195848` 1.95848
COUNCIL FILE N0._ -__________ ---------
By___________ _
Council File No. 195848-
, FINAL ORDER In the Matter of reconstructing the
sirlewalit_nntih!iib,�tid?r of Ch?lcea St.
i
In the Matter of reconstructing the sidewalk on both sides of Chelsea St.
from Idaho Ave. to Arlington Ave.
under Preliminary Order --------------- 9.4472 ----------------- approved ---- - - - - -- ------------------- - - - - --
Intermediary Order -----------------
------- - - - - -- =----------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to reconstruct the sidewalk on both sides of
Chelsea St. from Idaho Ave. to Arlington Ave., except where good and sufficient
sidewalks now exist
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council ------------------ �E� 1 -- 196®
- -9 ..
TEE 16 9960 - - -- -- = - - -- - - -- -------------------- - - - - - City - ty __ Cllee -
rk.
Approved----------------------------------------- - - - - --
File S6210
Councilman
6C-0 """
Councilman
HOLLAND
Councilman,.
MORTINSON
Councilman '
,
'P�f��
Councilman
f2OSEN
Councilman
Mayor- '- ,- `"_`O!
Wi Vice PresiJ,,nr (p.�ersoft)
2.55 2M 2
76
--------------- -
Acting Mayor.
h
CITY OF ST. PAUL
., DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(A)
In the matter of Peconstructing the sidewalk on both sides of Chelsea St. from Idaho Ave. to
Arlington Ave.,
5 8 -19
under Preliminary Order approved Deceir>ber 3, 1959
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $_0_.50 per sq . ft. for
411 Mono. Conc. walk.
The estimated assessment per foot for the above improvement is - - - - $ Extra work at z-txa
cost.
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION
I LAND VALUATION BLDG.
II
1 11
5
1 Chelsea Heights
IS 550 A h.,350
I!
1 2!
5
1 do
11 500 3 550
!I
! 31
5
1 do
III 500 30900
it
I L
1 5
1 do
II 500 3.,100
5
I do
II 500 3,100
II
1 61
5
1 do
II 500 23200
1 71
5
1 do
II 500 3,300
III
$15
1 do
11 500 3,200
II
! -191
5
1 do
500 4,350
Il
1 101
!
do
500 450
Fgrm B. B. 10 IM 8 -58 8
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)
IIDESCRIPTION
I LOT
I BLOCKI
ADDITION II
LAND BLDG.
1�
1 111
5
lChelsea Hei hts
11
11
1121
51
do
11 Knn
11
1 13
K
1 do
11 K00 2, Inn
1I
1 i 1.1
K
1 d r)
11 50n (,nn
11
1 1.
I 5
1 �n
11 550
II
-II
1161
(�
1 ran
it )1,95o
171
1
1 6
1n
,r,,rn
� 500 2, 75o
11
1 18'
1 6
1 d o
500 L l 50
II
',xnent triangular past measuring
-
0
1190.66
ft. more or less on north
1
1
1
11
Line on east line;
0
1 0
11
1
1
1
11 '
11
1
1
11
linorth
line and 3 ft, on east line
1
1
11
1I
and all of
1 201
6
1 do 11
500 3,750
iExce-ot north 5 ft.; the south a of
1
1
1 11
ilLot
22 and all of
1 211
6
1 do
700 5,000
11
North ; of Lot 22, north 5 ft. of
1
1
1 Ii
south a of Lot 22 and south 4 of
1 231
6
do 11
550 4,400
iiNorth
; of Lot 23 and south 1 of
1 24
1 6
1 do 11
500 4,500
11
North of Lot 24 and south of 1
251
6
1 do 11
500 4,150
_
korth a of Lot 25 and all of 1
261
6
1 do
750 4,•150
11
1
271
61
do II
500 2,450
11
1
281
6 1
do 11
00 3,900
,1
1291
6 1
do 11
500 4,800
11
1
301
6 1
do 11
550 4,45o
II
1
TOTAL
1
IOIIM N.B.11 500 3-38 8
t
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION II
LAND VALUATION BLDG.
I!
1 20
I 91
Chel sea Hpights
II
!!
111
91
do
_
11 b5c) 1, 15c)
1 22
91
do
11 500 3}750
__ lI
1 23
91
do
11 500 1,000
II
_Lot 2h and north a of
1 251
9
1 do
II 750 h.,lao
llSouth
1 of Lot 25 and all of
1 261
9
1 do
II 750 2,900
_lI
1 271
91
do
fl 500 3,100
Il1
281
91
do
500 1,950
_ll
1 291
9
do
II 00 2,600
11
Lot 30 and north 10 ft. of
1 11
91
do
11 625 6,200
II
Except north 10 ft . ; Lot 31 and
1
I
I
11
north 30 ft. of
1 321
91
do
11 750 5,000
IlSouth 10 ft. of Lot 32 and all of
1 331
91
do
II 625 4,350
II
1341
91
do
II 475 4,550
it
North 2 ft. of Lot 36 and all of
1 351
91
do
11 500 4,850
11
North 10 ft. of Lot 27 and except
I
I
I
II
11
north 2 ft.;
1 361
91
do
II 525 4,250
II
Except north 10 ft.; Lot 37 and
I
I
I
l
except south 10 ft;
1 381
9
1 do
Il 675 6,600
Il
South 10 ft. of Lot 38 and all of
1 391
9
1 do 11
575 6,900
itNorth
1Q ft. of Lots 41, 42, 43 1
1
1 Il
Il
and all of
1 401
9 1
do
500 4,95o
NExcept
north 10 ft.; Lots 41, 42 4
431
9 1
do
� 750 3,850
11
1
11
101
do lI
550 5,400
11
1
21
10 1
do Il
500 650
11
1
31
10 1
do lI
500 4,850
11
1
TOTAL
1
►0114 3.0.11 sw ] -IS 8
CITY OF ST. PAUL
V DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
IIDESCRIPTION
I LOT
(BLOCK
ADDITION II
LAND VALUATION BLDG.
