198385i
r
� ,
COUNCIL FILE N0_______ Q 8"
By---------------------------------------------------------- - - - - --
FINAL ORDER
In the Matter of grading and surfacing with Bituminous Material the alley in
block 2, Santucci Addition, from Walsh St. to Greenbrier St.
✓- I FINAL ORDERS
Council File No. 198385—
In the matter of grading and surfac-
ing with Bituminous Material the alley
in Block 2, Santucci Addition, from
Walsh St. to Greenbrier St., under
P� !•lim i.i'lr!- Qr{leY .� l2`11�n�., .2FT, *Q�(P,!i
under Preliminary Order__________ 19690____ approved ________ April 28, 1960
a - - --9
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to grade and surface with Bituminous Material
the alley in Block 2, Santucci Addition, from Walsh St. to Greenbrier St.
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council --------- AUS_I AA!_ __________________`__ /
CMG
------- - - - - -- - - - - -- ------------------------ ------ --------- -
AU,G � 9 1960' � City Clerk.
Approved------------------------------------ - - - - --
File 1.4916
Councilman_..
Councilman Holland
Councilman Loss , i
Councilman Mortinsoi!
Councilman Peterson
Councilman Rosen
Mayor Vavoulis
y� 2.55 2M 2
Mayor.
CITY OF ST. PAUL
' s DEPARTMENT OF FINANCE
• REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(A)
In the matter,.of grading and surfacing with bituminous material the alley in Block 2, Santucci
Addition, from Walsh St. to Greenbrier PSt.
under Preliminary Order-approved April 28, 1960
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $ 2,652,00
The estimated assessment per foot for the above improvement is - - - - $ 305
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
1
each lot or parcel as last reported by the Assessor, are as follows:
Form B. B. 10 1M 3 -58 qep.8
DESCRIPTION
I LOT
IBLOCKI
ADDITION
ASSESSED
VALUATION
LAND BLDG.
!I
1 1
1 2
1 Santucci Addition
100
II
I 2I
2
II 100 600
II
1 3121
II 100
II
14
I 2
I
II 100
II
1 5
1 2
1
100
p
1 6
1 2
I It
125
!I
17
I 2
I 1'
II i �5
II.
181
2
1
II 700 6100
IiWest
6 feet of lot 10 & all of lot I
9
i 2
I It
700 5250
i!Except
west 6 feet; 110
I 21 I
"
700
II
1
Form B. B. 10 1M 3 -58 qep.8
ICITY OF ST. PAUL - V
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
IIDESCRIPTION I LOT IBLOCK I ADDITION II LAND BLDG.
11 121 S —augs! Axld.itian 1197nn 63W
II 700 5650
i Il 12 1 II 700 6100
700 5100
I► I I I II
II I III g .
II I I i I II
�! I III II
II I I ' I II
! I I I II
II I III 11
TOTAL 11$5650 $
I
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
• I
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Dated
Commis loner of Finance.
Form B.B. 12 1M 3 -58 ° 8
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
0
May 3rd 19 60
i
To the Commissioner of Finance of the City of Saint Paul:
I
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 196904 ,
I
approved April 28th I , 19 60 , relative to grading and
'
surfacing with bituminous materi I al the alley in Block 2, Santucci Addition from
Walsh Street to Greenbrier Street
and having investigated the matters and things referred to therein, hereby
reports:
,652.00 (See Letter, Attached)
1. The estimated cost thereof is $ 2_
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3. Initiated by the Commissioner of Public Works
4. Improvement is asked for upon petition -
ADRtAiV P. Wli gKEL
I commission r
�'• of public
01NANICE I Co ' i ss i oner 6 Pu 1 i c o k
OF
I
* M
•'To The Honorable, The Council,
City of St. Paul, Minn.
Y
Y
11
•
July 29,
St. Paul, Minn------------------- - - - - --
--- - - - - -- 1959 - - --
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
I
Grading of.an_Alley__to servelboth East Hoyt and East Iowa
------------------------- - - - - -- • -- - - - - --
-------------------------------------------------- - - - - -- ------------------------------------------------------------------------------ - - - -- FME;
from Walsh ------- - - -St. A to - - -- Greenbrier
--------------------------------------------------------
-------------------------------------------------------- - - - -St I Am
6M 6 -66 2
i
NN
Y
RECD AUG 171959
IN W4 -4-1
MOM
MA
RE
r
6M 6 -66 2
i
NN
Y
RECD AUG 171959
' GEORGE M. SHEPARD
Street do -High*ay Engineering Coordinator
J
i
II
f
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WINKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
234 City Hall & Court House
O
1
1 May 3, 1960
EUGENE V. AVERY
M7011M.
Chief Engineer
Hon. Adrian P. Winkel
Commissioner of Public Works
City of Saint Paul t
Dear Sir:
I transmit herewith preliminary estimate of cost'for grad-
ing and surfacing with bituminous material the alley in Block 2,
Santucci Addition from Walsh Street to Greenbrier Street, under
Preliminary Order C. F. 196904, approved April 28, 1960.
Total Estimated Cost $2,652.00
Engineering I 192.88
Inspection I 48.22
Cost per front foot 3.85
Frontage 690 ft.
Approved for transmission :to
the Commissioner of Finance
AIdi o1nkel
Comm? of PAO
Yo s very truly,
Eugene V. Avery
Chief Engineer
7tAY4E 1 � 60 N 0 NOR �,,
14
E06EI rOA/
kE-
Ph
ST 77-
t
C Q c
If