197335C '
Council File No. 197335— j <
y lr In the matter of constructing a )
public sewer in Geranium Ave. from
von Street to 220 feet west of Avon - _7335
Street; from Geranium Ave. to Rosey
Ave. in an easement (to be obtained)
in Avon Street (vacated) said easement
(to be obtained) being on the east 20 -----------------------------
feet of the west 35 feet of Avon. Street
(vacated) and said easement ato be ob-
tained) extending Geranium Ave. um
FIN O g from -��-
In the Matter of constructing a public sewer in Geranium Ave. from Avon Street to
220 feet west of Avon Street; from Geranium Ave. to Rose Ave. in-.an easement (to be
obtained) in Avon Street (vacated) said easement (to be obtained) being on the east
20 feet of the west 35 feet of Avon Street (vacated) and said easement (to be obtained)
extending from Geranium Ave. to Rose Ave.; and from Rose Ave. tZ�\Maryland Ave. in an
existing sewer easement in Avon Street (vacated) said easement being 20 feet in width
along the center of Avon Street (vacated); all of which is t be known as the
GERANIUM -AVON SEWER SYSTEM ..
under Preliminary Order ---------- 1- 93�--------------- - - - - -- approved ------------ . August_ 18,. -- x-953-------------------------
Intermediary Order approved - - - -- ---------------- - - - - -- "---------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is. to construct a public sewer in Geranium Ave. from
Avon Street to 220 feet west of Avon Street; from Geranium Ave. to Rose Ave. in an
easement (to be obtained) in Avon Street (vacated) said easement (to be obtained)
being on the east 20 feet of the west 35 feet of Avon Street (vacated)and said easement
(to be obtained) extending from Geranium Ave. to Rose Ave.; and from Rose Ave. to
Maryland Ave. in an existing sewer easement in Avon Street (vacated) said easement
being 20 feet in width along the center of Avon Street (vacated); all of which is
to be known as the GERANIUM -AVON SEWER SYSTEM
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council ---------- MAY. 3 1 1960
-- - - - - --
Approved ----------
File 148+
MAY 311960
---------------------- - - - - --
Councilman DeCOURCY
Councilman HOLLAND
Councilman MQR114150W
Councilman PETERSON
Councilman ROSEN
Councilman WINKEL
Mayorull__ i 4
2.55 2M 2
- - - - -- - - - --
City Clerk - .
--------------
Mayor.
CITY OF ST. PAUL _ a
j r DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER 196973
3
(A)
In the meter of constructing a public sewer in Geranium Ave. from Avon Street to 220 feet west of _
f Avon Street; from Geranium Ave. to Rose Ave. in an easement (to be obtained) in Avon Street
(vacated) said easement (to be obtained) being on the east 20 feet of the west 35 feet of Avon _
Street (vacated) and said, easement (to be obtained) extending from Geranium Ave. to Rose Ave.;
and from Rose Ave. to Maryland Ave. in an existing sewer easement in Avon Street (vacated) said _
easement being 20 feet in width along the center of Avon Street (vacated); all of which is to
be known as the GERANIUM AVON SEWER SYSTEM,
1977
under Preliminary Order approved August 18, 1959
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reuorts as follows:
i
The total estimated cost of the above improvement is - - - - - - $ ? 45.53
Cityls Share 31 —E -1 $5,745.53 Assessment $4,900.00 7.00
The estimated assessment per foot for the above improvement is - - - - $
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the • Assessor, are as follows:
II DESCRIPTION
I LOT
BLOCKI
ADDITION II
VALUATION
LAND BLDG.
III
That part of Tnt 19 l,,d rg Nt ly of a I
I I
II
I
I
75 ,ft". Nf ly from and parallel
1111ne to the center line of N P Ry. as I
I I
II
Illocated over and across said
112
I
(Lake Como Villas
II$ 2,950 $ 81200
I
II
I 1
I 7
Lmn Park, 'fir, rAddition
II 8WK �
II
to sewer easement over the
II:1W.
