202551r
Y
COUNCIL FILE N0_________________________
By----------------------------------------------------------------
R - - FINAL ORDER Council File ter 2f imp
^' In the matter of improving CLEVE-1
i LAND AVENUE from Randolph Ave -�
nue to Summit Avenue by widening
the paved roadbed on both sides to a 40 {
foot width by regrading and paving they
In the Matter of widened areas with new concrete base;
and asphaltic concrete surfacing; by I
resurfacing with asphaltic concrete the
.1 `• - �-" �,• , L' . "- �� _ _. =`,. s _ _ Y'^ -� existing pavement where necessary, by
constructing new curb and reconstr�uct-
k l .impro ii. g CLEVELM AVEP#X .from Rwdol h ,AYerue to S it i g dr_ in?
pdVf -d_ rce bed . -L! 'both -.q -1de3 to a. 40 -ftotf lwi th by ,'MgX; ng cad
az4er;e ;w3 th _}ec cnc �ba_ d ;a c t
asphaltc 'coLCrete e r tt g; `b� 'es i'aci ��►it2i�
tt►e esis - - paveme�rt' ?here necessasy� yt cx�t t6ing_neW curb
and reconstructing drainage faeilitieag by reconstructing sidewalks, curbs and pave-
ments on intersecting streets and a.Ueya vherr.. not in conformity with said improve-
sent; by reconstructing traffic control installations where necessary] by planting
neg trees where the existing trees are red and by doing all other work necessary
aAd incidental to cd4lete said- imprdwment ,
undo Prehm, nary Order ...............2QV'4.q.. ..__ approved D'c'ember
- ..... ----- _.....
Interi--------------------------------- - - - - -- approved -------------------------------------- - - - - --
public hearing having .
ng been had upon the above improvement upon due notice and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
'the same; 'therefore, be it - - -
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
ceed
toj be made by the said City is
ve CLEVELAND AVENUE from Randolph Avenue to Stm>mit Avenue with new asphaltic
rete surfacing; reconstruct existing concrete base and curbing where necessary;
instruct drainage facilities; reconstruct sidewalks, curbs and pavements on
!rsectipg streets and alleys where not in conformity with said improvement;,
instruct traffic control installations where necessary and by doing all other
necessary and incidental to complete said improvement,
Me%*,;. X., r r_a- 4n'��t,'. �t �i� to i;u made. --
WLVED FURTHER, That the Commissioner of Public Works be and is hcuby instructed and
i to prepare plans and specifications for said improvement, and submit same to the Council for
it ; that upon said approval, the proper city officials are hereby authorized and directed to pro -
th the making of said improvement in accordance therewith.
QW
opted by the Council ----- -_3 r
Approved-------------- - - - - --
File 15269
Councilman DeCourcy
Councilman Holland
Councilman Loss
C,,ouncilman Mortinson
Councilman Peterson
Councilman Rosen
Mayor Vavoulis
" 4
2.55 2M L2
1 3 1961
- - -64 -- -- V
City Clerk.
ZUBLISMD -Z.:
---------------
Mayor.
,14/_/ /_ _a,, !!? �_
— I . Ci UILAO AVOW from haadolph Avow. to &Awo t Avers by wi deni ng-
a* La and mod blk OR s i dm -to a 40 art Width by rep .K -Ji jy apd Fav 1 ag the wi Waned
aryt w101 am 4trete bw *ad �yM�lUS lsar� surfacing; by rawrfsslag with
08014100 owasrots the swisti" t7wliere srcesssry; by camtructing new curb
Mod roeeastruustl ng drab nape f as i l l t t rs 1 by reconstructing s i dswsl ks, curbo and - tie- '
**At$ v iantwsacting streets and allays Where not tan anfsnrity with said tm►revr
owAl Oy sow rstrwolag; traffic a mtrel lastal lnims where soww aryl by olootlag —
ow trMe o6a :the existing tr w or* ram sed and by doing all }thsr wsrlc arcassary
mad 1061 d0040i to ""loo sal d- t_�"remeRt
_-9
. A public hearing having been had upon the above improvement upon due notice, and the Council having
heard all persons, objections and recommendations relative thereto, and having fully considered the same;
� therefore, be it
RESOLVED, By the Council of the City of Saint Paul that the precise nature, extent and kind of im-
- NF provement to be made by the said City is
�: l
��Suir�!v /�i�!!GI7l./,P t�.i,fh />Gca arm s�o_�.G /,1c Gor��� .Su._- ����►y
- �%CG_Or_t3��«_�B_.t!iS �iy__9! C_di7Gr_✓_�C �Sc°__aitG� C!ir_,Gi�s� Gvfr�iY
! /7" 7-10- r_,0 C a4�Z,— _S�"'_ /_'_epCDors 7 /!.crl
ors /OG�c�4l�fS�_- Gc.r__�S A�i1_G��u��/�/�J►,�i1_r`S -4/7 /cJ_�r_S�G�` /i3
e.
