09-1027City of St. Paul
RESOLUTION RATIFYING ASSESSMENT
couNC�. ��.E No. Oq -/Da�
J f / +/"��� 4
_ _ _ B�/_ �'(.c�_�/ ��_____— L��_— _
�
0
File No. 19068
Assessment No. 095105
Voting Wazd 7
Green Sheet No. 3� `]3 I i
In the Matter of improving the azea referred to as SIXTH 5TREET from Maria Street to Sinnen
Street, by constructing new bituminous surface streets with concrete curb and gutter, concrete driveway
aprons and outwalks, boulevards landscaped with sod and trees, and a new lantern style lighting system
and doing all other necessary work to complete said project.
Preliminary Order: 08-1303 approved 11/26/08
Final Order: 08-1391 approved 12/17/08
WHEREAS, A public hearing having been had upon the assessment for the above improvement, and
said assessment having been further considered by the Council, and hauing been considered finally
satisfactory; now, therefore be it
RESOLVED, That the said assessment be and the same is hereby in all respects ratified.
T2ESOLVED FURTHER, That the said assessment be and it is hereby determined to be payable in
twen equal installments.
Yeas Nays Absent
Bostrom N
Carter �
Harris „�
Helgen ,,�
Lan /
Stark ✓
Thune ✓
�
Adopted by the Council: Date: �!!���Lf
Certified Passed by the Council Secretary
BS' �i o � a
Mayor
City of St. Paul
REPORT OF COMPLETION OF ASSESSMENT
COUNCIL FILE NO. �� 1 D�'�I
BY -
File No. 19068
Assessment No. 095105
Votmg Wazd
Green Sheet No. 3�`� �� �
In the Matter of improving the azea referred to as 5IXTH STREET from Maria Street to Sinnen
Street, by constructing new bituminous surface streets with concrete curb and gutter, concrete driveway
aprons and outwalks, boulevards landscaped with sod and trees, and a new lantern style lighting system
and doing a11 other necessaty work to complete said project.
Preliminary Order: 08-1303 approved 11/26/08
Final Order: 08-1391 approved 12/27/08
To the Council of the City of Saint Pau1:
The V aluation and Assessment Engineer hereby reports to the Council the following as a statement of
the expenditures necessarily incurred for and in connection with the making of the above improvement, viz:
Total construction costs
Engineering and Inspection
Valuation and Assessment Services
TOTAL EXPENDITURES
Chazge To: MSA
Net Assessment
$ 1,004,321.00
$ 251,000.00
$ � 9.562.00
$ 1,264,883.00
$ 1 128 276.53
$ 136,6Q6.47
Said Valuation and Assessment Engineer fm•ther reports that he has assessed and levied the total
amount as above ascertained, to-wit: the sum of $136,606.47 , upon each and every lot, part or pazcel of
land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in
accordance with the benefits confezred thereon; that the said assessment has been completed, and that hereto
attached, identified by the signature of the said Valuation and Assessment Engineer, and made apart hereof, is
the said assessment as compJeted by him, and which is herewith submitted to the Council for such action
thereon as may be considered proper.
Dated
�-a�-o� �;�-n�--
aluation and Assessment Engineer
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet
oy-iba�
)epartmentlOffice/Council: Date Initiated:
FS —FinancialServices 27_�UL-09 Green Sheet NO: _3Q731_11
BARB MUNDAHL
266-6112
Musf Be on Council Agenda by (Date):
Doc. 7ype: PUBLlC HEARING
(RESOIIfClON}
E-Document Requiredc N
Document Contact: JUAN ORTIZ
ConWCtPhnne: 2668858
y
Assign
Number
For
Routing
Order
-iV-=
0
�
2
3
4
5
��NG
7
inancisl3ervices
ouncil
i Cluk
Total # oE Signat P _(Clip All Locations for Signature)
Action Requested:
RATiFY ASSESSMENTS FOR IMPROVEMENTS ALONG SIXTH STREET FROM MARIA ST T� SINNEN ST.
