198855COUNCIL FILE N0 -------
'�
e
By----------------------------------------------------------------
FINAL ORDER
In the Matter of reconstructing the sidewalk on both sides of Taylor Ave. from
Snelling Ave. to Pascal St.
under Preliminary Order ----- 196!}10------------
-Council File No. 198855 —
In the matter of reconstructing
sidewalk on both sides of Taylor .
from Snelling Ave. to Pascal St, w
'Preliminary. Order 196410 appr<
March 23, 1060.
A public hearing having been
upon the above improvement u
due notice, and the Council ha,
heard all ppersons, objections
•a;.q: ter. S�i..u-- „•. <......,.rta..-
a +.
- approved - - -- March �3 �960 ---------------------------- - - - - --
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is. to reconstruct the sidewalk on both sides of
Taylor Ave.from Snelling Ave. to Pascal St. except where good and sufficient
sidewalks now exist.`_
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
SS.E P 13 1960
Adopted by the Council - -_-
S E P 131960
Approved------ -------------- - - - - --
File S6346
Councilman
DeCourcy
Councilman
He"amd�
Councilman
I ass.—
Councilman
h'ortinson
Councilman
Peterson
Councilman
f Q"z —
Mayor
vavoulis
2.55 2M 2
------------------------
- -- Lam-” -- - -- - -------- -�1� -� -- ��/ - - - -�
City Clerk.
i
- - - - - -- - -- ------------------------
Mayor.
! V CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINAN :-16
ON PRELIMINARY ORDER e) 6 3
(A)
In the matter of
,4 198515..
Reconstrncting the sidewalk on both sides of Taylor Ave.
from Snelling Ave. to Pascal St.
under Preliminary Order approved
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $
The estimated assessment per foot for the above improvement is - - - - $
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
Form B. B. 10 1M 8 -58 q 8
Y
DESCRIPTION
I LOT
IBLOCKI
ADDITION
I LAND VALUATION BLDG.
II E 4147/100 ft of S 5 ft of Lot 5
and E l of Lots 6 and
I 7
I ILI
Colleee Place as o
II 2,,100
II Wj of E� of Lots 6 and
I 7
4
I College Place East Division
II 525
IIEx -W 43 ft * of Lots 6 and
I 7
I 41
Colle a Place East Division
II 00 4,500
IIW 43 ft of Lots 6 and
1 7
I 41
College Place East Division
II 525 32500
II
E 40 ft of Lots 8 and
I 9
I 41
College Place East Division
475 250
II
E 62 ft of W 127 £t of Lots 8 and
I 9
I 41
College Place East 'Division
725 3 150
W 65 ft of Lots 8 and
I 9
I 4I
College Place East Division
II 800 2,300
II
Lots 1 thru 4 and Lots 8 thru 14
I thru 7 And ex W 10—ft. for
I
I 51
IILots
IISnelling
Ave. Lots 8 thru ].4
I 61
College Place East lAvision
28,200 23,000
IIW
36 ft of Lots 1 and
2 1
71
College Place East Division
1`1 450 2,700
I!
I
I
I
1`1
Form B. B. 10 1M 8 -58 q 8
Y
i
(C)
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINA (9--t
- t,
ON PRELIMINARY ORDER —.-
II
DESCRIPTION
LOT IBLOCKI
ADDITION
I LAND VALUATION
BLDG.
,
E 36 ft" of W 72 ft of Lots 1 and 1
2
1 71
College Place East Division !!
450 2, 600
!!
E 36 ft of W 108 ft of Lots 1 and 1
2
1 71
College Place East Division !!
450 2,700
1IE
36 ft of W 144 ft of Lots 1 and
1 2
1 71.
College Place East Division 11
450 2,100
II*
of vac Asbury St adj and fol
ex W 14 ft Lots 1 and
! 2
I 7�o1
I II
College . Pla East Division
475 3s Q5(
UI
I College Place East Division
II 8.200 72,15Q
IILot
5 Kerans Re and in sd College
_Pl E Div Lots 4 thru 7 and E2 of
II
vac Asbury St adj and
. fol Lots 8 thru 114
1 81
College Place East Division
L09875 470,750
!!
Subj to esmt and ex W 55 8/10 ft
1 1
1 9
College Place East Division
625 1,850
I)
With esmt the E 45 8/10 ft of W
55 BZ10 ft of Lots 1 and
I
I 91
College Place East Divi ion
II 575 h025Q
II
TO of Lots lauand
1l1
I 9
College Place East Division
11 1.150 35,100
!!
Ex E 35 ft the Ei of Lots 13 and
1 111
1 91
College Place. East Division
625 31150
IIW
10 ft of Lots 1 and 2 and E 35
ft of Lots 13 and
I 711
I 9
I College Place East Division
II 575 2,400
!,
Lots 1 thru
I 4
!
I Coughs Rearrangement
!! 2,675 29150
II
I 1
!
1 Kerans Rearrangement
!! 700 3,400
1I
I 2
I
I Kerans Rearrangement
!! 550 2,150
III
3
I
I Kerans Rearrangement
!! 550 1050
1)
! 4
I
1 Kerans Rearrangement
I) 550 1,900
!
I II
II
I
I
I 11
TOTAL 1162.9225
6219050_
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Date G -
Commission r of Finance.
Form B.B. 12 1M 8-88 8
u
Taylor - Snelling to Pascal - both sides
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
Dist, No, 1
Mar. 24th. , 19_kQ__
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 196la.0 ,
approved March 22nd_ , 19-.6n_, relative to redonstructing
the sidewalk on both sides of Taylor Ave. from Snelling Ave. to Pascal Ste
and having investigated the matters and things referred to therein, hereby
reports:
1. The estimated cost thereof is $0.52 per sq. ft. for mpno. cone. walk u"
thick. Extra work(excay., fill, cone* remld, root cutting, drive crossings,ete.)
at extra cost.
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3. Initiated by the Commissioner of Public Works
4. Improvement is asked for upon petition
RECEIVED
MAR u0 1969
OWL CF
3NANV
U
�j
Commissioner of Publit Works