FINAL ORDER g the matter of grading and East-
anti with bituminous material the e East -
anti s.x —`1vv _iP_Uigck. �,,Lindemann's ,
In the Matter of grading and surfacing with bituminous material the East - and -West
alley in Block 3, Lindemann's Sub. of Lots 9 and 10, Hyde Park Addition, and
Block 1, American Building Company Plat 3, from Oxford St. to the North -and. -South
alley; also constructing a storm water sewer in the alley from the existing sewer
in Oxford St. to a point 52.6 ft. west of Oxford St.
under Preliminary Order ------- 19D3b1 ------------------------ approved ------- December - 19,___95$__
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to grade and surface with bituminous material the
East- and -West alley in Block 3, Lindemann's Sub. of Lots 9 and 10, Hyde Park Addition,
and Block 1, American Building Company Plat 3, from Oxford St. to the North - and -South
alley; also constructing a storm water sewer in the alley from the existing sewer
in Oxford St. to a point 52.6 ft. west of Oxford St.
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council_________________MAR 10195,9 __________
MAR 10
Approved-------------------------------- - - - - --
File 14333
Councilman
Councilman DeCOURCY
Councilman w-_H i
Councilman
Councilman
Councilman ROSEN
;ay9 � N
Mr. Vice President (P temp)
2.55 2M 2 016W
Acting
Vd
-----------------
;y Clerk.
---------------
Mayor.
N
-a CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
. :_ A
(A) 190964
In the matter of Grading and surfacing with bituminous . material the East and West alley in
Block 3, Lindemann's Sub. of Lots 9 and 10, Hyde Park Addition, and Block 1, American `
Building Company Plat 3, from Oxford St. to the North and South alley. Also construct a
storm water sewer in the alley from the existing sewer in Oxford St. to a point 52.6 ft.
west of Oxford St.,
under Preliminary Order approved December 19, 1958
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - _ s4,007-15
The estimated assessment per foot for the above improvement is - - - - $ 5.69
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION II
LAND VALUATION BLDG.
I1
I 1
I American Building Company
II $150
II
I 21
,
I Plat 3
II 50
II
18
I 1
I do II
150
II
I 9
I 1
I do II
150
Except west 26.5 feet; Lot 2 and
IIall
of
I 11
3
ILindemann's Subdivision of
975
!I
West 26.5 feet of Lot 2 and except)
I
Lots 9 and 10 of Hyde Park II
IIwest
14 feet;
I 3
I 1
(Addition to the City of St PaJ
8
IIWest
14 feet of Lot 3 and except I
I
it
west 1.5 feet;
I
I
I do
8
II
Form B. B. 10 1M 8 -58 '®08
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
IIDESCRIPTION
I LOT I
BLOCKI
ADDITION II
LAND BLDG.
!"
West 1.5 feet of Lot 4 and except
!
I
1
11
11
west 25 feet; Lot 6 and all of
1 51
3
ILindemannts Subdivision of
11 $800
IIWest
25 feet of Lot 6 and except
1
I
ILots 9 and 10 of Hyde Park
II
IIwest
12.5 feet;
1 71
3
lAddition to the City of St. Paul
725
II
West 12.5 feet of Lot 7 and all of!
81
3
1 do
II 675
West 12.5 feet of Lot 10 and all
1 91
3
1 do
875
! Except west 12.5 feet; Lot 10 and
I
I
I
11
west 25 feet of
1 11
! 3
! do
875
!I
Except west 25 feet; Lot 11 and
I
!
!
11
IIexcept
easterly 7 feet;
i 121
3
1 do
!! 725
II
Easterly 7 ft. of Lot 12, all of
I
i
I
!I
Lot 13 and westerly 14 ft. of
1 141
3
! do
!! 1,025
!!
Except west 14 feet; Lot 14 and
I
I
I
II
II
west 26 feet of
1 151
3
1 do
II• 875
II
Except west 26.5 feet; Lot 15 and
I
I
I
II
!!
all od
1 161
3
1 do
!! 975
II
I
I
I
11
III
�
!
