Loading...
197335C ' Council File No. 197335— j < y lr In the matter of constructing a ) public sewer in Geranium Ave. from von Street to 220 feet west of Avon - _7335 Street; from Geranium Ave. to Rosey Ave. in an easement (to be obtained) in Avon Street (vacated) said easement (to be obtained) being on the east 20 ----------------------------- feet of the west 35 feet of Avon. Street (vacated) and said easement ato be ob- tained) extending Geranium Ave. um FIN O g from -��- In the Matter of constructing a public sewer in Geranium Ave. from Avon Street to 220 feet west of Avon Street; from Geranium Ave. to Rose Ave. in-.an easement (to be obtained) in Avon Street (vacated) said easement (to be obtained) being on the east 20 feet of the west 35 feet of Avon Street (vacated) and said easement (to be obtained) extending from Geranium Ave. to Rose Ave.; and from Rose Ave. tZ�\Maryland Ave. in an existing sewer easement in Avon Street (vacated) said easement being 20 feet in width along the center of Avon Street (vacated); all of which is t be known as the GERANIUM -AVON SEWER SYSTEM .. under Preliminary Order ---------- 1- 93�--------------- - - - - -- approved ------------ . August_ 18,. -- x-953------------------------- Intermediary Order approved - - - -- ---------------- - - - - -- "--------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is. to construct a public sewer in Geranium Ave. from Avon Street to 220 feet west of Avon Street; from Geranium Ave. to Rose Ave. in an easement (to be obtained) in Avon Street (vacated) said easement (to be obtained) being on the east 20 feet of the west 35 feet of Avon Street (vacated)and said easement (to be obtained) extending from Geranium Ave. to Rose Ave.; and from Rose Ave. to Maryland Ave. in an existing sewer easement in Avon Street (vacated) said easement being 20 feet in width along the center of Avon Street (vacated); all of which is to be known as the GERANIUM -AVON SEWER SYSTEM and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. Adopted by the Council ---------- MAY. 3 1 1960 -- - - - - -- Approved ---------- File 148+ MAY 311960 ---------------------- - - - - -- Councilman DeCOURCY Councilman HOLLAND Councilman MQR114150W Councilman PETERSON Councilman ROSEN Councilman WINKEL Mayorull__ i 4 2.55 2M 2 - - - - -- - - - -- City Clerk - . -------------- Mayor. CITY OF ST. PAUL _ a j r DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER 196973 3 (A) In the meter of constructing a public sewer in Geranium Ave. from Avon Street to 220 feet west of _ f Avon Street; from Geranium Ave. to Rose Ave. in an easement (to be obtained) in Avon Street (vacated) said easement (to be obtained) being on the east 20 feet of the west 35 feet of Avon _ Street (vacated) and said, easement (to be obtained) extending from Geranium Ave. to Rose Ave.; and from Rose Ave. to Maryland Ave. in an existing sewer easement in Avon Street (vacated) said _ easement being 20 feet in width along the center of Avon Street (vacated); all of which is to be known as the GERANIUM AVON SEWER SYSTEM, 1977 under Preliminary Order approved August 18, 1959 To the Council of the City of St. Paul: The Commissioner of Finance hereby reuorts as follows: i The total estimated cost of the above improvement is - - - - - - $ ? 