Loading...
191253COUNCIL FILE N0_________________________ By-------------- Council File No. 191253— FINAL ORDER g the matter of grading and East- anti with bituminous material the e East - anti s.x —`1vv _iP_Uigck. �,,Lindemann's , In the Matter of grading and surfacing with bituminous material the East - and -West alley in Block 3, Lindemann's Sub. of Lots 9 and 10, Hyde Park Addition, and Block 1, American Building Company Plat 3, from Oxford St. to the North -and. -South alley; also constructing a storm water sewer in the alley from the existing sewer in Oxford St. to a point 52.6 ft. west of Oxford St. under Preliminary Order ------- 19D3b1 ------------------------ approved ------- December - 19,___95$__ IntermediaryOrder ---------------------------------------------- - - - - -- approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is to grade and surface with bituminous material the East- and -West alley in Block 3, Lindemann's Sub. of Lots 9 and 10, Hyde Park Addition, and Block 1, American Building Company Plat 3, from Oxford St. to the North - and -South alley; also constructing a storm water sewer in the alley from the existing sewer in Oxford St. to a point 52.6 ft. west of Oxford St. and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. Adopted by the Council_________________MAR 10195,9 __________ MAR 10 Approved-------------------------------- - - - - -- File 14333 Councilman Councilman DeCOURCY Councilman w-_H i Councilman Councilman Councilman ROSEN ;ay9 � N Mr. Vice President (P temp) 2.55 2M 2 016W Acting Vd ----------------- ;y Clerk. --------------- Mayor. N -a CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER . :_ A (A) 190964 In the matter of Grading and surfacing with bituminous . material the East and West alley in Block 3, Lindemann's Sub. of Lots 9 and 10, Hyde Park Addition, and Block 1, American ` Building Company Plat 3, from Oxford St. to the North and South alley. Also construct a storm water sewer in the alley from the existing sewer in Oxford St. to a point 52.6 ft. west of Oxford St., under Preliminary Order approved December 19, 1958 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated cost of the above improvement is - - - - - _ s4,007-15 The estimated assessment per foot for the above improvement is - - - - $ 5.69 The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: IIDESCRIPTION I LOT IBLOCKI ADDITION II LAND VALUATION BLDG. I1 I 1 I American Building Company II $150 II I 21 , I Plat 3 II 50 II 18 I 1 I do II 150 II I 9 I 1 I do II 150 Except west 26.5 feet; Lot 2 and IIall of I 11 3 ILindemann's Subdivision of 975 !I West 26.5 feet of Lot 2 and except) I Lots 9 and 10 of Hyde Park II IIwest 14 feet; I 3 I 1 (Addition to the City of St PaJ 8 IIWest 14 feet of Lot 3 and except I I it west 1.5 feet; I I I do 8 II Form B. B. 10 1M 8 -58 '®08 CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (C) IIDESCRIPTION I LOT I BLOCKI ADDITION II LAND BLDG. !" West 1.5 feet of Lot 4 and except ! I 1 11 11 west 25 feet; Lot 6 and all of 1 51 3 ILindemannts Subdivision of 11 $800 IIWest 25 feet of Lot 6 and except 1 I ILots 9 and 10 of Hyde Park II IIwest 12.5 feet; 1 71 3 lAddition to the City of St. Paul 725 II West 12.5 feet of Lot 7 and all of! 81 3 1 do II 675 West 12.5 feet of Lot 10 and all 1 91 3 1 do 875 ! Except west 12.5 feet; Lot 10 and I I I 11 west 25 feet of 1 11 ! 3 ! do 875 !I Except west 25 feet; Lot 11 and I ! ! 11 IIexcept easterly 7 feet; i 121 3 1 do !! 725 II Easterly 7 ft. of Lot 12, all of I i I !I Lot 13 and westerly 14 ft. of 1 141 3 ! do !! 1,025 !! Except west 14 feet; Lot 14 and I I I II II west 26 feet of 1 151 3 1 do II• 875 II Except west 26.5 feet; Lot 15 and I I I II !! all od 1 161 3 1 do !! 