FII,E #19068 ASSE5SMENT #095105
Recommendations: Approve (A) or Rejed (R):
Planning Commission
CIB Commitlee
Civil Service Commission
Personal Service Contracts Must Answer the Following Questions:
1. Has this personffirm ever worked under a contrad for this departmenY?
Yes No
2. Has this person/5rtn ever been a city empioyee?
Yes No
3. Does this person/firtn possess a skill not nortnally possessed 6y any
current city employee?
Yes No
Explain all yes answers on separate sheet and attach to green sheet.
Initiating Problem, Issues, Opportunity (Who, What, When, Where, Why):
Ratification is necessry to begin collecting assessments w help pay for the project.
Advantages If Approved:
Same as above.
DisadvantageslfApproved:
Pxoperty owners will have assessmerns payable via property taxes.
�
Dissdvantages IP Not Approved:
To not assess the improvement benefits would be inconsistent withe City policy.
7otaf Amount of $136,606.47
Transaction:
Funaing source: Assessments
Finan cial lnformation:
(F�cplain)
CosURevenue Budgeted: Y
Activity Number:
Julv 28. 2009 10:20 AM pano 9
ReportName: AssessmentProject CITY OF ST PAUL
Project Number: 19068
Assessment Project
Description: East 6th Street:_Maria.toSinnenRSYP E2009}- -- -- -- Inif7alDatec
Improvement: Pave, Curb, and Gutter Pending Date:
Project Manager: JAO Final Date:
Or' t
255.000000
255.000000
Council District: 7 Planning District: O1
Project Items
Item Descrintion Unit of Measure Attribute Unit Rate
Grade and Pave Assessable Fromage (Class 1,2 and 3 only) $38.65
Lighting Assessable Fronta�e (Class 1,2 and 3 only} $b.84
Project Parce3s
Ttem Description
Grade and Pave
L�bhtl�b
Item Descri tn ion
Grade and Pave
Grade and Pave
Lighting
Lighting
Item Descriurion
Grade and Pave
Lighting
Item Desori�tion
Grade and Pave
Lighting
Item Description
Grade and Pave
Ligl�ting
Item Descri tn ion
Grade and Pave
Lighting
20.000000
20.000000
20.000000
20.000000
Ori
39.000000
39.000000
Ori t
39.000000
39.000000
Calc Ouantity Unit Rate
255.000000 $38.65
255.000000 $6.84
Calc Ouantity
20.000000
20.000000
20.000000
20.000000
Unit Rate
$38.65
$38.65
$6.84
$6.84
Calc Ouantitv
39.000000
39.000000
Printed: 7/27/2009
��� � � a'� Page: 1
--- -
08119f2008 - -
12/17/2008
Unit Rate
$38.65
$6.84
Calc Ouantitx Unit Rate
39.000000 $38.65
39.000000 $6.84
Ori t Oalo Onantity Unit ate
39.000000 39.000000 $38.65
39.000000 39.000000 $6.84
� r
, ��
` `".