45.53 Cityls Share 31 —E -1 $5,745.53 Assessment $4,900.00 7.00 The estimated assessment per foot for the above improvement is - - - - $ The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the • Assessor, are as follows: II DESCRIPTION I LOT BLOCKI ADDITION II VALUATION LAND BLDG. III That part of Tnt 19 l,,d rg Nt ly of a I I I II I I 75 ,ft". Nf ly from and parallel 1111ne to the center line of N P Ry. as I I I II Illocated over and across said 112 I (Lake Como Villas II$ 2,950 $ 81200 I II I 1 I 7 Lmn Park, 'fir, rAddition II 8WK � II to sewer easement over the II:1W. 10 ft. F -' of Avon St. vac. ad j. and he 3l aw ny Sub-i. to Mary I land Ave.; W of Lot 14, and the iA of Lots 115 thru I I I An II E,7�R nnn I to sewer easement I I I l I I lE. 10 ft.; Wf of Avon St. vac. adj. and I I I Lallrafffs raw Plane", II I LIM, 62 Form B. B. 10 1M 8 -68 Il � � i v c St. Paul, Minn. - -Ae? - - �ye- -------- 19 � To The Honorable, The Council, City of St. Paul, Minn. 19 ,?6 2�j Gentlemen: iii We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: ------ - - - - -- -------------------------------------------------------------- - ---------------- - - - - -- • -- - - - - -- /LL.9S ON /ri/r? TO sE.Py - - - - -L 07' ----------------------- I -------------------------------------- �ol- .i. from--------------------------------------------------------------- - - -St. Ave. to------------------------------------------------------------ - - - - -- ------------------------------------------------------ - - -St. Ave. NAME LOT BLOCK ADDITION / / C��o • u7- C�usT %�, 409 &l'' B h . D 6M 6 -66 cQP0-2 rf �JA CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER' In the matter of constructing a public sewer in Geranium Ave. from Avon Street to 220 feet west of Avon Street; from Geranium Ave. to Rose Ave. in an easement (to be obtained) in Avon Street (vacated) said easement (to be obtained) being on the east 20 feet of the west 35 feet of Avon Street (vacated) and said easement (to be obtained) extending from Geranium Ave. to Rose Ave.; and from Rose Ave. to Maryland Ave. in an existing sewer easement in Avon Street (vacated) said easement being 20 feet in width along the center of Avon Street (vacated); all of which is to be known as the GERANIUM -AVON SEWER SYSTEM, under Preliminary Order approved August 18, 3.959 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated cost of the above improvement is - - - - - - $1046-53 Cityts Share 31 -E -1 $5,745.53 Assessment $4,900.00 The estimated assessment per foot for the above improvement is - - - - $ 7.00 The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the . Assessor, are as follows: Form B. B. 10 1M 8 -58 °®°8 . i IIDESCRIPTION I LOT IBLOCKI ADDITION I LAND VALUATION BLDG. II That part of Lot 12 lying N1 ]s of a I I I II IIline 75 ,ft'. Nt ly from and parallel to the center line of N.P. Ry, an I I I II Illocated over and across said 112 I ILake Como Villas II$ 2,950 $ 81200 II I 1 I 7 Lynn II llSubj. to sewer easement over the I W. 10 ft.; E,12 of Avon St. vac. adj.I and the fo2131in : Subj. to Mary- land Ave.; A of Lot 14, and the ,A of Lots 1 thru 118 I l� I do II A75 8 _ I to sewer easement over I I I l 'I lE. 10 ft.; W of Avon St. vac. adj.I and allrafffs Coma Plane"- II I 625 61750 Form B. B. 10 1M 8 -58 °®°8 . i CITY OF ST. PAUL . r ' DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER IIDESCRIPTION I LOT IBLOCKI ADDITION II LAND VALUATION BLDG. Vac. Sts., alley & Lots 3, h & 5, T osseafs tab.; Lots 5 thru 13, Blk. 1 !I Lots 8 thru 21, Blk. 2, Como Additi and 19 thru 26, Blk. 4, Como Park 3H n; A ock ditUn 2, 33 51 6 and Lots 1 thru-4 and in sd. Garden Lots, ex. II !!E. 132 ft.; Sj of Lot 2, Block 1, e 180 ft. tracts S of Maryland Ave.; . E.I1801ft.; he ol: Blk. 4 and ex. 166 to Lots L and 5, Blk. 1, B7k. 2 & II adj. pt. of NE4 of Sec. 26 & all of1Blk.1 3, bale Street Garden Lots 121,000 $881,900 !