201901COUNCIL FILE N0_________________________
By-------------=-------------------------------------------- - - - - --
FINAL ORDER
In the Matter of constructing and /or reconstructing the sidewalk on both sides of
Chelton Ave. from Fairview Ave. to Tatum Ave. on the north, and from Fairview Ave.
to the east line of Tatum Ave. projected on the south side
0
under Preliminary Order____ ______ _ __ QQ73 A ------------------ approved ______
COUncil File No. 201901 —
In the matter of constructing and /or
reconstructing the sidewalk on Fboth
sides of Chelton Ave. from Fairview
Ave. to Tatum Ave. on the north and
from Fairview Ave. to the east line
of Tatum Ave. projected on the south
side under Preliminary Order 200714
approved February 7. 1981.
A public hearing having been ha
upon the- above improvement upon
'� � the 'A aP--4;avinff
... ;_ -------------
IntermediaryOrder ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to construct and /or reconstruct the sidewalk on
both sides of Chelton Ave. from Fairview Ave. to Tatum Ave. on the north, and from
Fairview Ave. to the east line of Tatum Ave. projected on the south side, except
where good and sufficient sidewalks now exist
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvement in accordance therewith.
Adopted by the Council ------- �AI �g
- 2
MAY 2 19M
Approved--------------------- - - - - --
File s6465
Councilman
Councilman DeCourcy
Councilman
Councilman Loss
Councilman
Councilman Peterson
Mayor
Rosen
2.55 2M 2 ,
--------------------
City Clerk.
--------------------------------------------
Mayor.
0
Oii1 (0- I R
r
• CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(A) �g
i
In the matter of constructing and /or reconstructing the sidewalk on both sides of Chelton Ave.
from Fairview Ave. to Tatum Ave. on the north; and from Fairview Ave. to the
East line of Tatum Ave. projected on the south side.
201911
under Preliminary Order approved February 7, 1961
To the Council of the City of St. Paul:
The Commissioner of Mnance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $
s
The estimated assessment per /foot for the above improvement is - - - - $ 0.52 per sq . ft.
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot or parcel as last reported by the Assessor, are as follows:
Form B. B. 10 1M 3 -68 8
r
IIDESCRIPTION
I LOT
I BLOCKI
ADDITION
I LANDVALUAT ASSESSED
II N'Ly 12 of Lot 17 and all of
116
I 9
Midway Heights
II 750 4150
II S' ly of Lot 17 and all of
18
I 9
It "
II 775 4600
II
119
19
11� 11
If 850 4300
II Ex W 3 ft.
120
I 9
I it i'
II 575 3800
W 3 ft of Lot 20 and all of ,2-
121
I 9,`;
I " "'
55o 1800
122
19
I "
575 4300
!I
18
114
I «, 11
II 600 2300
II
13
1161
It "
600 2650
II 14
116
I " "
600 2900
I!
I
Form B. B. 10 1M 3 -68 8
r
f •
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(B)
IIyDESCRIPTION
LOT IBLOCKI
ADDITION II
LAND VALUATION BLDG.
II
E' ly ,A 'Pt of Lot 6 measuring 25 ft.1
I
I
11
1I
on st and 11 ft on NWIly L of I
I
I
II
IIalley
and all of 1
5 1
16 1
Midway Heights
11 825 4700
11
Ex E'ly part measuring 25 ft. on 1
I
I
11
II
St. and 11 ft on NWIly L of alley 1
I
I
11
11
Lot 6 and all of 1
7, 1
161
Midway Heights
825 4750
II
1
8 1
16 1
It 11
650 2000
I1
I9
1 161
11 It
700 4800
II
10
1 16
1 _ " '�
II .700 4000
11
NEIly of Lot 12 qnd all of 111
16
1 It It
3350~
II
SWI ly of Lot 12 and NE I ly part
1
1
1
II measuring 47 ft on NFIly L and 41
I
1
1
11
11
ft on SE I ly L of
1 131
16
11 11
II 800 4350
II
Ex Nelly part measuring 47 ft on
1
1
1
11
II MVI ly L and 41 ft on SE I ly L lot
I
1
1
1I
I113, and part of Lot 14 NE I ly of L
1
I
1
11
II run from S cor to pt on NWIly L of
I
I
I
IIand 6 ft measured thereon from
I
I
I
W cor of sd
1 14
1 16
1 if "
11 525 4350
11 Part of Lot 14 SW' ly of L run from
I
I
11
11 S cor to pt on NWIly L of and
I
1
I
11
6 ft measured thereon from W cor
I
1
1Iof sd Lot 14 and all of
1 15
1 161
Midway Heights
600 4750
116I
161
"
II 600 3800
Mays Park
II3, 900 12,500
11
1
TOTAL -11416475-
$84,150-
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Form B.B. 12 1M 348 04P008
Commissioner of Finance.
d
:r
Dist. No. 1
Chelton — Fairview to Tatum — north side
Fairview to Tatum(projected) south side
7 1 5 & y b.s
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
Feb. 10th. , 19 61
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 200714 ,
approved Feb. 7th. , 19 6l , relative to
and/or reconstructing the sidewalk on both sides of Chelton Ave. from Fairview
Ave,to Tatum Ave. on the north; and from Fairview Ave. to the east line of Tatum
Ave. protected on the south side.
and having investigated the matters and things referred to therein, hereby
reports:
I. The estimated cost thereof is $ 0.52 per s4• ft. for rgono. conc. walk 4"
thick. Ex tra work(excay., fill, conc. rem'd, root cutting, drive crossings,etc.)
at extra cost.
2. A pi3n, profile or sketch of said improvement is hereto attached and
made a part hereof.
3. Initiated by the Commissioner of Public Works
4. Improvement is asked
111 1
spy iaEIVL .
FEB 10 1961
P ITT, OF
FINANCE
X
for upon petition
Commissioner of Public Works
til
I
w/