Loading...
199736L � COUNCIL FILE NO ----- jLs:!------------ L By---------------------------------------------------------------- r FINAL ORDER i In the Matter of grading and surfacing with bituminous material the alley in Block 31 Berland Addition No. 1, and Block 1, Angelene Addition from Pacific Street to McLean Ave. Also construct a storm sewer in the alley from a point 130 ft. north of McLean Ave. to the existing sewer in McLean Ave. FINAL ORDER / Council File No. 199736 — In the matter of grading and sur- facing with bituminous material the alley in Block 3, Berland Addition No. d, iwi. al,),Ir I _ A� relel n.dfl �'firr fm-^ 1 $ 6 Set 16 1960 '- under Preliminary Order 9 9 approved P --' - -- - ' - -- ----------------------- -acc - - - -- IntermediaryOrder ---------------------------------------------- - - - - -- approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is. to grade and surface with bituminous material the alley in Block.3, Berland Addiition No. 1, and Block 1, Angelene Addition from Pacific St. to McLean Ave. Also construct a storm sewer in the alley from a point 130 ft.. north of McLean Ave. to the existing sewer in McLean Ave. and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. Adopted by the Council---- - - - - -- NOV -- 2 1960 NOV 2 2 1960 Approved----- - - - - -- ------------------ - - - - -- File 15075 Councilman DeCourcy Councilman Holland Councilman Loss Councilman Mortinson y" �:- Councilman Pe?e�'son Councilman Rosen Mayor Vavoulis �y 0 2.55 2M 2 "SP" �� ----V' - -- — ------------------- - - - - -- ----------------- City Clerk. Mayor. CITY OF 6T. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER In the matter of grading and surfacing with bituminous material the alley in Block 3, Berland Add. No. 1,` and Block 1, Angelene Addition from Pacific Street to McLean Avenue. Also c onstruct a storm sewer in the alley from a point 130 ft. north of McLean Avenue to the existing sewer in McLean Avenue. under Preliminary Order approved September 16, 1960 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: 19942- The total estimated ammhef the assessment for the above improvement is - - $ 3.652.00 The estimated cost pe /foot for the above improvement is - - - - - - - $ 8.91 The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Dated S 19�_ z Commissioner bf Finance-- Form B. S. A. 8 -5 D DESCRIPTION LOT BLOCK ADDITION ASSESSED lsrypLUATM Subject to easement 1 3 Berland Addition No. 1 43�� $5500 2 3 " . 325 :3750 , 3 3 " i 32� _3500 , 4 3 " 325 3500 5 3 325 , 3500 6 3 " 325 3500 7 3 " 375 ; 3500. Lots 8 and 9 1 Angeline Addition 1100 , i � t TOTAL $2,725• : $24.,7500 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Dated S 19�_ z Commissioner bf Finance-- Form B. S. A. 8 -5 D OFFICE OF THE COMMISSIONER OF PUBLIC WORKS REPORT TO COMMISSIONER OF FINANCE 0 September 26 19 60 To the Commissioner of Finance of the City of Saint Paul: The commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 198967 , approved September 16th 9 .19 60 , relative to grade and surface with bituminous material the alley in Block 3, Berland Add. No. 1, and Block 1, Angeline Add. from Pacific Street to McLean Ave. Also construct a storm sewer in the alley from a point 130 ft. north of McLean Ave. to the existing sewer in McLean Ave. and having investigated the matters and things referred to therein, hereby reports: 1. The estimated cost thereof is $ 3,652.00 (See Letter Attached) 2. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 3• 4. Initiated by the Commissioner of Public Works Improvement is asked for upon petition X Commissioner of Public Works :F k OFFICE OF THE COMMISSIONER OF PUBLIC WORKS REPORT TO COMMISSIONER OF FINANCE 0 September 26 19 60 To the Commissioner of Finance of the City of Saint Paul: The commissioner of Public Works, having had under consideration the preliminary order of the Council, known as Council File No. 198967 , approved September 16th 9 .19 60 , relative to grade and surface with bituminous material the alley in Block 3, Berland Add. No. 1, and Block 1, Angeline Add. from Pacific Street to McLean Ave. Also construct a storm sewer in the alley from a point 130 ft. north of McLean Ave. to the existing sewer in McLean Ave. and having investigated the matters and things referred to therein, hereby reports: 1. The estimated cost thereof is $ 3,652.00 (See Letter Attached) 2. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 3• 4. Initiated by the Commissioner of Public Works Improvement is asked for upon petition X Commissioner of Public Works :F z C I TY�"`O F1 R GEOGE M. SHEPARD STREET AND HIGHWAY ENG INEER ING_ COORDINATOR 1 ,Capit DEPARTMENT 234 City H S Al N T rRAMI% CHIEF I- of innesota M .1 ;OF PUBLIC_W_KS = = ° w s° R OR 311-&- CC- House-12)w ■ ■ ■ " � ". E V. AVERY a ENGINEER •- ;OTTER NTENDENT OF SANITATION r+ - ... Jar OWN ROSE`N,;,, ai ini � ili lot +�, M cmmissioner" ;,fl AM'P:°BEHRENS �ty Commissioner��r.�^ l 1 t t September 26, 1960 Hon. Milton Rosen Commissioner of Public Works City of Saint Paul Dear Sir: I transmit herewith preliminary estimate of cost for grading and surfacing with bituminous material the alley in Block 3, Berland Addition No. 1, and Block 1, Angeline Addition from Pacific Street to McLean Avenue. Also construct a storm sewer in the alley from a point 130 feet north of McLean Avenue to the existing sewer in McLean Avenue, under Preliminary Order C. F. 198967, approved September 16, 1960. Total Estimated Cost Engineering Inspection Cost per front foot Frontage Approved for tppnsmission to Wte7`7Z.- of Finance ilton Rosen Commissioner of Public Works Yo very truly, Eugene V. Avery Chief Engineer $3,652.00 265.60 66.40 8.91 410 ft. Y sfi �q *�( �.fi: j`2 To • The Ho � norable, The Council, St. Paul, Minn.- �� ..... °�- Z.............. 19 - -�0 • ' City of St. Paul, Minn. i Gentlemen: We, the undersigned property owners, hereby petition your Honorable Body to cause the following improvement to be made: Alley_ Grad ng -- and_- Surfaoing -- • --------------- - - - - -- -- - - - - -- Hazelwood - Barcla----------------------- fcMcLean ------------------------------------------------------------------------------------ St. Ave. ----- -------- -- ---- ------ - - - - -- S +— Ava—to _ ------------------------ - -_ - -- ------------------------------ )CK ADDITION ' G a2A_ c � CR 196'0 UQ 6M 6 -66 2 >1 (4 ZW C 4 1,74 O Q N h, I IV4 •17.- ,B / ?M I N C7- 77 O AWRCZ A Al WOOO' L-,- --J Q N h, I