► I I I II !► I I I II II I I I II I! I I I II II I I I II II I I I II ►! I I I � II I I I II II I I I 11 !I I I II ! TOTAL 71126.12q 990E 850 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Date d 9 6 0 %1'1zo . %i . A" Commissioner of Finance. Form B.B. 12 1M 3 -58 �.8 L y OFFICE OF THE COMMISSIONER OF PUBLIC WORKS A r c• REPORT TO COMMISSIONER OF FINANCE March 18th 0 19-LO- To the Commissioner of Finance of the City of Saint Paul: The Commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 193629 approved August 18th 19 59 , relative to Cora t c �..pu n.i u6L.Ave,., lr_.om: Avon Uree:t —t-o.- 220-- feet< =- wes:t --�of Avon Street; from. Geranium Ave. to'•Rose:Ave. in an easement.•(to be obtained) in "Avon S ree ( yaca�; s�aigase�en,,( ts��be�ob. ai; ned )_.��.e.i.ng�.on�tthe.�eas #:.20 feed �f _ __ Lhe iipc4t. 35-feet 6f- _A:V*bh -Sl rixt ( cela 3 i4 t: l=nt (t6 h -t - AtainzA) cAt :rid- 4? dEVVHCnWo*AOK 8El`11eK A� FW'ii , x. on! fr °- Rose ?ivb to l4- .r..l���! Svc r�• ;� ►sa; � �� ova: �fil�s :ce��:s�:l<olst/� °��2�1"�~��t Hs�;a�s_Q ��jj' g �f.: °�atz��°� '•� �4�•ps��K��� {yy�n and having investigated the matters and things referred to therein, hereby reports: 1. Said improvement is necessary and (or) desirable. 2. The estimated cost thereof is $ 10,645.53 , and the total cost (See Letter Attached) thereof is $ and the nature and extent of said improvement is as follows: 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 4. r t f --,q, r -od improvement is asked for upon petition of three roperty, subject to assessment for said improvement. VA. GEORGE M. SHEPARD Street & Highway Engineering Coordinator CITY OF SAINT PAUL Capital of Minnesota DEPARTMENT OF PUBLIC WORKS ADRIAN P. WINKEL, Commissioner CLIFTON G. HOLMGREN, Deputy Commissioner 234 City Hall & Court House March 18, 1960 Hon. Adrian P. Winkel Commissioner of Public Works City of Saint Paul Dear Sir: 1 transmit herewith preliminary estimate of cost for the construction of the GERANIUM-AVON SEWER SYSTEM, under Preliminary Order C. F. 193629, approved August 18, 1959. Estimated Total Cost $10,645.53 Engineering & Inspection 967.78 Assessment 4,900.00 City Share 31 E -1 5,745.53 Cost per front foot 7.00 Frontage 700 ft. Yours very truly, - �h�.GWheeler Asst. Chief Engineer Approved for transmission to the Commissioner of Finance Adrian inke / �� 12 Commissioner of Publi i'q 01 EUGENE V. AVERY Chief Engineer 1111i" ' • .J To The Honorable, The Council, City of St. Paul, Minn. Gentlemen: V L St. Paul, Minn.-- -ie -� ------ d- ..... _19 7 1%629 We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: /� 1 IOOi✓ °ST i�0/)'J A1`/ 9PVL-/9!i11D - -- - -------------------------------------------------- - - - - -- ----- - - - - -- • -- - - - - -- /LLi9S ------ O - ,SE,P--- �- - - - - -L o--- -- �� , - -- Rio- __J- -_.� - , from--------------------------------------------------------------- - - -St. Ave. to------------------------------------------------------------ - - - - -- -St. Ave. NAME LOT BLOCK ADDITION // / C��o • �v7 CsT �� LA,��' Como 13Y 464 M4'(��Jf . 104e 6M 6 -66 op 1 �\