Loading...
08-88RESOLUTION OF SAINT PAUL, MINNESOTA Presented By: Cauncil F'de # Greeu Sheet # 08-5� 3049113 /V Referred To: Committce: Dat 1 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 58 59 60 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 WHEREAS, the Citywide Capital Maintenance Pro�am provides capital funding for the repair, replacement, renovation, zemodeling and/or re�ofitting of [he struc[ural parts and/or service system components of city buildings; and WHEREAS, the program has been funded annually since 1986; and WHEREAS, there is a need to adjust prioryeaz and curren[-yeaz program budgets to reflect approved project additions and iransfers of balances from prior-yeaz budgets; now THEREFQRE BE TT RESOLVED, by the Council of the City of Saint Paul, upon recommendation of the Mayor and advice of the Long-Range Capital Improvement Budget Committee in the attached December 11, 2007 report, that $1,668,000 is available for appropriation in the 2008 Capital Improvement Budgets, as heretofore adopted and amended by this Council, and aze hereby further amended in the following particulazs: Current Bu et FINANCING PLAN 2008 Capita] Maintenance &ogram C08-9T038-xxxx- 2008 Capital Improvement Bonds (7325) SPENDING PLAN 2008 Capital Maintenance Pro�am C08-9T038-�cxxc- Capital Improvement Bonds COS-9T038-0279-00000 / P7-925-90108-0565-70100 Pazks and Recreation (93003) COS-9T038-0279-93003/P7-925-90108-0565-70103 Police (93004) C08-9T038-0279-93004/P7-925-90108-0565-70104 Fue and Safety Services (93005) C08ATQ38-Q279-93Q05 ! P7-925-9�108-Q565-701a5 Libiaries (93008) C08-9T038-0279-93005 / P7A25-90108-0565-70108 Safety andInspections COSAT038-0279-93009/P7-925-90108-0565-70109 Public Works (93002) C08-9T038-0279-93002/P7-925-90108-0565-70102 ..• ��� �� ... Ilt I1 1,668,000.00 0.00 0.00 0.00 0.00 0.00 1 Amended Chanee Budeet 0.00 1,668,000.00 0.00 1,668,000.00 (1,668,000.00) 77A,000.00 30Q000.00 30,800.00 57,000.00 332,204.00 1OQ000.00 � �� 774,000.00 300,000.00 30,800.00 57,000.00 332,204.00 100,000.00 SS 86 87 88 89 Emergency Conungency (00000) COS-9T038-O518-00000/P7-925-90108-0565-70100 curreot Budeet t �t 1,668,000.00 Adoption Certified by Council Secretary: BY� // /fd/!i/�il/ i/li7 Approved by Ma . � By: Approval Recommended by OFjS� By: ~ le i, i Form Approved by City Attorney: By: Approved by Ma By: DS-88 Ameaded ChanQe Bu et 73,996.00 73,996.00 0.00 1,668,000.00 2 Adopted by Council: Date 2/�/�(��� � Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet � d8-8� FS — FinancialSerrtces Contact Person & Phone: Dede Demko 266-8545 Mu3t Be On Cquncil Aaen DoG. Type: RESOLUTION W/$ TRANSAC E-DOCUment Required: N Document Confact: Contact Phone: 2&JAN-08 � Assign Num6er Fw Ro�ting Order ToWI p of Signatura Pages _(Clip AII Locffiions for Signature) Green Sheet NO: 3049113 0 mantialSeceices 1 mancialServices De artmentDimctor 1 2 aalServices ceEtinancialServiccs 'r� 3 Attorne � 4 or's Office hIa or/Assistaot 5 a1 C' CounN 6 (,9erk C" Clerk Approval to amend current yeaz budget for adoption of the 2008 Capitai Maintenance Program recommendations. PVanning Commission CIB Committee Civil Service Commission 1. Has this persoNfirtn ever worked under a contrac[ for this department'? Yes No 2. Has this persoNfirm ever been a city employee? Yes No 3. Does this person/firm possess a skill not nortnally possessed by any curcent city employee? Yes No Explain all yes answers on separate sheet and attach to green sheet Initiating Problem, Issues, Opportunity (Who, What, When, Where, Why): Each yeaz an appropriation is made for capital maintenance projects. The process required to allceate these funds to specific departments includes proposal submissions by depaztmenu, Long Range Capital Budget Committee / Subcommmittee review and ultimately recommendations made by the CIB Committee. This resolution reflects the outcome of that proces�s and the department allocations recommended. AdvanWges K Approved: The program's budgets will reflect the cutrent status of approved projects. DisadvanWges if qpproved: None. Disadvantages If Not Approved: The program's budgets will not be corrected to account for changes in approved projects and departmenu will not be able to begin the needed maintenanceidentified. 7ransaction: $1,668,000.00 Funding Source: CIB 80nds Finaneial I�rformation: (Euplain) Aetiviry Number. Va�iOUS CosVRevenue Budgeted: Y RECENED �At� 2 9 2aoa January 23, 2008 2:33 PM Page 1 2008 Citywide Capital Maintenance Program Project Proposal Summary �'gg Dept Priori Pronosal Title PARKS & RECREATION 1 Como Picnic Pavilion Serving Windows Replacement 2 Rice Paik Electrical Service 3 Cherokee Pazk Restroom Building Re-Roof 4 Forestry Gazage Gutter and Flashing Repair 5 Hamm Plaza Ductwork Replacement 6 Duluth & Case Gym F1oor Replacement 7 Baker Rec. Annex Furnace Replacement 8 Oxford Aquaac Center Gutter IZeplacement and Tile Repair 9 Como Zoo Marine Mammal Air Handler Replacement 10 Como Zoo Lazge Cat Building Furnace Replacement 11 Prosperity Rec. Center Gym F1oor Replacement 12 Palace Rec Center Gym F1oor Replacement 13 Midway Stadium Field Lighting Contactor Replace 14 Como Golf Clubhouse Roof Repair 15 Como Zoo Main Building Roof 16 Como Zoo Marine Mammal E�ibit Lights 17 Como Zoo Old Hoofstock Pillaz RestoratioNTuckpoints 18 Como Zoo Primate Building Lighfing Replacement 19 Como Zoo African Hoof Bldg Lighting Replacement 20 Como Zoo Primate Building Skylight Replacement 21 Conway Rea Center Furnace Replacement 22 Como Zoo Lazge Cat Building Enuy Door Replacement 23 Edgecumbe Rec. Center Roof Replacement 24 Hayden Heights Rec. Center Roof Replacement 25 Baker Rec. Annex Electrical Service 26 Meazs Pazk Electrical Service 27 Hayden Heights Rea Centec Skylight Replacement 28 Division-Wide Key Core System 29 Wigina on Pavillion North & South Patio Replacement 3� Como Conservatory Sunken Gazden Hydronic Headng System 31 Como Streetcaz Staaon Roof Saddles 32 Como Zpo Seal Island Deck Resurfacing 33 Highland 9-Hole Golf Irrigation System Replacement 34 Highland Pazk Aquatic Center Bottom Repa's 35 Hillcrest Rea Center Outdoor Stair Replacement 36 Como Zoo Bird Yazd Elecuical System Replacement 37 Meazs Park Plaza Rebuilding 38 Ccosby Pazk Reshoom FixturelShelter Table Replacemen[ 39 Como Central Service Gazage Door Replacement 4� Como Golf Pazking Lot and Path Repair acid Seal Coat 41 Merriam Park Rec Center Gym Lights 42 Martin Luther King Rec Centez Boiler Contcols 43 Como Conservatory Crrowing House Polycazbonate Repl. 44 Como Conseivatory North Gazden Lighting Replacement 45 Kellogg Pazk Holiday Light Electrical Service 46 Como Zoo Trout Stream Exlubit Reconstrucuon 47 Highland Pazk Picnic Table Replacement 48 Como Pazk Picnic FIill Table Replacement 49 Newell Park Picnic Table Replacement 50 Hidden Falls Pazk Picnic Table Replacement Project Dept Score Re uest 39 36 34 38 38 38 33 33 35 38 38 38 35 33 33 22 31 22 22 29 33 25 33 33 31 30 29 20 30 30 29 27 26 24 24 23 27 23 22 ?2 22 ai 20 20 20 24 20 20 20 20 5,000 35,000 45,000 7,000 5,000 42,000 25,000 200,000 175,000 142,000 41,000 69,000 25,000 24,000 25,000 13,��0 60,000 11,000 17,000 120,�00 84,000 50,000 175,000 102,000 5,000 10,000 35,000 50,000 100,000 30,000 11,000 14,000 170,000 170,000 9,000 5,500 88,000 23,000 5,000 52,000 9,500 6,000 35,000 11,000 20,000 200,000 77,000 28,000 77,000 62,000 CIB Cmtee Tentative Tentative 20Q8 2009 �� 111 � 111 �� 11t 25,000 200,000 � !