Loading...
203628r - rM1 a Council File No ... _ ...................... _...... `By ........... ... ................... 4 Resolution Council File No. 203828 — In the matter of the assessment of benefits, cost and expenses for chang -1 ing the grade of the alley in Block 4,' Holcombe's Addition; Block 2, Thomp- son's Subdivision, and Block 20, Moss's Outlots, from Dale St. to St. Albans St. to conform to the grade as shown i on the profile on file in the Department, of„ Pu llr- `Work; also grading and CITY OF ST. PAUL Ratifying Assessmi In the matter of the assessment of benefits, cost and expenses for I changing the grade of the alley in Block 4, Holcombe's Addition; Block 2, Tho>pson's Subdivision, and Block 20, Moss' Outlots, from Dale St. to St. Albans St. to conform to the grade as shown on the profile on file in the Department of Public Works; also grading and surfacing with bituminous material the alley in Block 4, Holcombe's Addition; Block 2, Thompson's Subdivision, and Block 20, Moss' Outlots, from Dale St. to St. Albans St. to the proposed change of grade I under Preliminary Order ...... 4A9.109 , •Intermediary Order.... 18963D.......... Final Order _.1$9945 -_------- 8 approved ......... ____-- ...----- November •---18 - -• - - :- ....19..E .... A public hearing having been had upon the assessment for the above improvement, and said assessment i having been further considered by the Council, and having been considered finally satisfactory, be it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation. i BE, IT FURTHER RESOLVED, That the said assessment be and it is hereby determined to be payable In .--- . - - - - -- _ .......... installments. 1 Adopted by the Council____._... AUG 2_3 19 AUG 2 3 1961 Approved---..._..---_.._----- -------------- ------ 19 ...... - Frfle $14231 PUBLISHED i Urk. ayor. b/ .i- r 2,03628 CITY OF ST. PAUL � OFFICE OF THE COMMISSIONER OF FINANCE A_ 44 Report of Completion of Assessment In the matter of the assessment of benefits, cost and expenses for changing the grade of the alley in Block 4, Holcombe's Addition; Block 2, Thompson's Subdivision, and Block 20, Moss' Outlots, from Dale St. to St. Albans St. to ?onform to the grade as shown on the profile on file in the Department of Public Work ; also grading and surfacing with bituminous material the alley in Block 4, Holcombe s Addition; Block 2, Thompson's Subdivision and Block 20, Moss' Outlots, from Dale St. to St. Albans St. to the proposed change of grade under Preliminary Order 182109 , Intermediary Order 189630 , Final Order 189945 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports to the Council the following as a statement penditures necessarily incurred for and in connection with the making of the above Cost of construction . ............................... $ 3,891.30 Engineering .............. ........................$ 374.00 Inspection fees ...... ..............................$ Postal cards .................. ....................$ 3.00 Publications ........ ..............................$ 30.00 _ Court costs for confirmation ........................$ 3.00 Total expenditures ............................. $ 4.301.30 Said Commissioner further reports that he has assessed and levied the total amount as the ex- viz: ascer- tained, to-wit: the sum of $4.301.30 upon each and every lot art or p parcel of lantl deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. 2M 12 -62 g Commissioner of