TOTAL
11 $-102875
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
r
to him in reference to said matter by the Commissioner of Public Works.
Date /0-1
Commissioner of Finance.
�o� B.B. iz IM M8 s
1 ��--
• St. Paul, Minn. - - - - -- -- --------------- 19 - - -- - -
To The Honorable, The Council,
City of St. Paul, Minn.
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
------- _the. T -A]. leer _.bQunded.by_Centr_a1-Qxford:: Fuller- Lexington.
St. Ave.
from--------------------------------------------------------------- - - -St. Ave. to------------------------------------------------------------------
------------------------------------------------------------ St. Ave. `
• ,
G
•
6M 6 -66 a� 2
LOT
BLOCK
ADDITION
i
r
r
z FS
R, wMir MXE49mt.
1� • , ..� 1 A �� I ��
I i•
►.1 .
tl W-4,12
W.
I
• � V
6M 6 -66 a� 2
ASSISTANT CHIEF ENGINEER
HERI3ERT S. WEST
PUBLIC WORKS DESIGN ENGINEER
ARTHUR G. WELIN
r-
BRIDGE ENGINEER
MAURICE W. HEWLrr
•
TRAFFIC ENOINEE1t
EUGENE V. AVERY
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WINKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
GEORGE M. SHEPARD, Street & Highway Engineering Coordinator
ARTHUR W. TEWS, Chief Engineer
_@
December 23, 1958
Hon. Adrian P. Winkel
Commissioner of Public Works
City of St. Paul
Dear Sir:
PUBLIC WORKS MAINTENANCE ENGR.
RICHARD L. WHEELER
BUREAU OF SANITATION
JOHN M. COTTER, Supt.
•
BUREAU OF MUNICIPAL EQUIPM[NT
ARTHUR H. KOCH
•
PRINCIPAL ACCOUNTANT
JOS. PAVLICES
I transmit herewith preliminary estimate of cost for grading and
surfacing with bituminous material the East and West alley in Block 3, Linde -
mann's Sub of Lots 9 and 10, H &yde Park Addition, and Block 1, American
Building Company Plat 3, from Oxford Street to the North and South alley.
Also construct a storm water sewer in the alley from the existing sewer in
Oxford Street to a point 52.6 feet west of Oxford Street, under Preliminary
Order C. F. 190361, approved December 19, 1958.
Estimated Cost
Engineering
Inspection
Cost per front foot
Frontage
Approved for transmission to
the ommission Fi ante
t
Brian P. Winkel
Commissioner of Public Works
�ndrite e�%r�7;
$4,007.15
190.00
74.85
x.60 -ft-,-
Yours very truly,
A thur W. Tews
Chief Engineer
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS .� 3 3
REPORT TO COMMISSIONER OF FINANCE
December 23 , 19 58
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 190361
approved
December 19th
, 19.!8 , relative to grade and surface with
bituminous material the East & West alley in Blk. 3, Lindemann's Sub,of Lots 9 b 10
Hydid Park Add., and Blk. 1, American Building Co. Plat 3, from Oxford St. to the
North and South alley. Also construct a storm water sewer in'the alley from the
existing sewer in Oxford St. to a point 52.6 ft. west of Oxford Street
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ 4,007.15 , and the total cost
Engineering $190.00 Inspection $74.85
thereof is $ and the nature and extent of said improvement
Cost per front ft. $5.28 Frontage 760 ft.
is as follows:
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
5. Said improvement is asked for upon petition of three
or more owner f property, subject to assessment for said improvement.
C r-/ - - -- Z444'.: . 1IWP411,1
o° 12
Ec 8() 1 r'
D Eb Commissioner of Public Works
.sue
:'��"�S&
a
LE.ni" GToN PARKWAY NORTH
-a — - 0- D
m c c z
0 <
.4 P p m
I ➢ ➢ a
Cn
Z r -I Z
{
`N
0 XFO RD ST.
r_\
A
u�
o f1
�.0
G HA-r5W o 2T r-A S -T.
N
N
N
W
M IL--FO N 3-T.
A A
D
L a
I ILI I
YIGTOR1A
�l � 4