and the Council hereby orders said improvements to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and` F
directed to prepare plans and specifications for said improvement,
�E
c
d.
?1$ N8.196 1�r_.
1� 1
June 7, 1961
361-South Cleveland Avenue
St, Paul 59 Minnesota
Honorable Mayor & Members of City Council
Court House
St. Paul 2, Minnesota
Gentlemen: r
I have your notice of hearing for June 13, 1961, relative to
the proposed widening of Cleveland Avenue from Randolph Ave.
to Summit Avenue. My home being located on S. Cleveland, I
am opposed to the proposed widening,yand wish to register my
objections thereto.
As a first alternative to the above proposal, might I suggest
that all parking be prohibited on S. Cleveland Avenue, which
I believe would make unnecessary arq widening of the street.
As a second alternative, I would suggest the making of Cleve-
land Avenue and Cretin Avenue as one -way streets, such as we
have in other parts of the city, and which I believe'would
take care of arq traffic problems.
Respectfully submitted,
Mrs. Helen Dahill
361 S. Cleveland Avenue
2, �I
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE _
ON PRELIMINARY ORDER
(A)
In the matter of improve Cleveland Avenue from Randolph Avenue to Submit Avenue by widening the
paved roadbed on both sides to a 40 foot width by regrading and paving the widened areas with
new concrete }base and asphaltic concrete surfacing; by resurfacing with asphaltic concrete the
existingj� pavement where necessary; by constructing new curb and reconstructing drainage facilities
by reconstructing sidewalks, curbs and pavements on intersecting streets and alleys where not in
conformity with said improvement; by reconstructing traffic control installat3�bns where necessary
by planting new trees where the existing trees are removed and by doing all other work necessary
and incidental to complete said improvement.
under
To the
1�3
Order approved December 27, 1960
of the City of St. Paul:
Commissioner of Finance hereby reports as follows:
total estimated cost of the above improvement is - - - - - $ 163 „485.73
estimated assessment per foot for the above improvement is - - - - $ see papers
lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lotj[or parcel as last reported by the Assessor, are as follows:
IIDESCRIPTION
I LOT
ISLOCKI
ADDITION II
LAND VALUATION BLDG.
II
I 1
I
I Orchard Park
IlMoo $5050
IlLots 27 and
128
I
I ”
II 5000 10200
t
II
I 1
I 1
I G. G. Whitney's Riverton Place
II 1050 4350
llI
12
I 1
I tt
II 1050
II
13
I 1
I tt
1575 5700
II
11
12
I "
1350 2300
�Ej of 4lot 29 and all of
130
I 2
I tt
II 2250 8150
II
I 1
I 1
I Lane Park 1st Division
II 1075 1900
2
I 1
I It
1075 3750
II
I I
I it
1075 3950 6
1
1 4
1 tt
1200 3800
o ±B
Frm B. B. l0 1M 8 -58 a Continued
' � ip ;
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)II
IIDE58RIPT40N
I
LOT IBLOCKI
ADDITION II
LAND VALUATION BLDG.
