r FINAL ORDER
i
In the Matter of grading and surfacing with bituminous material the alley in Block 31
Berland Addition No. 1, and Block 1, Angelene Addition from Pacific Street to McLean
Ave. Also construct a storm sewer in the alley from a point 130 ft. north of McLean
Ave. to the existing sewer in McLean Ave. FINAL ORDER
/ Council File No. 199736 —
In the matter of grading and sur-
facing with bituminous material the
alley in Block 3, Berland Addition No.
d, iwi. al,),Ir I _ A� relel n.dfl �'firr fm-^
1 $ 6 Set 16 1960 '-
under Preliminary Order 9 9 approved P --' - -- - ' - -- ----------------------- -acc - - - --
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is. to grade and surface with bituminous material the
alley in Block.3, Berland Addiition No. 1, and Block 1, Angelene Addition from Pacific
St. to McLean Ave. Also construct a storm sewer in the alley from a point 130 ft..
north of McLean Ave. to the existing sewer in McLean Ave.
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council---- - - - - -- NOV -- 2 1960
NOV 2 2 1960
Approved----- - - - - -- ------------------ - - - - --
File 15075
Councilman
DeCourcy
Councilman
Holland
Councilman
Loss
Councilman
Mortinson
y"
�:- Councilman
Pe?e�'son
Councilman
Rosen
Mayor
Vavoulis
�y
0
2.55 2M 2 "SP" ��
----V' - -- — ------------------- - - - - -- -----------------
City Clerk.
Mayor.
CITY OF 6T. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
In the matter of grading and surfacing with bituminous material the alley in Block 3, Berland Add.
No. 1,` and Block 1, Angelene Addition from Pacific Street to McLean Avenue. Also c onstruct
a storm sewer in the alley from a point 130 ft. north of McLean Avenue to the existing sewer
in McLean Avenue.
under Preliminary Order approved September 16, 1960
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
19942-
The total estimated ammhef the assessment for the above improvement is - - $ 3.652.00
The estimated cost pe /foot for the above improvement is - - - - - - - $ 8.91
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or
parcel as last reported by the Assessor, are as follows:
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and
hereby submits the foregoing as his report thereon to the Council, together with the report made to him in
reference to said matter by the Commissioner of Public Works.
Dated S 19�_ z
Commissioner bf Finance--
Form B. S. A. 8 -5 D
DESCRIPTION
LOT
BLOCK
ADDITION
ASSESSED
lsrypLUATM
Subject to easement
1
3
Berland Addition No. 1
43�� $5500
2
3
" .
325 :3750 ,
3
3
"
i
32� _3500 ,
4
3
"
325 3500
5
3
325 , 3500
6
3
"
325 3500
7
3
"
375 ; 3500.
Lots 8 and 9
1
Angeline Addition
1100 ,
i
� t
TOTAL
$2,725• : $24.,7500
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and
hereby submits the foregoing as his report thereon to the Council, together with the report made to him in
reference to said matter by the Commissioner of Public Works.
Dated S 19�_ z
Commissioner bf Finance--
Form B. S. A. 8 -5 D
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
0
September 26 19 60
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 198967 ,
approved September 16th 9 .19 60 , relative to grade and surface with
bituminous material the alley in Block 3, Berland Add. No. 1, and Block 1, Angeline Add.
from Pacific Street to McLean Ave. Also construct a storm sewer in the alley from a
point 130 ft. north of McLean Ave. to the existing sewer in McLean Ave.
and having investigated the matters and things referred to therein, hereby
reports:
1. The estimated cost thereof is $ 3,652.00 (See Letter Attached)
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3•
4.
Initiated by the Commissioner of Public Works
Improvement is asked for upon petition X
Commissioner of Public Works
:F
k
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
0
September 26 19 60
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 198967 ,
approved September 16th 9 .19 60 , relative to grade and surface with
bituminous material the alley in Block 3, Berland Add. No. 1, and Block 1, Angeline Add.
from Pacific Street to McLean Ave. Also construct a storm sewer in the alley from a
point 130 ft. north of McLean Ave. to the existing sewer in McLean Ave.
and having investigated the matters and things referred to therein, hereby
reports:
1. The estimated cost thereof is $ 3,652.00 (See Letter Attached)
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3•
4.
Initiated by the Commissioner of Public Works
Improvement is asked for upon petition X
Commissioner of Public Works
:F
z C I TY�"`O F1
R
GEOGE M. SHEPARD
STREET AND HIGHWAY
ENG INEER ING_ COORDINATOR 1
,Capit
DEPARTMENT
234 City H
S Al N T rRAMI% CHIEF
I- of innesota M .1
;OF PUBLIC_W_KS = = ° w s° R
OR
311-&- CC- House-12)w ■ ■ ■ " � ".
E V. AVERY a
ENGINEER •-
;OTTER
NTENDENT OF SANITATION r+
-
... Jar
OWN ROSE`N,;,, ai ini � ili lot +�, M
cmmissioner" ;,fl
AM'P:°BEHRENS
�ty Commissioner��r.�^ l 1 t t
September 26, 1960
Hon. Milton Rosen
Commissioner of Public Works
City of Saint Paul
Dear Sir:
I transmit herewith preliminary estimate of cost for grading
and surfacing with bituminous material the alley in Block 3, Berland
Addition No. 1, and Block 1, Angeline Addition from Pacific Street
to McLean Avenue. Also construct a storm sewer in the alley from a
point 130 feet north of McLean Avenue to the existing sewer in
McLean Avenue, under Preliminary Order C. F. 198967, approved
September 16, 1960.
Total Estimated Cost
Engineering
Inspection
Cost per front foot
Frontage
Approved for tppnsmission to
Wte7`7Z.- of Finance
ilton Rosen
Commissioner of Public Works
Yo very truly,
Eugene V. Avery
Chief Engineer
$3,652.00
265.60
66.40
8.91
410 ft.
Y sfi �q *�(
�.fi: j`2
To • The Ho � norable, The Council, St. Paul, Minn.- �� ..... °�- Z.............. 19 - -�0
•
' City of St. Paul, Minn.
i
Gentlemen:
We, the undersigned property owners, hereby petition your Honorable Body to cause
the following improvement to be made:
Alley_ Grad ng -- and_- Surfaoing -- • --------------- - - - - -- -- - - - - --
Hazelwood - Barcla----------------------- fcMcLean ------------------------------------------------------------------------------------ St. Ave.
----- -------- -- ---- ------ - - - - --
S +— Ava—to _ ------------------------ - -_ - -- ------------------------------
)CK ADDITION
' G
a2A_
c �
CR
196'0
UQ
6M 6 -66 2
>1
(4
ZW C 4 1,74
O
Q
N
h,
I
IV4
•17.-
,B / ?M I N C7-
77
O
AWRCZ A
Al
WOOO'
L-,- --J
Q
N
h,
I