2017731k
a,
COUNCIL FILE NO.
By-------------- - - - - --
FINAL ORDER
201773
kn the Matter of reconstructing the sidewalk on both sides of Fuller Ave. from
Virginia St. to Farrington St. _
under Preliminary Order--- - - - - -- 200124
Council File No. 201773 —
In the matter of reconstructing the
sidewalk on both sides of Fuller Ave.
from Virginia St. to Farrington St.,
under Preliminary Order 200124, ap-
proved December 20, 1960.
A public hearing having been had
upon the above 'improvement upon'
due notice, and the Council havingg
heard all pergons, objections and -
eropqmendatkons rel tive thereto, and
-- approved - -- December 20t 1960
Intermediary Order ---------------------------------------------- - - - - -- approved --------------------------------------------------------------------
A public hearing having been had upon the above improvement upon due notice, and the Council
having heard all persons, objections and recommendations relative thereto, and having fully considered
the same; therefore, be it
RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im-
provement to be made by the said City is to reconstruct the sidewalk on both sides of
Fuller Ave. from Virginia St. to Farrington Ste., except where good and sufficient
sidewalks now exist
and the Council hereby orders said improvement to be made.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and submit same to the Council for
approval; that upon said approval, the proper city officials are hereby authorized and directed to pro-
ceed with the making of said improvvemegt�ccordance therewith.
A� r
Adopted by the Council------------------------------------------------ - - - - --
Approved---------------- - - - - --
File 56424
Councilman
Councilman c
Holland
Councilman
Councilman loss
Councilman Peters son
Peterson on
Rosen
Mayor
Vavoulis
2.55 2M 2 011W
APR 2501
...........
,A City Clerk.
PMOSRW4/ ��i1.70
Mayor.
A
CITY OF ST. PAUL • `�
' DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(A)
F
In the matter of reconstructing the sidewalk on both sides of Fuller Ave. from Virginia St.
to Farrington Street.
y
under Preliminary Order approved December 20, 1960
To the Council of the City of St. Paul:
201393
The Commissioner of Finance hereby reports as follows:
The total estimated cost of the above improvement is - - - - - - $
The estimated assessment peA of for the above improvement is - - - - $0.52 mono:. conc.
4" walk, (Excay., fill,�conc. rem'd, root cutting, drive crossings etc. at extra cost)
The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of
each lot pr parcel as last reported by the Assessor, are as follows:
IIDESCRIPTION
I LOT
IBLOCKI
ADDITION
I LAND VALUATION BLDG.
II
1
7
1 5
1 Elfelt Bernheimer and Arnolds
i10950 $4350
II
1 815
1 It
11 850 3650
191
5
1 it
11 850
110151
It
11850 2600
1 1115
1
850 1500
1215
1
950 1850
'I W 1 ft of lot 2 and all of
1 1
1 8
1 't
11 975 2550
iiEx W 1 ft
1 2
1 8
1 it
11 825 9000
11 W 2/3 of
1 3
1 8
1 It
� 550 1400
iiW 1/3 of lot 4 and E 1/3 of
1 3
1 8
1 t'
550 2650
1 E 2/3 of
4
1 8
1 "
550 1850
Form B. B. 10 1M 3 -58 3 Continued
C
CITY OF ST. PAUL
DEPARTMENT OF FINANCE
1 REPORT OF COMMISSIONER OF FINANCE
ON PRELIMINARY ORDER
(C)
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Dated
Alt-
Commissioner of Fin ce.
Form B.B. 12 1M 3-68 08
DESCRIPTION I
LOT IBLOCKI
ADDITION
ASSESSED
�
s
� a
� e � , 11$85AN0 1800
6
8
950 4250
M
i
u
o
iii
u
i
Q
I
I
I
III
I
TOTAL 11$1o,550-
437..45o.
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters,
and hereby submits the foregoing as his report thereon to the Council, together with the report made
to him in reference to said matter by the Commissioner of Public Works.
Dated
Alt-
Commissioner of Fin ce.
Form B.B. 12 1M 3-68 08
r
Dist. No* 1
Fuller - Virginia to Farrington - both sides
OFFICE OF THE COMMISSIONER OF PUBLIC WORKS
REPORT TO COMMISSIONER OF FINANCE
Dec. 28th.
To the Commissioner of Finance of the City of Saint Paul:
The commissioner of Public Works, having had under consideration the
preliminary order of the Council, known as Council File No. 200124 f
approved Dec. 20th. 19 60 , relative to reconstructing
the sidewalk on both sides of Fuller Ave. from Virginia St. to Farrington St.
--ti
and having investigated the matters and things referred to therein, hereby
reports: _
1. The estimated cost thereof is $ 0.52 per sq, ft. for Sono, conc. walk 4"
thick. Extra work(excay., fill, conc. rem'd, root abutting, drive crossings.etc.)
at extra cost.
2. A plan, profile or sketch of said improvement is hereto attached and
made a part hereof.
3. Initiated by the Commissioner of Public Works g
4. improvement-is asked for upon petition
12
AFC 3� t r Commissioner of Public Works
OP
NCR