r' t F Calc Ouantitv Unit Rate
39.000000 39.000000 $38,65
39.000000 39.000000 $6.84
Item Charge
$9,855.75
$1,74420
Item Charee
$773.00
$773.00
$136.80
$136.80
Item Charge
$1,50735
$266.76
Item C�har¢e
$1,50735
$266.76
Item OhaLge
$1,50735
$266.76
Item Charse
$1,507.35
$266.76
Item Descri tion Ori6 Calc Ouantity Unit Rate Item Char2e
Grade and Pave 39_000000 39.000000 $38.65 $1,50735
LigJ�ting 39.�00000 39.000000 $6.84 $266.76
ReportName: AssessmentProject CITY OF ST PAUL Pdnted:7/27/2009
ProjectNumber: t9068 Page: 2
Assessment Project
Description: East 6th Sireet: Maria to Sinnen RSVP (2009) Iniriat Date: 08/19/2008
Improvement: Pave, Cvrb, and Gutter Peuding Date: 12/17/2008
Project Manager: JAO Final Date:
Council District: 7 Planning District: Ol
Proiect Parcels
Item Descripti0u
Grade and Pave
Lighting
Item Descrigtion
Grade and Pave
Lighring
Item Description
Grade and Pave
Lightinb
Item Descr'i to ion
Grade and Pave
Li�ting
Ttem Description
Grade and Pave
Lia�hting
Item Description
Grade and Pave
Lighting
Item Description
Grade and Pave
Lighting
Ori tv
120.000000
120.Q00000
Ong Otv
40.00OD00
40.000000
Orig Otv
40.000000
40.000000
Ori¢ Otv
30.000000
30.000000
OriQ Otv
30.000000
30.000000
nri� nty
40.000000
40.000000
Calc Ouantity
220.000000
220.000000
Calc Ouantity
40.000000
40.000000
Calc Quantitv
40.000000
40.000000
Ca►c Ouantity
30.000000
30.000000
Calc Ouanfif�
30.000000
30.000000
Calc Ouantitv
40.000000
40.000000
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
n"t ate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
$4,638.00
$820.80
Item Char�e
$1,546.00
$273.60
Item Charge
$1,546.00
$273.60
Item Char¢e
$1,159.50
$20520
Item Char¢e
$1,I59.50
$20520
Item Charge
$1,546.00
$2'73.60
Ori
10.000000
10.000000
Calc Qaantity
t0.000000
10.000000
Item Descri�tion Ori Calc Ouantity
Grade and Pave 40.00�000 40.000000
Lighting 40.000000 40.000000
nit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Item Char¢e
$386.50
$68.40
Item Char2e
$1,546.00
$273.60
ReportName: AssessmentProject CITY OF ST PAUL Printed:7l27l2009
ProjectNumber. 19068 r/��rQ�.� Page: 3
Assessment Project ""� � _ _ _
Description: East 6th Street: Maria to Sinnen RSVP j2009} Initiat Datec - 08/19/2008
-
-- Improvemeni: Pave, Curb, and Gutter Pending Date: 12/17f2008
ProjecC Manager. 3A0 Final Date:
Council District: 7 Planning District: Q 1
Project Parcels
Item Descri�t9on
Grade and Pave
Liahting
Item Descri to ion
Grade and Pave
Lighting
Item DescripCion
Grade and Pave
Lighting
Item DescriuYion
Grade and Pave
Lighting
Item Descr�tion
Grade and Pave
Lighting
Item Descri to ion
Grade and Pave
Lighting
Item Descript3on
Grade and Pave
Liahting
0
Ori ri
20.000000
20.000000
Ori¢ Otv
20.000000
20.000000
Ori t
20.000000
20.000000
Ori t
20.000000
20.000000
Ori t
20.00�000
20.000000
ri
20.�00000
20.000000
Caic QuantitX
] 5.000000
15.0OOOOQ
Calc Ouantity
15.000000
15.000000
Calc Ona�xlitv
I5.000000
15.000000
Calc Ouantiri
15.000000
75.000000
Calc Ouantity
15.000000
I5.000000
Calc Ouantitv
15.000000
15.000000
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
nit ate
$38.65
$6.84
IInit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Item Char¢e
$579.75
$102.60
Item Charee
