Loading...
194588COUNCIL FILE NO------------------------- By---------------------------------------------------------------- FINAL ORDER 1 In the Matter of constructing a sanitary sewer in Stewart Avenue from Rankin Street FINAL ORDER to Homer Street; `Council File No. 194588 — In the Matter of constructing a sanitary sewer in Stewart Avenue from Rankin Street to Homer Street, under Preliminary Order 192899 •approved June 25, 1959. A public hearing having been had jupon the above improvement upon due notice, and the Council—}uvdr^ under Preliminary Order--- - - - - -- 29x$9----------------------- approved ----- - - - - -- ,Tune-- -2S,-- .1959.- IntermediaryOrder ---------------------------------------------- - - - - -- approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature,,!xtent and kind of im- provement to be made by the said City is to construct a sanitary sewer in Stewart Avenue from Rankin Street to Homer Street, and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said impro nJ�i1g5q?rdance therewith. Adopted by the Council-------------------------------- - - - - -- --- - - - - -- NOV 10 1959 Approved------------------------------------- PUBLISHM File 14576 Councilman DeCOURCY Councilman HOLLAND Councilman MOR i iNSON Councilman *�IER56N—• Councilman ROSIN Councilman WWL r DFI�lON —� Mayor �� �; �::.�...t e�_�:.+ Mr. Vice President (PCMT#QW 2.55 2M 2 ---------------------------------------------- City Clerk. --------------- - - - - -- Mayor. Acting, CITY OF ST. PAUL , DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE CAI ON PRELIMINARY ORDER L In the matter of constructing a sanitary sewer in Stewart Avenue from Rankin Street to Homer Street 19�� 10 9 under Preliminary Order approved June 25, 1959 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated cost of the above improvement is - - - - - - $ 67909-3.00 The estimated assessment per foot for the above improvement is - - - - $ 38 -86 The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: IIDESCRIPTION I LOT ISLOCKI ADDITION I LAND VALUATION BLDG. II 1 171 111 Pal i sa .i de A di on . .o S , Paul 1 $175 11 1 181 131 do 11 150 1 �� 11 20 1 131 do 11 190 11 1 211, 131 do 200 it1 1 1 1 1 Younogn and Lamm's Addition 95 IIIRamsey Co.- Minnesota 100 3 1 1 1 do 11 125 4 1 1 1 do � 150 1i I I 1 1 do 1q0 II Form B. B. 10 1M 9 -58 a L Y CITY OF ST. PAUL ' DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (gl DESCRIPTION LOT BLOCK ADDITION ASSESSED VALUATION land { bldg. 6- _ 1 -- - Youngman ..and . Lamm Is Addition -. - $ 50 _ _ 7 1 Ramsey Co., Minnesota 1501 - — - - - - - 8 - 1 - - do - 175 1750 That part of lot 15 lying south of southerly line of north j of Block i ! 13,, Palisade Addition _produced across said Lot - - _ -_ 15 _ _ _Fort Street Out ,Lots- _ ._. 1 725 _ That part of-lot 16 lying southeast- erly of a line drawn parallel with and distant 1-45 feet northwesterly_ t from the southeaster line of-said � 16_ do _ _ _ 0 75i East. of.lot- 251- do,-. _ .. _. 250 _. a 2950 That part -lying northerly -of- south- _ erly line of Youngman Ave. produced of westerly i of-lot 25 and of lot, 26 _ - _ do 675_ i r East- 4 .of lot - - -- --- - - _ - _27 _- __ _ do . - - -- - - - 150 - _1 _ _.Youngman's Rearrangement of - i - -2 50 2 __ . _ ___ _Lot 17_ of _Fort St. outlots _ _ -200 j 3 _ - __ — - _ - do - :- -- _ _ _ __ 200 t 4- - _ _ —do----- 11 _200_1 , 600_ do--- t ( _200 i FORM 8.9.11 TOTAL CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER (C) IIDESCRIPTION I LOT IBLOCKI ADDITION II LAND BLDG. 1� 11 I I Thauwalds Addition to St, Paull 6 75 !! 12 I I do II 150 !! 13 I I do II 150 !! 14 1 1 do II 150 II I I I II !I I I I n II I I II I! I I I II II I I I II II I I I II II I I I II II I I I >I II I I I TOTAL 11$6,200 $6,15 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. �' Dated /u l9 a�i DLO. .� �u A. /�% Commissioner of Finance. as Form B.B. 22 IM 9 -58 8 OFFICE OF THE COMMISSIONER OF PUBLIC WORKS i f� REPORT TO COMMISSIONER OF FINANCE d � / (('s--7-6 July 2nd 19 59 To the Commissioner of Finance of the City of Saint Paul: -N% The Commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 192899 approved June 25th , 19 59 , relative to constructing a sanitary sewer in Stewart Avenue from Rankin Street to Homer Street and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. 2. The estimated cost thereof is $ 67,023.00 , and the total cost (See Letter Attached) thereof is $ and the nature and extent of said improvement is as follows: 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 4. 5. Said improvement is asked for upon petition of three or more owners of 1 subject to assessment for said improvement. WINKEI- Co ss� lone >s59 op wl �F' ' 19`899 St. Paul, Minn-------- - - - - -- - ------- - -19 -- a To The Honorable, The Council, City of St. Paul, Minn. Gentlemen: ` We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: f-^ ---------- - - - - -- -------------------------- ('- - - - - -- • --------------- e- r---- - - - - -- 4:�p ------------------------------------------ - - - - -- -- - - - - -- � o r ------------ - - -St. Ave. from / �.� .��� -------------------- - - -St. Ave. to -------------- - -ern "r --------------------------- ------------- ------ - - - - -- --------------------------------------------------------- - - -St. Ave. I NAME LOT BLOCK ADDITION 3¢/7/ - G z 7 � 016 V � D lop 6M 6 -66 00§002 A v �o o / C-6QD A t - GEORGE M. SHEPARD Street do Highway Engineering Coordinator CITY OF SAINT PAUL Capital of Minnesota DEPARTMENT OF PUBLIC WORKS ADRIAN P. WINKEL, Commissioner CLIFTON G. HOLMGREN. Deputy Commissioner 234 City Hall & Court House October 7, 1959 Mrs. Donald DeCourcy Commissioner of Finance City of Saint Paul Attention: Mr. Eltor Dehn Dear Sir: ARTHUR W. TEWS Chief Engineer On July 2, 1959, a report was sent to your concerning the con- struction of a sanitary sewer in Stewart Avenue from Rankin Street to Homer Street. The estimated cost per front foot was $38. .86. Your Department has determined that the maximum rate of assess- ment based on benefit for this property is $20.00 per front foot. There- fore, will you kindly revise the financing of this project as follows: Estimated Total Cost $67,023.00 Engineering S Inspection 6,093.00 Est. Assessment 1725.ft. 0$20.00 34,500.00 City's Share 31 E =1 32,523.00 Cost per front foot to property owners 20.00 Frontage 1725 ft. PJohn very truly, . Holmboe Works Sewer Engineer JAH /jv Ap ed: Adrian P. inkel Commissioner of Public Works 4 Ap oved: Eu ene V. Avery Chief Engineer