10 ft. F -' of Avon St. vac. ad j.
and he 3l aw ny Sub-i. to Mary
I
land Ave.; W of Lot 14, and the
iA of Lots 115 thru
I
I
I An
II E,7�R nnn
I to sewer easement
I
I
I
l I
I
lE. 10 ft.; Wf of Avon St. vac. adj.
and
I I
I
Lallrafffs raw Plane",
II
I
LIM,
62
Form B. B. 10 1M 8 -68
Il � �
i
v c
St. Paul, Minn. - -Ae? - - �ye- -------- 19
�
To The Honorable, The Council,
City of St. Paul, Minn. 19
,?6 2�j
Gentlemen:
iii
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
------ - - - - -- -------------------------------------------------------------- - ---------------- - - - - -- • -- - - - - --
/LL.9S
ON /ri/r? TO sE.Py - - - - -L 07' ----------------------- I -------------------------------------- �ol- .i.
from--------------------------------------------------------------- - - -St. Ave. to------------------------------------------------------------ - - - - --
------------------------------------------------------ - - -St. Ave.
NAME
LOT
BLOCK
ADDITION
/ /
C��o • u7- C�usT
%�,
409 &l''
B
h
.
D
6M 6 -66 cQP0-2
rf
�JA
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER'
In the matter of constructing a public sewer in Geranium Ave. from Avon Street to 220 feet west of
Avon Street; from Geranium Ave. to Rose Ave. in an easement (to be obtained) in Avon Street
(vacated) said easement (to be obtained) being on the east 20 feet of the west 35 feet of Avon
Street (vacated) and said easement (to be obtained) extending from Geranium Ave. to Rose Ave.;
and from Rose Ave. to Maryland Ave. in an existing sewer easement in Avon Street (vacated) said
easement being 20 feet in width along the center of Avon Street (vacated); all of which is to
be known as the GERANIUM -AVON SEWER SYSTEM,
under Preliminary Order approved August 18, 3.959
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $1046-53
Cityts Share 31 -E -1 $5,745.53 Assessment $4,900.00
The estimated assessment per foot for the above improvement is - - - - $ 7.00
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the . Assessor, are as follows:
Form B. B. 10 1M 8 -58 °®°8
. i
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION
I LAND VALUATION BLDG.
II That part of Lot 12 lying N1 ]s of a
I
I
I
II
IIline 75 ,ft'. Nt ly from and parallel
to the center line of N.P. Ry, an
I
I
I
II
Illocated over and across said
112
I
ILake Como Villas
II$ 2,950 $ 81200
II
I 1
I 7
Lynn
II
llSubj.
to sewer easement over the
I
W. 10 ft.; E,12 of Avon St. vac. adj.I
and the fo2131in : Subj. to Mary-
land Ave.; A of Lot 14, and the
,A of Lots 1 thru
118
I l�
I do
II A75 8 _
I to sewer easement over
I
I
I
l
'I
lE. 10 ft.; W of Avon St. vac. adj.I
and
allrafffs Coma Plane"-
II I
625 61750
Form B. B. 10 1M 8 -58 °®°8
. i
CITY OF ST. PAUL .
r ' DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
IIDESCRIPTION
I
LOT IBLOCKI
ADDITION II
LAND VALUATION BLDG.
Vac. Sts., alley & Lots 3, h & 5, T
osseafs
tab.; Lots 5 thru 13, Blk. 1 !I
Lots 8 thru 21, Blk. 2, Como Additi
and 19 thru 26, Blk. 4, Como Park 3H
n;
A
ock
ditUn
2, 33 51 6 and Lots 1 thru-4
and in sd. Garden Lots, ex. II
!!E.
132 ft.; Sj of Lot 2, Block 1, e
180 ft. tracts S of Maryland Ave.;
. E.I1801ft.;
he
ol:
Blk. 4 and ex. 166 to
Lots L and 5, Blk. 1, B7k. 2 &
II
adj. pt. of NE4 of Sec. 26 & all of1Blk.1
3,
bale Street Garden Lots
121,000 $881,900
!►
I
I
I
II
!►
I
I
I
II
II
I
I
I
II
I!
