION BLDG.
Form B. B. 10 1M 3 -58 8
s
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
y REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
II
DESCRIPTION I
LOT IBLOCKI
ADDITION
ASSESSED
VALUATION
I LAND BLDG.
Lots 11 and" 112
I
41
Hazel Park, Division No. 8,
Il 8 700 S 59750
Lot 13 and except West 20 ft.; 1
1-4 1
41
St, Paul, Minn.
II 525 4,650
11 Lot 15 and West 20 ft. of 1
14
41
do
11 525 40650
11
116
41
do
Il 75
II 1
17 1
41
do
11 75
!I 1
18
1 41
do
75
.I. 1
19 1
41
do
75
II
1 20
1 41
do
75
!�
1 22.
1 41
do
Il 75
�I
1221
41
do
111 75
11
1 23
1 41
do
75
1 24
1. 41
do
11 75
11
1 25
1 41
do
II 75
II
1 26
1 41
do
11 75
11
1 27
1 41
do
11 75
II.
1 28
1 41
do
11 75
1
1 29
1 41
do
75
11
130141
do
75
II
I
I
11
11
I
TOTAL
11 $6437-5 8534100
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by -the Commissioner of Public Works.
Dated'%
Commissioner of Finance. �.
Form B.B. 12 1M 3-68 8
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
d
1.
REPORT TO COMMISSIONER OF FINANCE
March 25th
To the Commissioner of Finance of the City of Saint Paul:
/ �/ �401 7
, 19 59
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 191420
approved
March 19th
, 19-5-9, relative to grading and surfacing
with bituminous material the alley in Block 4, Hazel Park Div. No. 8 from
Ruth St. to Luella St. Also construct a sewer in the alley from 40 feet
west of the west line of Ruth St. to the existing sewer in Ruth St.
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 39848.90 , and the total cost
(See Letter Attached)
thereof is $ and the nature and extent of said improvement
is as follows:
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof. ,
4.
v 5. Said improvement is asked for upon petition of three
�4 r owners o 1 r f property, ro subject to assessment for said improvement.
Y � subj J
AftiR 26 EO
9
O Com i ss iron`�i`ur f 1'
•To The Honorable, The Council,
City of St. Paul, Minn.
F0
A
0 14A 6 -
14
•
St. Paul, Minn 2-? --220'
-----------------
19-116-d�
GeniKemen:
We, the undersigned property owner's, hereby petition your Ho orable Body to cause
the following improvement to be made:
y owners, inr,,, h e rb y 4
.... . .....
.......... ----------- - ------ -- -- ---- --
------- . - - - --
from------------------------------------------------------------------ St. Ave. to ------------------------------------------------------------------
--------------------------------------------------------- - - -St. Ave.
NAME
LOT
BLOCK
ADDITION
VAN
6M 6-56 -01M02
. - AYI-
•ASSISTANT CHIEF ENGINEER CITY .OF SAINT PAUL
HERBERT S. WEST
Capital of Minnesota
PUBLIC ARTHUR DEIGN Fl10IliEE11 DEPARTMENT OF PUBLIC WORKS
ARTHUR G. WELIN
s
• ADRIAN P. WINKEL, Commissioner
BRIDGE ENGINEER
MAURICE wr_ HEV&= CLIFTON G. HOLMGREN, Deputy Commissioner
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator
.s
TRAPPIC ENGINEER ARTHUR W. TEWS, Chief Engineer
EUGENE V. AVERY
0 0
March 25, 1959
Hon. Adrian P. Winkel
Commissioner of Public Works
City of St. Paul
Dear Sir:
PUBLIC WORKS MAINTENANCE ENGR.
RICHARD L. WHEELER
BUREAU OF SANITATION
JOHN M. COTTER. Supt.
BUREAU OF MUNICIPAL EQUIPMENT
ARTHUR H. KOCH
PRINCIPAL ACCOUNTANT
JOS. PAVIaCEK
I transmit herewith preliminary estimate of cost for the grading
and surfacing with bituminous material the alley in Block 4, Hazel Park Div.
No. 8 from Ruth Street to Luella Street. Also construct a sewer in the
alley from 40 feet west of the west line of Ruth Street to the existing
sewer in Ruth Street, under Preliminary Order C. F. 191420, approved
March 19, 1959.
Estimated Cost
Engineering
Inspection
Cost per front foot
Frontage
Approved for transmission to
the Commissioner of Finance
A rian Winkel
Commissioner of Pu lic ores
$3,848.90
279.92
69.98
3.29
1170 ft.
Yours very truly,
Arthur W. Tews
Chief Engineer
Rtc?IVEO
MAC1959
r OP
f
'OEM
i'.
^r
I • •
I
YVH l-['E BEAR AvE.
ti 2 p =
Y D
y O r" 2 R1
v rri
i VA DYKE ST.
N
O
1 � i
A Z E L S T. o
$ rn
1
1 '
L -------- JL---
L U LL N 7
i
.4�
s�, I
1 �
O L'
d
Imo. +;. - ~� - � - - '; ,r�; 4• � ✓�'N ,' ` T .. ,. � *