�� 175,000 142,000 41,000 69,DOQ 25,000 24,��0 25,000 13,000 60,000 11,000 17,000 120,00� 84,000 50,�00 175,000 102,000 5,000 10,000 35,000 50,000 100,000 30,000 11,000 14,000 17Q000 9,000 5,500 5,000 9,500 6,000 35,000 11,000 1/2812008 Dept Priori 51 52 53 54 55 56 57 58 59 60 61 62 63 Pronosai Title McMurray Field Drinking Fountain Replacement Hayden Heights Rec. Center Siding Replacement Meazs Pazk Bench Restocation Como Conservatory Rack and Pinion Arms Replacement Upper Landing Puk Foundaaon System Repairs Hayden Heights Rec. Center Outdoor Safety Lighang Mazgazet Rec. Center Outdoor Safety Lighting Como Golf Bunker Renovauon Como Zoo G'uafFe Holding Area Door Replacement Como Zoo Conservatory Gutter Repair Phaien Pazk Picnic Pavilion Restroom Fixture Como Zoo Giraffe Shade Cloth Replacement Como Campus Service Drive and Pazking SAFETY & INSPECTIONS 1 Skyway Bridge Painting 2 Skway Bridge Pigeon Proofing & Digital Signage 3 Bases for Kennels 4 Gazage F1oor & Threshold Replacement LIBRARIES 1 Elevator Code Up�ades 2 Re-line Copper Gutters - Central Library 3 Replace Corroded Steel Door - Merriam Pazk Librazy 4 Re-caulk Sidewalk & Baulstrade - Central Library 5 Exterior Pain6ng & Waterproofing - Riverview Library FIRE & SAFETY SERVICES 1 Window Replacement - Station 22 2 Window Replacement - Station 19 3 Window Replacement - Stapon 9 4 Training Classroom Roof Replacement 5 Vehicle E�aust Replacement 6 Central A1C Replacement Living Quarters - Station 5 PUBLIC WORKS 1 Municipal Equipment Gazage Back-Up Generator 2 Ciry Hall Annex 7th Floor Computer Room Remodel 3 Municipal Equipment Gara�e Make-Up Aic System 4 Restorauon of Iron Fagade Elements 5 Securiry Gate and Conuoller 6 Resurface Traffic Operations Gazage F1oor 7 Resurface Tr�c Operations Pazking Lot b$'�S$ Project Dept. Score Request 22 17 14 IS 18 16 16 18 13 13 13 12 22 1'! 11 • 1�� . ��1 . 1 111 ��� 111 � 1 111 11 � 11 : 111 38 198,999 38 91,655 46 12,500 41 29,050 332,204 42 22 23 22 22 50,00� 125,000 7,000 15,000 CIB Cmtee Tentahve Tentative 2008 2009 6,000 12,000 4,500 8,000 774,000 1,259,500 198,999 91,655 12,500 332,204 0 50,�00 7,000 15,000 222,000 57,000 40,000 22 69,090 69,090 22 69,090 69,090 22 69,090 69,090 36 30,800 30,800 47 414,000 138,000 32 33,000 685,070 30,800 345,270 20 45,000 45,000 22 55,000 55,000 17 120,000 22 200,000 19 25,Q0� 19 100,000 22 185,000 730,000 100,000 25,OOQ 25,000 1/28/2008 Dept Pn'oritv Proaosal Title POLICE DEPARTNIENT S Eastem District Roof Replacement - Comer wBillboazd Z Eastern District Roof Replacement - Rest of Roof 3 Outdoor Range Safety Wall 4 Indoor Range Facility Maintenance (Granulaz Trap) 5 Indoor Turning Tazget System 6 Outdoor Ranae Canopy Repair 7 Homicide Unit Securiry Improvements 8 Canine Faciliry Pazking Lot 9 SWAT & Academy Obstacle Course 2008-2009 FCINDING PROPOSED FOR DEPARTMENTS EMERGENCY CONTINGENCY TOTAL REQUEST/RECOMNIENDED ���D Project Dept Score Re uest 25 25 43 34 16 15 15 14 15 1 111 :1 111 : 111 11 1 111 1 tll 1 111 ' tll 500,000 CIB CIDtCC Tentative Tentative 2008 2009 120,000 180,000 18,000 15,000 30,000 20,000 300,000 83,000 73,996 � 79,230 ii2sizoos