I
I
I
II
II
I
I
I
II
II
I
I
I
II
►!
I
I
I
�
II
I
I
I II
II
I
I
I 11
!I
I
I II
!
TOTAL
71126.12q 990E 850
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Date d 9 6 0 %1'1zo . %i . A"
Commissioner of Finance.
Form B.B. 12 1M 3 -58 �.8
L y OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
A
r
c•
REPORT TO COMMISSIONER OF FINANCE
March 18th 0 19-LO-
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration
the preliminary order of the Council, known as Council File No. 193629
approved August 18th 19 59 , relative to
Cora t c �..pu n.i u6L.Ave,., lr_.om: Avon Uree:t —t-o.- 220-- feet< =- wes:t --�of
Avon Street; from. Geranium Ave. to'•Rose:Ave. in an easement.•(to be obtained) in
"Avon S ree ( yaca�; s�aigase�en,,( ts��be�ob. ai; ned )_.��.e.i.ng�.on�tthe.�eas #:.20 feed �f _ __
Lhe iipc4t. 35-feet 6f- _A:V*bh -Sl rixt ( cela 3 i4 t: l=nt (t6 h -t - AtainzA) cAt :rid-
4? dEVVHCnWo*AOK 8El`11eK A� FW'ii , x. on! fr °- Rose ?ivb to l4- .r..l���! Svc r�• ;�
►sa; � �� ova: �fil�s :ce��:s�:l<olst/� °��2�1"�~��t Hs�;a�s_Q ��jj' g �f.: °�atz��°� '•� �4�•ps��K��� {yy�n
and having investigated the matters and things referred to therein, hereby
reports:
1. Said improvement is
necessary and (or) desirable.
2. The estimated cost thereof is $ 10,645.53 , and the total cost
(See Letter Attached)
thereof is $ and the nature and extent of said improvement
is as follows:
3. A plan, profile or sketch of said improvement is hereto attached
and made a part hereof.
4.
r t f --,q, r
-od
improvement is asked for upon petition of three
roperty, subject to assessment for said improvement.
VA.
GEORGE M. SHEPARD
Street & Highway Engineering Coordinator
CITY OF SAINT PAUL
Capital of Minnesota
DEPARTMENT OF PUBLIC WORKS
ADRIAN P. WINKEL, Commissioner
CLIFTON G. HOLMGREN, Deputy Commissioner
234 City Hall & Court House
March 18, 1960
Hon. Adrian P. Winkel
Commissioner of Public Works
City of Saint Paul
Dear Sir:
1 transmit herewith preliminary estimate of cost for the
construction of the GERANIUM-AVON SEWER SYSTEM, under Preliminary
Order C. F. 193629, approved August 18, 1959.
Estimated Total Cost $10,645.53
Engineering & Inspection 967.78
Assessment 4,900.00
City Share 31 E -1 5,745.53
Cost per front foot 7.00
Frontage 700 ft.
Yours very truly,
- �h�.GWheeler
Asst. Chief Engineer
Approved for transmission to
the Commissioner of Finance
Adrian inke /
�� 12
Commissioner of Publi
i'q
01
EUGENE V. AVERY
Chief Engineer
1111i"
' • .J
To The Honorable, The Council,
City of St. Paul, Minn.
Gentlemen:
V L
St. Paul, Minn.-- -ie -� ------ d-
..... _19 7
1%629
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made: /�
1 IOOi✓ °ST i�0/)'J A1`/ 9PVL-/9!i11D
- -- - -------------------------------------------------- - - - - -- ----- - - - - -- • -- - - - - --
/LLi9S
------ O - ,SE,P--- �- - - - - -L o--- -- �� , - -- Rio- __J- -_.� - ,
from--------------------------------------------------------------- - - -St. Ave. to------------------------------------------------------------ - - - - --
-St. Ave.
NAME
LOT
BLOCK
ADDITION
// /
C��o • �v7 CsT
��
LA,��' Como
13Y 464 M4'(��Jf . 104e
6M 6 -66 op
1 �\