II
I
2 14
I
Lane Park lst Division
11$1200 2750
II
t 13
14I
"
II 1200 2750
IiSubj
to AV�es and alleys the E 231 I
I
II
1129/100
ftj�of N 170 48/100 ft of SEA I
I I
II
II
of NFJ o j 8 28 23 I
I I
II 4900 4100
kx W 38 41/100 ft the fol Lot 1 and I
I I
IN
1 ft of,
12
I l i
Hospes Park
875 4700
11EX
W 38 1�1
/100 ft and Ex N 1 ft 12
I 1
I 11
875 4700
II
11
I3
I 1
I "
II 1125 5300
II
Ex W 80 ft lots 4 5 and
16
I 1
I It
II 1950 8000
II
11
16
I Louden Park
1175 3650
2
161
II U50 3550
II
I3
16
l "
II 1150 4100
I(�
I4
16
I "
II 3.150 2600
II
15
16
I , ��
II 1150 2350
16
16
I 't
II 1175 4200
IIE
11
17
I
II 1175 3750
IIi
12
17
1
1150 6950
3
17
I "
II 1150 *4200
II�
I4
17
I "
II 1150 3300
IIE 86 76/100 ft of Lot 5 and E 77
I
I
I
II
i i76 /1000 ft of
16
7
I "
11150 7600
IlLots 111 and
12
I 1
I "
2300 4400
iiLots 3� and
14
I 1
I 'i
II 3450 14600
!!Lots 5 and
1 6
I I
I "
II 4625 5000
Lots Il 2 and
13
I Schoonmaker and Hunts Add.
II 3700 64750
l Lots 11 and
112
"
II 4650 7150
FORM 8.8i 11 NOD ]•ts 8
r
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(Bl�
IIDESCRfpT�ION
I
LOT IBLOCKI
ADDITION II
LAND BLDG.
Auditors Subdivision No. 68
11 $1250 $6450
11
1
2
1
"
11 1125 2850
II
I3
I I
111000 2450
II
I4
I I
"
11 1000 2300
II
I5
I
"
II 1000 3150
11
16
I I
1250 2600
.1
1
1 5 1
Oroveland Addition
1325 3450
2
15
I
1000 3000
II
13
15
I "
111000 2650
Il
1 4
15
I It
11 1000 1500
11
1 5
15
I It
1000
�I i
16 ►
15
1 It
11 1325 2400
11E
83 ft of lots 1 and
1 2
1 4
1
11 1350 2050
13
14
111000 2500
11
14
1 4
1
II 1000 3900
-�
15
14
I
11 1000 2700
III
16
14
I "
111325 3500
kot 1 and N 10 ft of
1 2
1 3
1 it
1300 2200
�c N 10 eft lot 2 and N of
1 3
13
I It
11 1300 3100
11S 1 of lot 3 and all of
1 4
I 3
1 "
II 1550 7000
15
I3
I
II 1050 3100
11
16
1 3
1 It
1050 2 800
II1
7
1 3
1 It
1050 2900
11�
18
13
1 "
111050 2950
11
11
1 2
1 "
13200 5350
12
12
1 "
111800 4950
13
2
" X)O
1 1500 7400
FORM D.N.ft �vw ]•ts 8
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)
IIDESCRI4'T40N
LOT IBLOCKI
ADDITION II
LAND VALUATION BLDG.
1li
I
14 I
2 1
Groveland Addition
1181000 $3300
II
1
5
1 2 1
"
1I 1000 2250
1I
1
6
2 I
"
11 1000
II
17
I 2 I
"
1I 1000 5000
II
18
I 2 I
"
II 1000 2 800
,I
Lots 1 �N d 1
2
1 1
"
3400 5000
lLots 1 2 and 1
3
I I
Moses Zimmermans Re
6550 18050
1 4
14
I Hankees Rearrangement
3000 34000
II
1 3
14
I
II 1o50 3950
II
4
I 3
I "
11 1050 3300
3
13
I t
1050 4650
II
14
12
I
II 1050 4350
II
13
12
I It
II 1050 4650
II
1 4
11
I "
11 1050 7000
II 12 of illot 2 and all of
1 3
I 1
I "
II 1500 4350
I. 11.
116
I 5
I Heights
II 950 4550
16ts ]4 and
115
15
I "
II 1950 7200
ilLots 16 and
1 17
14
I ��
1950 5600
Lots 13 14 and
115
14
I "
II 2950 13700
III
116
I 1
I
(1950 4400
II
115
11
I "
11950 3800
II117
I 1
(Robert L Wares Addition
1000 2500
II116
1 1
1 "
1000
!Ii
115
I 1
1 "
111000
sots 13 and
Ik
1114
I 1
I n
11 3300 14850
II112
1 1
I "
115000 23150
1
I
I
IF
8
IOPM 9-3-11 " a•ia
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
' ON PRELIMINARY ORDER
(C)
II`
DESCRIF'T4ON I
{
LOT IBLOCKI
ADDITION
II
ASSESSED
VALUATION
LAND BLDG.
