Loading...
194296Council File No. 194296 — In the Matter of regrading and ! surfacing with bituminous material ����� East North- and -South alley from Haw- thorne Ave. to Orange Ave. and the Gr East -and -West alley from the East North- and -South alley to the west line____ of Lot 41, all in Block 2, J. R. Weide's 2nd Addition, under Preliminary Order B 193197 approved July 21, 1959. y A public hearing having been had ____ """_ """ "" the above improvement upon "vrand the Council having objections and rec- h In the Matter of regrading and surfacing with bituminous material the East North - J and -South alley from Hawthorne Ave. to Orange Ave. and the East- and -West alley from the East North -and -South alley to the west line of Lot 41, all in Block 21 J. R. Weide's 2nd Addition; under Preliminary Order ----------- _19.3197 --------------------- approved --------------- JiilY__ 21,__ 1959--------------------- - - - - -- Intermediary Order ------------------------------------- - - - - -- - - - - -- approved ------- - - - - -r ----------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that n o —im- provement to be made by the said City is regrade and surface with tuminous material the East rth� d -South alley from Hawthorne to Orange Ave. and th Bt -and- West alley from -the Ea North -and -South alley to the -w t line of Lot 41, all in Block 2, J. R. Weide's-24d Addition, - ;:Alll orders i,� a {,�;'e r,i,�� f 'd i' . same are cancelled, annulled and rescinded and ail proceefitngs in said matter be disco►itiiwed. and the Council hereby orders said improvement to b made. RESOLVED FURTHER, That the Commissioner o lie Works be and is hereby ' strutted and direc a 'to -grs re plans and specifications for said improvemen , d submit same to the until for approval; that upon aid approval, the proper city officials are hereby thorized and directed pro- ceed with the makin of said improvement in accordance therewith. Adopted by the Council -------- GGT__ __ 95a_____________________ 0 C 1 19�g Approved------------------------------ - - - - -- File 14608 Councilman DeCOURCY Councilman r- HQI:hAAID Councilman MORTINSON Councilman '- TETERS904 Councilman ROSEN Councilman WINKEL Mayor DILLON / (� o 2.55 2M 2 --------------------------------- City Clerk. -------------- - ------------------ Mayor. a 13LISI ETj 16 - 1-7 - S CITY OF ST. PAUL • DEPARTMENT OF FINANCE + REPORT OF COMMISSIONER OF FINANCE (A, ON PRELIMINARY ORDER 1,9 ,A u �a y In the matter of regrading and surfacing with bituminous material the North - and -South alley from Hawthorne -,Ave. to Orange Ave. and the East- and -West alley from the East North - and -South alley to the west line of Lot 41, all in Block 2, J. R. Weide's 2nd Addition r i L j under Preliminary Order approved July 21, 1959 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated cost of the above improvement is - - - - - - $ 2.893.55 The estimated assessment per foot for the above improvement is - - - - $ see P. W. letter The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: Form B. B. 10 1M 8 -58 8 II DESCRIPTION I LOT IBLOCKI ADDITION I VALUATION LAND BLDG. II I 1 1 2 1 Joser)h R. Weide is Second II Z],�0 $2250 11 1 2 1 2 1 Addition to the City of St. II `625 11 1 3 1 2 1 Paul, Minnesota 11 625 II I I I II - 2 1 do (.1875 51", II 1 121 do �(x 16 T-21 do �( 11 III 7 2 do [A2c; 250 !I 12 do 625 Form B. B. 10 1M 8 -58 8 CITY OF ST. PAUL DEPARTMENT OF FINANCE y REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (C) _ IIDESCRIPTION IBLOCKI ADDITION II LAND VALUATION BLDG. II 1 9 1 21 Joseph R. Weide's