201761Council File No. 201761-
,
In the matter of improving WHITE
BEAR AVENUE from East Third Street
i{v to Hudson Road (T.H. Nb. 12) by
regrading, curbing and paving with
8" one course concrete pavement; by
grading and paving street, alley and
driveway returns; by grading and
sodding boulevard areas where new 2,01761
v drainage constructed; f facilities; by reconstructiing
sidewalks curbs and pavements on NO
intersecting streets where not in con-
formity with said improvement; by
constructing sewer, water and gas
service connections from street mains
INTERMEDIARY ORDER
In the Matter of improving WHITE BEAR AVENUE from East Third Street to Hudson Road
(T.H. No. 12) by regrading, curbing and paving with 8" one course concrete pavement;
by grading and paving street, alley and driveway returns; by grading and sodding
boulevard areas where new curb is constructed; by constructing drainage facilities;
by reconstructing sidewalks, curbs and pavements on intersecting streets where not
in conformity with said improvement; by constructing sewer, water and gas service
connections from street mains to property lines where necessary and by doing all -
other work necessary and incidental to complete the said improvement
under Preliminary Order 200167 Approved December 22, 1960
The Council of the City of St. Paul having received the report of the Commissioner of Finance
upon the above improvement, and having considered said report, hereby resolves:
1. That the said report ,4nd the same is hereby approved and adopted, and the said improvement
is hereby ordered to be proceeded with.
2. That the nature of the improvement which the Council recommends is to improve WHITE BEAR
AVENUE from East Third Street to Hudson Road (T.H. No. 12) by regrading, curbing and
paving with 8" one course concrete pavement; by grading and paving street, alley and
driveway returns; by grading and sodding boulevard areas where new curb is constructed;
t by constructing.drainage_ facilities; loy,.reconstructing sidewalks, curbs and pavements
on intersecting streets wherghot in conformity with said improvement; by constructing
sewer, water and gas service connections from street mains to property lines where
necessary and by doing all other work necessary and incidental to complete the said
improvement
with no alternatives, and that the estimated cost thereof is $ 77,710.-32
Resolved Further, That a public hearing be had on said improvement on the 23rd day of
May, 1961 , at the hour of 10 o'clock A. M., in the Council Chamber of the Court
House and City Hall Building in the City of St. Paul. That the Commissioner of Finance give notice of
said meeting to the persons and in the manner provided by the Charter, stating the time and place of
hearing, the nature of the improvement and the total cost thereof as estimated.
File 15197
COUNCILMEN
Yeas
0-
Nays
- -In Favor
Against
AMM
APP, 1 IRA
Adopted by the Council
OR 2 5 AM
pprove
Mayor
ZU_BLISHED y �4 /Fb