11W
24 ft of Kepneth St vac adj and I
I
7 I
Underwoods 3rd Addition
11$28125 $170300
iiEx
E 18/ 5/10- ft of lot 11 and ex I
I
I
II
11S
62 21/100 ft lots 13 14 and I
151
6 I
"
II 1550 6501
IIExE1851'10ftof
lot 15 the S •I
I I
II
1162
21 /100,ft
of lots 13 14 and 1
151
6 I
"
II 1550 8000
kots 10
111 and I
12
I 6 I
"
3700 2350
iiW
10 ft
Sf lot 17 and all of 1161
2 I
John J. Keflnas Rearrangement
1250 6200
11W
5 ft of
lot 14 and all of I
15
I 2
I "
� 2.125
iw
10 18/100
ft of lot 14 and all of
113
I 1
I
II 1250 3800
il
11
112
I 1
I
I! 1375 4700
IIEx
S 80 !ft
lots 13 and
114
I
I Scotts Addition
1900 7200
ils
80 ft jo
f fol lots 13 and
I 14
1725 2600
II
I12I
I "
II 1400 1950
kx Alley
132
13
I Rosedale Park
II 1100 3300
ilEx S loft
for alley the fol S 60 ft
of
I
I
II
iiw 10 f4of
lot 30 and S 60 ft of
131
I 3
I "
II 750 1200
ItJ alley the fol Ex E 10 ft
iilot 29 the N 100 ft of lots 30 and
lk
131 and �Ex W 10 ft and Ex N 100 ft
130
I 3
5700 12550
ilEx alley lots 26 and
127
12
I "
II 6075 10600
11Ex Ave �,,�and alley W 45 ft of
125
I 2
I I�
2100 8900
III
TOTAL
I 745,550-
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Date
Commissioner of Finance.
Form 111,22 1M 3-68 8
4,
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
Marrh 99 , 19 61
the Commissioner of Finance of the City of Saint Paul:
�rq
The commissioner of Public Works, having had under consideration the
liminary order of the Council, known as Council File No. 200206 ,
aLpproved December 27 19 60 , relative to /
— improving
'f CLEVELAND AVENUE from Randolph Avenue to Summit Avenue by widening the
R paved roadbed on both sides to a 40 foot width by regrading and paving
the widened areas with new conc.rste base and asphaltic concrete surfacing;
�,• by resurfacing with asphaltic concrete the existing pavement where necessary;
by constructing new curb and reconstructing drainage facilities; by recon-
structing sidewalks, curbs, and pavements on Intersecting streets and alleys
k where not in conformity with said improvements; by reconstructing traffic
k
control installations where necessary and by doing all other work necessary
k and incidental to complete said improvements referred to therein, hereby
ports:
1. The estimated cost thereof is $ 163,485.73 (see letter: tanhpd)
y
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof..
'3. Initiated by the Commissioner of Public Works X
d
4. Improvement is asked for upon petition
of 1
4,
1 r Commissioner of Public Works
ego„
"G' 00 f SHEPARD .
FFG'Ya` NI.�
(STREET AND�HIGHWAY
ENGfNEERING COORDINATOR
a.-
71`J L.. .'l t #
Ift
A PR
-" _ �>i � • � r"1�
MII'TO -N ROSEN,;, n lil 'it ili� 1�� L'"
3 Commissioned r! iiii t1(
'P r
.y
E V. AVERY
ENGINEER
:OTTER,
NTENDEENT OF SANITATION
F � : i- '°j--
Commission'e'r-_1
1 March 29, 1961
Honorable Bernard T. Holland
Commissioner of Finance
City of Saint Paul
Dear Sirs
I transmit herewith a preliminary estimate of cost for improving
CLEVELAND AVENUE from Randolph Avenue to Summit Avenue by widening the
paved roadbed on both sides to a 40 foot width by regrading and paving
the widened areas with new concrete base and asphaltic concrete surfacing;
by resurfacing with asphaltic concrete the existing pavement where necessary;
by constructing new curb and reconstructing drainage facilities; by recon-
structing sidewalks, curbs, acid pavements on intersecting streets and alleys
where not in conformity with said improvements; by reconstructing traffic
control installations where necessary and by doing all other work necessary
and incidental to complete said improvement, under Preliminary Order C.F.
200206, approved December 27, 1960.