Second 11 00 II1 101 21 Addition to the City of St. ( II I I I Paul, Minnesota II _ II 1 111 2 1 do II ( 750 6400 11 Except West 20 feet; Trot 13 and I I I Il II all of Lot 1 121 2 1 do IlWest 20 feet of Let 13 and all of 1 11} I 2 I do 550 6).5o II East 7.50 feet of Lot 391_Lot)40, 1 1 1 11 IIand West 2j feet of 141 2 do I q2K 2500 IIWest 4.9 feet of Lot 42 and, except) I I-- II 11 West 2� feet; 1 411 2 1 do II ^400 2750 IIExcept West 4.9 feet; 1 421 2 1 do II 300 2550 I I I II II. I I II I I II 1 1 TOTAL II $9,425 78,650 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made 1E to him in reference to said matter by the Commissioner of Public Works. Date Commissioner of Finance. ,�/- Form B.B. 12 1M 348 8 r OFFICE OF THE COMMISSIONER OF PUBLIC WORKS . r. REPORT TO COMMISSIONER OF FINANCE August 3rd 19 59 To the Commissioner of Finance of the City of Saint Paul: t t The Commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 193197 , approved July 21st , 19-5-9, relative to regrading and surfacing ,5!K ,- with bituminous material the 'North—and—South alley from Hawthorne Ave. to Orange Ave. and the East—and—West alley from the East- North and South alley to the west line of Lot 41, all in Block 2, J. R. Weide's 2nd Addition and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. 2. The estimated cost thereof is $ 2,893-55__, and the total cost (See Letter Attached) ` thereof is $ and the nature and extent of said improvement is as follows: 3. A plan, profile or sketch of said improvement is hereto attache and made a part hereof. 4. - 5. Said improvement is asked for upon petition of three 1� r owners of property, subject to assessment for said improvement. r AD !AN P4 1 EL C V�O9 / wit, rk� Commi sinner f u 1'c 4J r' • To The H6norable, The Council, City of St. Paul, Minn. • St. Paul, Minn . - - - -- M- 4-- Y - - - -- -- ------- -19 -5% Gentlemen: We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvemept to b m e: rim - -- -- S'vrTe? /- e. - - -�au �•� f/ �hli� St. Ave. from w r ',W - - - -- rte ---------- - --at. Ave. to------- C��A!�,q -- `tee - - - - -- --------------- - - - -=St Ave. 6M 6 -66 a2 i LOT BLOCK ADDITION ' Payne Avenue Dente Bu 1 Medical and C 4 2 Osep 1 K. to City of St. Paul 5 2' " n r 6 2 11 �1 7 2 /f 8 2 11 9 2 11 tea. �G�o�,r✓''' 10 2 /1 ast 30 _ot 42 t -. 2 " i- 6M 6 -66 a2 i v GEORGE M. SHEPARD Street & Highway Engineering Coordinator 41� CITY OF SAINT PAUL Capital of Minnesota DEPARTMENT OF PUBLIC WORKS ADRIAN P. WINKEL, Commissioner CLIFTON G. HOLMGREN, Deputy Commissioner 234 City Hall & Court House 8 August 3, 1959 Hon. Adrian P. Winkel F ARTHUR W. TEWS Chief Engineer F s- Commissioner of Public Works City of Saint Paul Dear Sir: 1 transmit herewith preliminary estimate of cost for regrading and surfacing with bituminous material the North and South alley from . Hawthorne Ave. to Orange Ave. and the East and West alley from the East - North and South alley to the west line of Lot 41, all in Block 2, J. R. Weide's 2nd Addition, under Preliminary Order C. F. 193197, approved July 21, 1959. Total Estimated Cost Engineering Inspection Cost per front foot (Surfacing ;wY (Drainage (Grading Frontage (Grading N -S alley (Surfacing (Drainage r $2,893.55 210.44 = 52.61 1.50 0.50 to 1.00 6.80 343.60 ft. 139.85 ft. 468.17 ft. Yours very truly, Arthur W. Tews Chief Engineer t 4, Approved for transmission to CV'VA IVA the Commissioner of Finance p /V Adrian . Wink Commissioner of Pub W r• 17% JAL., v, Swl� ya cr. ts 4L Sl 4, 7 0.., " 4. WPI 4­, j, I's IrK 4 lk 'A'A ARG!, �­;j- A4, - 4A,:" NR W; _w