Loading...
1971821- ` Council File No. 197182 —By Adrian P. ORIGINAL TO CITY CLERK Winkel— 1 7- CITY OF ST. P whereas, In the matter of Comp- CIL NO. troller's Contract L -6092, for the Grad- _ O F_ F I C E O F THE C I T ing of the NORTHERN ROUTE from a point 450 feet E. of Lexington Park - CiOU Ci OLUTION— way to Griggs Street 'and Bridge Construction on Lexington Parkway over the Northern Route, designated COMMISSIONER BY SAT ^�tap�c M.Tiz' i COMMISSIONER DATE � WHEREAS, in the matter of Comptroller's Contract L -6092, for the Grading of the NORTHERN ROUTE from a point !� 0 feet E. of Lexington Parkway to Griggs Street and Bridge Construction on Lexington Parkway over the Northern Route, designated Bridge Number 7276 M.H.D., M. E. SOUTHER CON- STRUCTION COMPANY, Contractor, the specified date of com- pletion was May 15, 1960, and WHEREAS, the Contractor has prosecuted the work diligently, but due to the 1959 steel strike which continued for a period of 114 days, completion of the work was prevented within the time specified, therefore be it RESOLVED, that the proper City Officials be and they are hereby authorized and directed to execute an =) amendment to said contract extending the time of completion to SEPTEM- BER 21, 1960, provided, however, that this Resolution shall have no force or effect, unless the Sureties on the Contract- orls Bond consent thereto and file such consent in writing with the City Comptroller, and be it FURTHER RESOLVED, that the City of St. t'aul hereby waives all claim for liquidated damages and that - -no engineering and inspection charges on this pro jecte will be made by the City on account of such extended period. COUNCILMEN Adopted by the Council MAY 17 1960 19 Yeas Nays MAY 1719 &0 —B Holland Approved 19 Martinson n Favor Mayor Winkel A gainst Mr. President, Dillon 5M 7 -59 ogM,8 r• DUPLICATE TO PRINTER 1..91 CITY OF ST. PAUL FILE NO. OFFICE OF THE CITY CLERK COUNCIL RESOLUTION — GENERAL FORM PRESENTED BY COMMISSIONER DATE VdHEREAS, in the matter of Comptroller f s Contract L -6092# for the Grading of the NORTHERN ROUTE from a point 450 feet E. of Lexington Parkway to Griggs Street and Bridge Construction on Lexington Parkway over the Northern Route, designated Bridge Number 7276 M.H.D., M. E. SOUTHER CON - STRUCTION COMPANY, Contraetor, the specified date of com- pletion was May 15, 19600 and W EREAS$ the Contractor has prosecuted the work diligently, but due to the 1959 steel strike which continued for a period of 114 days, completion of the work was prevented within the time specified, therefore be it ' RESOLVED, that the proper City Officials be and they are hereby authorized and directed to execute ivaq amendment to said contract extending the time of completion to SEPTEM_ BER 21, 1960, provided, however, that thin Resolution shall have no force or effect, unless the Sureties on the Contract- or's Bond consent thereto and rile such consent in writing with the City Comptroller,. and be it FURTHER RESOLVED,, that the City of St caul hereby waives all claim for liquidated damages and that no engineering and insp3 ctioh charges on this projects will be made by the City on account of such extended period, MAY 17190 COUNCILMEN Adopted by the Council 19 Yeas Nays _DeGar�— MAY 17 19bC Holland Approved 19 Mortinson _Pe� _ Tn Favor Ro V Mayor Winkel Against Mr. President, Dillon 6M 7.69 e�8