Estimated Paving Cost $146,077.94
Engineering & Inspection 14,607.79
Water Department Charges 21800.00
Total Estimated Cost $163,485.73
Estimated Property Assessment 21,760.00
Cityts Share of Cost (County Aid Funds) $141,725.73
Estimated property share of cost is based on making the followinM
sessment rates per front foots
Ilk.
Et Commercial Properties and Multiple
Dwelling Properties 1,556 Ft. @ $5.00 - $ 7,760.00
1961 +� Residential Properties 4,660 Ft. @ $3.00 - 139980.00
op $21 760.00
Driveways where necessary at $5.00 per square yard �'
6" Sewer Service Connections, where necessary, at $335.00 each
Water service connections as per following schedules
CITY 'O P S M N T
Capital of" Minnesota
'- _ : ' i y �'. " : ;J.. vi
'• - I is
DEPARTMEINTaaOF�PUBLIC WORKSE"= -- -+ S`�P
234 Citj�1►IL,;HialL &Court .House t(2p
-" _ �>i � • � r"1�
MII'TO -N ROSEN,;, n lil 'it ili� 1�� L'"
3 Commissioned r! iiii t1(
'P r
.y
E V. AVERY
ENGINEER
:OTTER,
NTENDEENT OF SANITATION
F � : i- '°j--
Commission'e'r-_1
1 March 29, 1961
Honorable Bernard T. Holland
Commissioner of Finance
City of Saint Paul
Dear Sirs
I transmit herewith a preliminary estimate of cost for improving
CLEVELAND AVENUE from Randolph Avenue to Summit Avenue by widening the
paved roadbed on both sides to a 40 foot width by regrading and paving
the widened areas with new concrete base and asphaltic concrete surfacing;
by resurfacing with asphaltic concrete the existing pavement where necessary;
by constructing new curb and reconstructing drainage facilities; by recon-
structing sidewalks, curbs, acid pavements on intersecting streets and alleys
where not in conformity with said improvements; by reconstructing traffic
control installations where necessary and by doing all other work necessary
and incidental to complete said improvement, under Preliminary Order C.F.
200206, approved December 27, 1960.
Estimated Paving Cost $146,077.94
Engineering & Inspection 14,607.79
Water Department Charges 21800.00
Total Estimated Cost $163,485.73
Estimated Property Assessment 21,760.00
Cityts Share of Cost (County Aid Funds) $141,725.73
Estimated property share of cost is based on making the followinM
sessment rates per front foots
Ilk.
Et Commercial Properties and Multiple
Dwelling Properties 1,556 Ft. @ $5.00 - $ 7,760.00
1961 +� Residential Properties 4,660 Ft. @ $3.00 - 139980.00
op $21 760.00
Driveways where necessary at $5.00 per square yard �'
6" Sewer Service Connections, where necessary, at $335.00 each
Water service connections as per following schedules
J
Commissioner Holland - 2 - March 29, 1961
a
East side of street
3/4" service connection, $225.00 each, where necessary
1 u " Is 238.00 " of "
1 1 /2" " is 288.00 to to "
West side of street
3/4" Service connection, $195.00 each, where necessary
1 " " is 208.00 " to it
1 1/2" " it 258.00 " to "
An additional fee of $3.00 is charged if the meter is moved or
a new one is installed. Services of 2" or larger will be estimated by the
Water Department.
Yours every truly, )
CLAUDE L. THOMPSON
Design Engineer
CLT /km
Approved:
vC
EUGJfNE V. AVERY, Chief En r
MILTON ROSEN, Commissioner of Public Works
4F� ?�l7
N
iMIN•f!!!ltl
t �r
NAN
M�
.r
r
li
o a/- 0
/Ali
r
71
��,�,�
J/ Dv ✓ /s 00'7r! Srii // Awe
rl
m
�4 co
li I
,c-A p- nf o 7-,
it
9,6-A-WrZC Y
it
it J
S STAW f: rw WALK
N%
TAW f: J.r%
1
4
o
4t
-lZ
..... �AL A_c
IN
I
yF
It
tf
ak
iF
4'
R— M 0 (//V
. . . .......
- Y
FP=_
WALK
Al
SrAMoc-0.970-
o
.0
LLI
14 VI-c-
•o 5 0 ----------
A VE.
SAL A C
AVE.
E II
[__ _ .
AND -V Z AA/
7p 1
A VE.
SAL A C
AVE.
E II
[__ _ .
AND -V Z AA/