$579.75
$102.60
Item Charge
$579.75
$102.60
Item CharQe
$579.75
$102.60
Item Charee
$579.75
$102.60
Item Char2e
$579.75
$102.60
Ori tv
743.000000
743.000000
Calc Quantity
322.000000
322.000000
Item Description Ori Calc Ouantitv
Grade and Pave 75.000000 75.000000
Liahting 75.000000 75.000000
Unit ate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Item Charee
$12,44530
$2,202.45
Item Charee
$2,898.75
$513.00
Report Name: Assessment Project Printed: 7/27/2009
rroJe�crr�ber i906s CITY OF ST PAUL Page: 4
Assessment Project
Description: East 6th Street: Maria to Sinnen RSVP (2009) Initial Date: 08/19/2008
7mprovement: Pave, Ciub, and Guttet Peuding Date: 12/17/2008
Project Manager: JAO Finat Date:
Council District: 7 Planning District: Ol
Item DesctiPtiort
Grade and Pave
Lighting
Ifem Descri�tion
Grade and Pave
Lighting
Item Descn�otion
Gzade and Pave
Lighting
Item Descriuriou
Grade and Pave
Lighting
Item DescriRtion
Grade and Pave
Lighting
Item Description
Grade and Pave
Lighhtiug
Ori
40.000000
40.000000
O�
40.000000
40.000000
Ori¢ Otv
0.000000
0.000000
Ori
40.000000
40.000000
Ori� Otv
49.000000
49.000000
Calc OuaaYity
40.000000
40.000000
Calc Ouantity
40.000000
40.000000
Calc Ouantitv
0.000000
0.000000
Calc Ouantity
40.000000
40.000000
Calc O�antity
49.000000
49.000000
Unit Rate
$38.65
$6.84
it Hafe
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Item Charee
$1,546.00
$273.60
�tem Char¢e
$1,546.00
$273.60
Item Char�e
$0.00
$0.00
Item Charae
$1,546.00
$273.60
Item Charee
$1,893.85
$335.16
Ori� Otv
40.000000
40.000000
Calc Ouantiri
40.000000
40.000000
Item Descriution Ori Calc Ouantety
Crrade and Pave 38.000000 38.000000
Lighting 38.000000 38.000000
Unit Rate
$38.65
$6.84
nit t
$38.65
$6.84
Item Char�e
$1,546.00
$273.60
Item Chaw_e
$1,468.70
$259.92
Item Descriotion Oris Otv Calc Ouantitv Unit Rate Item Char�e
Grade and Pave 40.000000 40.000000 $38.65 $1,546.00
Ligfiting 40.000000 40.000000 $6.84 $273.60
Report Name: Assessment Project CITY OF ST PAUL Printed: 7l27J2009
Project Number: 19068 � Page: 5
Assessment Project � _ _ _
Deseript'son: East 6th Street: Maria to Sinnen RSVP (2909) initiatDate: -- 08/14/2008
Fmprovement: Pave, Curb, and Gutter Pending Date: 12/17/2008
Project Manager: JAO Finai Date:
Council District: 7 Planning District: Ol
Item Descri�t9on
Grade and Pave
Liahting
Item Descri�tion
Grade and Pave
Lighting
Item Descriotion
Grade and Pave
Lighting
Item Description
Grade and Pave
Lighting
ltem Descri tn ion
Grade and Pave
Lighting
Item Description
Grade and Pave
Lighting
Ori
110.000000
110.000000
Orig Otv
39.000000
39.000000
Ori t
39.000000
39.000000
Ori t
50.000000
50.000000
Ori
40.04000�
40.000000
Calc Ouantity
110.000000
110.000000
Calc Quantity
39.000000
39.000000
Calc Ouantitv
34.Q00000
39.000000
Calc Ouantitv
50.000000
50.000000
�alc Ouantitv
40.000000
40.000000
TJnit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$b.84
Item Char�
$4,251.50
^�752.40
Item CharQe
$1
$266.76
Item Charae
$1,50735
$266.76
Item Charae
$],932.50
$342.00
Item Char¢e
$1,546.00
$273.60
Ori¢ Otv
40.000000
40.OQ0000
Calc Ouantitv
40.000000
40.00OQ00
Item Description Ori Calc Onantity
C3rade and Pave 40.000000 d0.000000
LigJ�ting 40.000000 40.00OD00