II
1 41
101
Chelsea Heights
118 500 9650
II
1 51
10
1 do
II Knn 2, 8np_
II
1 61
10
1 do
II i�nn
!!
1 71
10
1 do
r55n
II �on�5n
11
I 8
101
do
lI Knn 11�7Kn
II
1 91
101
do
;I Knn )1,05 n
.1
1 101
10
1 do
II Knn )1, 0n
I
II
11
110
1 do
500 3,900
II
1 121
10
1 do
Il 500 L, i 50
II
1 131
10
1 do
II 500
II
_
1 141
10
1 do
500 4,5oo
II
1 151
10
do
II 550 4,55o
Il
1 11
131
do
Il 55o 5,850
II
1 21
13-,!
do
II 500 3,700
II
1 31
13
1 do
II 500 4,650
1.
1 41
13
1 do
Il 500 4,55o
II
1 51
13
1 do
II 500 5,100
II
1 61
13
1 do
350 150
!I
1 71
13
1 do
11 350 850p
ilLots
8, 9, Block 13, except beginniL
I
I
11
IIat
a point on northwesterly line ofl
I I
I1
IIalley
138.1 ft. southwesterly of
I
1
11
the northeast corner of Lot 9, 1
1 1
IIBlk.
13, thence on a curve to the 1
I
1
11
!!right
central angle 53 degrees 1
I I
II
11radius
9.97 ft . , 22.1 ft. to a poi4
I
I
II
Il(Continued
on next
�ge
TOTAL II
Fromm ■. ■.11 Soo 3-59 8
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
IIDESCRIPTION
I LOT (BLOCK
ADDITION II
LAND VALUATION BLDG.
Continued from pr.ecedin
nn east ine of alley 74, 0 ft. I
pag
I 11
!!
south of ngXthvest corner of said
I
I
I 11
II
lot; thence south on said line 20
I
I
I
II
!!
ft. to intersection of alleys,
I
I
I II
!I
thence northeasterly on the north -1
I
I II
11
west line of alley 20 ft. to point
I
I
I
11
of beginning
1
1 131
Chelsea Heights
700 $ 350
11
Lois I n and l l_ Rl nr-k 13, and all ir
I
I
!�
I
I
I II
ji
and all that part of the vacated
I
I II
!�l,Pjr
-adjoj33j33g Tnt In as ligG
11
S�llth Of a line running -F orn nnr-th
I
I
I
11
of T.n-t 10 +.a intgrSgrt.inn n
I
I
II
IIay+PnHPr1
snnthT,rPGtgrly ling of
I
I
I 11
11
Lot 10 with snuth line of
I 91
11
I do II
750 6A250
II
I
I
I II
I
I
I II
II
I
I
I - 11
II
1
TOTAL 11938.500
8256,85o
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works. {�
Date 9se ° - �✓
Commissioner of Financl ---
Form B.B. 12 1M 3-68 8
Y " .Chelsea - Idaho to Arlington - both sides
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
Dist. No. 1
Dec. 8 , 1912,___,
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 194872 ,
approved Dec. 3 , 19_52_, relative to the recon-
struction of the sidewalk on both sides of Chelsea St. from Idaho Ave. to
Arlington Ave.
4
and having investigated the matters and things referred to therein, hereby
reports:
1. The estimated cost thereof is $0.50 per sq. ft. for mgno. conc. walk
4" thick. Extra work(Excay., fill„ conc. rem'd, root cutting, drive crossinas,etc.)
at extra cost.
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3. Initiated by the Commissioner of Public Works X
4. Improvement is asked for upon petition -�
12:
1
Commissioner of Public Works
� w
a 1
K
r
Y " .Chelsea - Idaho to Arlington - both sides
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
Dist. No. 1
Dec. 8 , 1912,___,
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 194872 ,
approved Dec. 3 , 19_52_, relative to the recon-
struction of the sidewalk on both sides of Chelsea St. from Idaho Ave. to
Arlington Ave.
4
and having investigated the matters and things referred to therein, hereby
reports:
1. The estimated cost thereof is $0.50 per sq. ft. for mgno. conc. walk
4" thick. Extra work(Excay., fill„ conc. rem'd, root cutting, drive crossinas,etc.)
at extra cost.
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3. Initiated by the Commissioner of Public Works X
4. Improvement is asked for upon petition -�
12:
1
Commissioner of Public Works
� w
a 1