Loading...
192836— V � 192836 COUNCIL FILE N0_________________________ By---------- - - - - -- I FINAL ORDERS FINAL ORDER` ' Council File No.' 192836.s —y � In'the Matter of the reconstruction of the:.ilidewalk on both sides of Central Ave. from Grotto St. to St. Albans St. - under Preliminary Order ------------ 191521 -------------------- approved ------ - - - - -- larch- -267-- 1959---------------------- - - - - -- IntermediaryOrder ---------------------------------------------- - - - - -- approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED; By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is to reconstruct the sidewalk on both sides of Central Ave. from Grotto St. to St. Albans St., except where good and sufficient sidewalks now exist and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. Adopted by the Council _____ ----- ______ Approved ------------ ) -N 24-1959 File S6085 • - -- Councilman DeCOURCY - Councilman � R N Councilman IN PETERSON Councilman Councilman ROSEN Councilman WINKEL Mayor DILLON L� ------ —__________________________y ----------------- City Clerk. ----------------------------------------------------- Mayor. e I 2.55 2M 2 , CITY OF ST. PAUL » DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE 199 3 ON PRELIMINARY ORDER 6 (A) In the matter of Th' reconstruction of the sidewalk on both sides of Central Ave. from Grotto St:. to St. Albans St.s 1499 �7(93 under Preliminary Order approved March 26, 1959 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated cost of the above improvement is - - - - - - $0.50 Deer sq. ft. f 4" Mono. Cone. wal The estimated assessment per foot for the above improvement is - - - - $Extra work at air cost. The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: Form B. B. 10 1M 8 -58 8 +. r DESCRIPTION I LOT I BLOCKI ADDITION I LAND VALUATIONBLDG.' North 41.61 ft. of Lots 1 and 1 2 1 12 1 Butterfield Syndicate Addition II 600 3 3.800 II 1 31 12 I 1 I1 625 2.600 I II 1 41 12 1 do 11 675 3.900 II 1 51 12 1 do 11 675 2J00 1 II 1 61 12 1 do 675 32000 II 1 71 12 1 do 675 1,600 1 81 12 1 do 11 675 4 400 I �I 91 12 1 do 11 675 2,0501 11 1 10112 1 do 675 11 1.1.E 12 1 do 675 3,90% Form B. B. 10 1M 8 -58 8 +. r • • CITY OF ST. PAUL L � DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER B DESCRIPTION LOT BLOCK ADDITION VALUATION Land Buildi',g 12 12 Butterfield Syndicate Addition $1 675 _2x700, _ 13 12 No. 1 _ - X625 14 12 _ do ( ;1,400 113,100; ' - - _ - - - - ---- -- 15 -12 - - - - - do- - _ j , The west 11.6 ft. of the north - 25.6 ft. of Lot 2 and all of _ 1 Rearrangement of the South 4 1350 t 1, 50, i Except the west .11.6 ft._of, north _ _ of Block 9,. Butterfield { t 25.6 ft.; - - 2 Syndicate Addition No. 1, i -250 700. tl _. 3 Ramsey county, Minn, j 275 ± ± 9,00; - - - _ - -4 - - - do - � ; I X275 ; , } - - - -- _ 5 - do e 1275 : 900 = - 6 - - do 275 7. do 275 i j j 900; - 8 - - do i 2T5 i i r 900_ - _ 9 - do - - 275 ; 5W 10 do --4 275 00, 3 _ _ ],1 _ _ do _ -- 275 900. 12 do - i 275 ; 1000 I 13 do+ _ 275 I 900 - - - - - - — - - -- 14 -- - - do — - - I �- 275 , I + 700> 1 � - - - - - - - -- - - - - - 15 - - - - -_ _ - do -- - 1 !275 t 700. - - - -- - - _ - - - - 16 - -- - - do � , _ � � - 275 - -- - 17- - do- - - - t X275 5 00, 18— - do - - - : - -1275 ? - - 19 - do -275 j �19 .�00 .._ - 20 do. t -2 75 900 0 i 900 FORM B.8.11 TOTAL ! , i w CITY OF ST. PAUL • DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (C) IIDESCRIPTION I LOT IBLOCKI ADDITION II LAND VALUATIONBLOt;.1 I� 1 221 lRearrangement of the South j of 11: 275 $ 800 I II 1 23 1 Block 9, Butterfield Syndicate 11 275 goo i _ 11 1 24 (Addition No. 1, Ramsey County, 11 275 900 I 11 1251 IMinn. II 275 800 II 1261 1 do II 275 8001 II 1 271 1 do 275 800 I , 11 1 281 1 do 275 9001 II291 1 do 275 9001 II 301 1 do 11 275 120001 . �I 1.31 I I' do I! 275 1,000 I I 11 Subject to party Wall agreement; 1 32 1 1 .. do 275 900 d 1 II do 1 331 1 do 11 275 9001 I! 1341 1 do 11 275 8001 II 1351 do 11 275 8001 11 1361 1 do 11 275, 120001. II 1371 1 do 11 325 192001 II I I Il 1 TOTAL 319.600 $109.2001 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Date !O�= Form B.B. 12 1M 5 -58 °�8 Central Grotto ,to =St. Albans - b9th shies OFFICE OF THE COMMISSIONER OF PUBLIC WORKS REPORT TO COMMISSIONER OF FINANCE April 2 19-52- To the Commissioner of Finance of the City of Saint Paul: The Commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 191521 approved March 25th. , l9 59 , relative to the reconstruction of the sidewalk on both sides of Central Ave. from Grotto St. to St. Albans St, i and having investigated the matters and things referred to therein, hereby reports: i 1. Said improvement is % necessary and (or) desirable. sq* ft. for mono. conc. walk 411 2. The estimated cost thereof is $0.50 per/ and the total cost thick, thereof is $ and the nature and extent of said improvement is as follows: 1 i Extra work(Excay., fill, conc, rem d,, root cutting, drive crossinas.etc.)at extra cost. 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. f 4. Initiated by the Comm. of Public Works 5. Said improvement is asked for upon petition of three '� I O m a�rners of property, subject to assessment for said improvement. Commissioner of Public Works Y( OF 1 �. .