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Item Chargg
$],546.00
$273.60
Item Charae
$1,546.00
$273.60
Item Descrintion Ori Calc Ouantity Unit Rate Item Charee
Grade aad Pave 40.000000 40.000000 $38.65 $1,546.00
Lighting 40.000000 40.000000 $6.84 $273.60
Report Name: Assessment Project Printed: 7/27/2Q09
ProjectNumber: 19068 CITY OF ST PAUL page: 6
Assessment Project
Description: East 6th Sh�eet: Maria to Sinnen RSVP (2009) Initial Date: 08l19/2008
Improvement: Pave, Curb, and Gutter Pending Date: 12/17/2008
ProjeetManagec 7A0 FinalDate:
Council DistriM: 7 PJanning District: O]
Project Pareels
Item Descri�Hon
Grade and Pave
Lighting
Item Descriprion
Grade and Pave
Lighting
Item Desen�' tion
Grade and Pave
Lighring
Item Description
Grnde and Pave
L�gnnr�ng
Ttem Descriution
Grade and Pave
LigLting
Item Descrigtion
Grade and Pave
Li�ting
Ori
40.000000
40.000000
Orie Otv
67.000000
67.000000
54.000000
54.000000
Ori tv
80.000000
80.000000
OriQ Otv
40.000000
40.000000
� 1
� ������
�� ��� ��
Calc Ouantitv
40.000000
40.000000
Calc Ouantity
67.000000
67.000000
Calc Oaantitv
54.000000
54.000000
Calc Ouanh�
80.000000
so.000000
Calc Ouantity
40.000000
40.000000
Calc Quantiri
40.000000
40.000000
Item Descrinfion Ori Calc Ouantity
Grade and Pave 40.000000 40.000000
Lighting 40.000000 40.000000
Un't te
$38.65
$6.84
it ate
$38.65
$6.84
Unit ate
$38.65
$6.84
Unit te
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Unit Rate
$38.65
$6.84
Item Charge
$1,546.00
$273.60
Item Chargg
$2,589.55
$458.28
Ifem Charee
$2,087.10
$369.36
Item Charge
$3,692.00
$54720
Item Char¢e
$1,546.00
$273.60
Item Char�e
$1,546.00
$273.60
Item Char�e
$1,546.00
$273.60
Item Descri�t'Zon Orie Otv Calc Ouantitx U it Ra e Item Charse
Grade and Pave 40.000000 40.000000 $38.65 $1,546.00
Lighting 40.000000 40.000000 $6.84 $273.60
ReportName: AssessmentProject Printed:7127/2009
Project Number: 19068 CITY OF ST PAUL Pabe: �
Assessment Project �`�-10?��
-_
---- - -
Description: East 6th Street: Maria to Sinnen RSVP (2q09) _ ��iEsaF Date: --- Q87I972608
lmpaovemertt: Pave; Cnrb, and Guiter Pending Date: 12/17/2008
Project Manager: JAO Final Date:
Council District: 7 Planning District: O1
Project Parcels
Item Descrigtion
Grade and Pave
Ligtrting
Item DescriQtion
Crrade and Pave
Lighting
Item Descriytion
C:rade and Pave
Lighting
Item Descriution
Grade and Pave
Lighting
Item DesG -"t�� tiop
Grade and Pave
Lighting
Item Descri tion
Grade and Pave
Lighting
Ori
40.�00000
40.000000
Ori
60.000000
60.000000
Orie Otv
60.000000
60.000000
Ol'1 t
40.000000
4Q.Q00000
Or�Q Otv
150.000000
I50.000000
r' t
224.000000
224.000000
Calc Ouanfitv
4�.���0�0
40.000000
Calc Ouantity
60.000000
60.000000
Calc Quantitx
60.000000
60.000000
Calc Ouantity
40.000000
40.0�0�00
Calc Ouantity
150.000000
I50.000000
Calc Onantity
240.000000
240.000000
Unit Rate
$38.65
$6.84
U it ate
$38.65
$6.84
nit R te
$38.65
$6.84
Unit Rate
$38.65
$6.54
Unit Rate
$38.65
$6.84
Unit at
$38.65
$6.84
Item Char2e
$1,546.00
$273.60
Item Charae
$2,319.00
$410.40
Item Char¢e
$2,319.00
$410.40
Item Chargg
$1,546.00
$273.60
Item Char�e
$5,797.50
$1,026.00
Item Chazge
$9,276.00
$1,641.60
Parcel Count: 53 Project Total: $136,606.A7