975 II I I I 11 III � ! TOTAL 11 $-102875 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made r to him in reference to said matter by the Commissioner of Public Works. Date /0-1 Commissioner of Finance. �o� B.B. iz IM M8 s 1 ��-- • St. Paul, Minn. - - - - -- -- --------------- 19 - - -- - - To The Honorable, The Council, City of St. Paul, Minn. Gentlemen: We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: ------- _the. T -A]. leer _.bQunded.by_Centr_a1-Qxford:: Fuller- Lexington. St. Ave. from--------------------------------------------------------------- - - -St. Ave. to------------------------------------------------------------------ ------------------------------------------------------------ St. Ave. ` • , G • 6M 6 -66 a� 2 LOT BLOCK ADDITION i r r z FS R, wMir MXE49mt. 1� • , ..� 1 A �� I �� I i• ►.1 . tl W-4,12 W. I • � V 6M 6 -66 a� 2 ASSISTANT CHIEF ENGINEER HERI3ERT S. WEST PUBLIC WORKS DESIGN ENGINEER ARTHUR G. WELIN r- BRIDGE ENGINEER MAURICE W. HEWLrr • TRAFFIC ENOINEE1t EUGENE V. AVERY CITY OF SAINT PAUL Capital of Minnesota DEPARTMENT OF PUBLIC WORKS ADRIAN P. WINKEL, Commissioner CLIFTON G. HOLMGREN, Deputy Commissioner GEORGE M. SHEPARD, Street & Highway Engineering Coordinator ARTHUR W. TEWS, Chief Engineer _@ December 23, 1958 Hon. Adrian P. Winkel Commissioner of Public Works City of St. Paul Dear Sir: PUBLIC WORKS MAINTENANCE ENGR. RICHARD L. WHEELER BUREAU OF SANITATION JOHN M. COTTER, Supt. • BUREAU OF MUNICIPAL EQUIPM[NT ARTHUR H. KOCH • PRINCIPAL ACCOUNTANT JOS. PAVLICES I transmit herewith preliminary estimate of cost for grading and surfacing with bituminous material the East and West alley in Block 3, Linde - mann's Sub of Lots 9 and 10, H &yde Park Addition, and Block 1, American Building Company Plat 3, from Oxford Street to the North and South alley. Also construct a storm water sewer in the alley from the existing sewer in Oxford Street to a point 52.6 feet west of Oxford Street, under Preliminary Order C. F. 190361, approved December 19, 1958. Estimated Cost Engineering Inspection Cost per front foot Frontage Approved for transmission to the ommission Fi ante t Brian P. Winkel Commissioner of Public Works �ndrite e�%r�7; $4,007.15 190.00 74.85 x.60 -ft-,- Yours very truly, A thur W. Tews Chief Engineer OFFICE OF THE COMMISSIONER OF PUBLIC WORKS .� 3 3 REPORT TO COMMISSIONER OF FINANCE December 23 , 19 58 To the Commissioner of Finance of the City of Saint Paul: The Commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 190361 approved December 19th , 19.!8 , relative to grade and surface with bituminous material the East & West alley in Blk. 3, Lindemann's Sub,of Lots 9 b 10 Hydid Park Add., and Blk. 1, American Building Co. Plat 3, from Oxford St. to the North and South alley. Also construct a storm water sewer in'the alley from the existing sewer in Oxford St. to a point 52.6 ft. west of Oxford Street and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. 2. The estimated cost thereof is $ 4,007.15 , and the total cost Engineering $190.00 Inspection $74.85 thereof is $ and the nature and extent of said improvement Cost per front ft. $5.28 Frontage 760 ft. is as follows: 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 4. 5. Said improvement is asked for upon petition of three or more owner f property, subject to assessment for said improvement. C r-/ - - -- Z444'.: . 1IWP411,1 o° 12 Ec 8() 1 r' D Eb Commissioner of Public Works .sue :'��"�S& a LE.ni" GToN PARKWAY NORTH -a — - 0- D m c c z 0 < .4 P p m I ➢ ➢ a Cn Z r -I Z { `N 0 XFO RD ST. r_\ A u� o f1 �.0 G HA-r5W o 2T r-A S -T. N N N W M IL--FO N 3-T. A A D L a I ILI I YIGTOR1A �l � 4