Loading...
192837192837 ' COUNCIL_F1LE --Nn._ - Council F4 a No. 192837— i By° In " tqj tt6l, of grading and surfac- ing with lilluminuos material the alley+ in Block 4, Hazel Park Division No. 8, FINAL ORDER Tfrom Ruth St. to Luella St.; also con - ^� str ''- �' .f� '+ iL�thel alley from In the Matter of grading and surfacing with bituminous material ethe alley in Block 4, Hazel Park Division No. 8, from Ruth St. to Luella St.; also constructing a sewer in the alley from 40 ft. west of the west line of Ruth St. to the existing sewer in Ruth St. under Preliminary Order ---------- 9.1?±2Q ---------------------- approved --------- Mar -ch__19t__ 1959------------------------------ IntermediaryOrder ---------------------------------------------- - - - - -- approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said Citk i to grade and surface with bituminous material the alley in Block 4, Hazel Park Division o. , from Ruth St. to Luella St.; also construct a sewer in the alley from 40 ft. west of the west line of Ruth St. to the existing sewer in Ruth St. and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for Approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. -7 Adopted by the Council --------- jUN_ 23_1a5' JUN 23 1959 Approved------------------------------------------ - - - - -- File 14429 Councilman DeCOURCY Councilman _ReK.*tt5-, Councilman MORTINSON Councilman PETERSON Councilman ROSEN Councilman WINKEL Mayor DILLON 2.55 2M 2 OW CJ CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE) ON PRELIMINARY ORDER (A) Qd) In the matter of Grading and surfacing with bituminous material the alley in Block 4, Hanel Park Div. No: 8 from Ruth St. to Luella St. ALSO CONSTRUCT A SEWER in the alley from 40 feet 1 west of the west line of Ruth St. to the existing sewer in Ruth St., under Preliminary Order approved March .19, 1959 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated cost of the above improvement is - - - - - - $3,848.90 The estimated assessment per foot for the above improvement is - - - - $ 3.29 The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: IIDESCRIPTION I LOT ISLOCKI ADDITION II LAND VALUATION BLDG. Form B. B. 10 1M 3 -58 8 s CITY OF ST. PAUL DEPARTMENT OF FINANCE y REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (C) II DESCRIPTION I LOT IBLOCKI ADDITION ASSESSED VALUATION I LAND BLDG. Lots 11 and" 112 I 41 Hazel Park, Division No. 8, Il 8 700 S 59750 Lot 13 and except West 20 ft.; 1 1-4 1 41 St, Paul, Minn. II 525 4,650 11 Lot 15 and West 20 ft. of 1 14 41 do 11 525 40650 11 116 41 do Il 75 II 1 17 1 41 do 11 75 !I 1 18 1 41 do 75 .I. 1 19 1 41 do 75 II 1 20 1 41 do 75 !� 1 22. 1 41 do Il 75 �I 1221 41 do 111 75 11 1 23 1 41 do 75 1 24 1. 41 do 11 75 11 1 25 1 41 do II 75 II 1 26 1 41 do 11 75 11 1 27 1 41 do 11 75 II. 1 28 1 41 do 11 75 1 1 29 1 41 do 75 11 130141 do 75 II I I 11 11 I TOTAL 11 $6437-5 8534100 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by -the Commissioner of Public Works. Dated'% Commissioner of Finance. �. Form B.B. 12 1M 3-68 8 OFFICE OF THE COMMISSIONER OF PUBLIC WORKS d 1. REPORT TO COMMISSIONER OF FINANCE March 25th To the Commissioner of Finance of the City of Saint Paul: / �/ �401 7 , 19 59 The Commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 191420 approved March 19th , 19-5-9, relative to grading and surfacing with bituminous material the alley in Block 4, Hazel Park Div. No. 8 from Ruth St. to Luella St. Also construct a sewer in the alley from 40 feet west of the west line of Ruth St. to the existing sewer in Ruth St. and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. 2. The estimated cost thereof is $ 39848.90 , and the total cost (See Letter Attached) thereof is $ and the nature and extent of said improvement is as follows: 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. , 4. v 5. Said improvement is asked for upon petition of three �4 r owners o 1 r f property, ro subject to assessment for said improvement. Y � subj J AftiR 26 EO 9 O Com i ss iron`�i`ur f 1' •To The Honorable, The Council, City of St. Paul, Minn. F0 A 0 14A 6 - 14 • St. Paul, Minn 2-? --220' ----------------- 19-116-d� GeniKemen: We, the undersigned property owner's, hereby petition your Ho orable Body to cause the following improvement to be made: y owners, inr,,, h e rb y 4 .... . ..... .......... ----------- - ------ -- -- ---- -- ------- . - - - -- from------------------------------------------------------------------ St. Ave. to ------------------------------------------------------------------ --------------------------------------------------------- - - -St. Ave. NAME LOT BLOCK ADDITION VAN 6M 6-56 -01M02 . - AYI- •ASSISTANT CHIEF ENGINEER CITY .OF SAINT PAUL HERBERT S. WEST Capital of Minnesota PUBLIC ARTHUR DEIGN Fl10IliEE11 DEPARTMENT OF PUBLIC WORKS ARTHUR G. WELIN s • ADRIAN P. WINKEL, Commissioner BRIDGE ENGINEER MAURICE wr_ HEV&= CLIFTON G. HOLMGREN, Deputy Commissioner GEORGE M. SHEPARD, Street & Highway Engineering Coordinator .s TRAPPIC ENGINEER ARTHUR W. TEWS, Chief Engineer EUGENE V. AVERY 0 0 March 25, 1959 Hon. Adrian P. Winkel Commissioner of Public Works City of St. Paul Dear Sir: PUBLIC WORKS MAINTENANCE ENGR. RICHARD L. WHEELER BUREAU OF SANITATION JOHN M. COTTER. Supt. BUREAU OF MUNICIPAL EQUIPMENT ARTHUR H. KOCH PRINCIPAL ACCOUNTANT JOS. PAVIaCEK I transmit herewith preliminary estimate of cost for the grading and surfacing with bituminous material the alley in Block 4, Hazel Park Div. No. 8 from Ruth Street to Luella Street. Also construct a sewer in the alley from 40 feet west of the west line of Ruth Street to the existing sewer in Ruth Street, under Preliminary Order C. F. 191420, approved March 19, 1959. Estimated Cost Engineering Inspection Cost per front foot Frontage Approved for transmission to the Commissioner of Finance A rian Winkel Commissioner of Pu lic ores $3,848.90 279.92 69.98 3.29 1170 ft. Yours very truly, Arthur W. Tews Chief Engineer Rtc?IVEO MAC1959 r OP f 'OEM i'. ^r I • • I YVH l-['E BEAR AvE. ti 2 p = Y D y O r" 2 R1 v rri i VA DYKE ST. N O 1 � i A Z E L S T. o $ rn 1 1 ' L -------- JL--- L U LL N 7 i .4� s�, I 1 � O L' d Imo. +;. - ~� - � - - '; ,r�; 4• � ✓�'N ,' ` T .. ,. � *