Loading...
08-1204Council File # Gg � a-d y Green Sheet#3060295 Presented by RESOLUTION 41NT PAUL, MINNESOTA 3$ 1 WIIEREAS, the Saint Paul Right of Way management ardinances require a pernut fee shucture which 2 covers city costs, degradation costs, and disruption costs, and 3 4 WHEREAS, in enacting the curtent fee structure, the City Council resolved that the fee struchxre should be 5 reviewed on an annual basis, and 6 7 WHEREAS, the current fee stnxcture was adopted in 2008, and the proposed 2009 budget includes a ten 8 percent increase in the fee structure, NOW, THEREFORE BE IT 10 RESOLVED, that the attached "Excavation/Obstruction Perxnit Fee Structare and its attachments are 11 hereby approved, and be it further 12 13 RESOLVED, that the new fee structure shall become effective on January 1, 2009. 14 Requested by Department of. �.� ��c �U,�: i B Form Approved by City Attom�ey BY� �F�f/C�� �(/� Adoption Certified by Coi cil Secretary Form App ed b Ma or for Sub ion Council By: g �� Approved b a ate / / � BY� . L^ OF�' : � �� Adopted by Council: Date ���jJ�/Dff GJ � Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet � nA - lag�{ Depar6nent/Office/Council: � Date initiated: PW_PubiicWorks oz-��T-�$ Green Sheet NO: 3060295 Contact Person 8 Phone: Deoar6nent Sent To Person Initial/Date Paul St. Martin 6pC � 0 blic Works Paoi St Martin P to •2''s 266-6118 1f`� 1 bScWorks , 1' � Depar�entDireMOr %�� Ass�gn 2 ancisl Services ffice FSnancial Services �� � 3 Must Be on Council Agenda by (Date): Number 3 �� � 08-OCT-08 Far RouUng 4 a or's O�ce Ma or/AssisEant Doa Type: RESOLUTION W/$ Order 5 onncil Ci Coancil TRANSACTION 6 i Clerk C5 Clerk E-DOCUment Required: Y Document Contact: Paui St Marfin g � i � o Contact Phone: 266-6118 �L���A tl �� Total # of Signature Pages_ (qip All Locations for Signature) � Action Requested: " Resolution setting Right of Way fees for the period 1/1/09 - 12/31/09. ,�. ��,, ���� �� ��� �.aY � ; Recommendations: Approve (A) or Reject (R): Personal Service Contracts Must Answer the Following Questions: Planning Commission 1. Has this personffirm everworked under a contract for this department? . CIB Committee Yes No Civil Service Commission 2. Has this person(firm ever been a city employee? . Yes No 3. Does this person/Firm possess a skill not normally possessed by any current ary employee? Yes No Explain all yes answers on separate sheet and attach to green sheet. Initiating Problem, Issues, Opportunity (Who, What, When, Where, Why): � The Saint Paul Right of W ay management ordinances require a permit fee shvcture which covers city costs, degadation costs, and disruption costs. In enacting the current fee structure, the City Council resolved that the fees should be reviewed on an annual basis. The current fees were approved in 2008. The proposed 2009 budget includes a ten percent increase in the fees. Advantages If Approved: The proposed increase in fees will fund increased cosu to administer the ordinances. Disadvantages If Approved: None. Disadvantages If Not Approved: Right of Way fees will not increase in accordance with the pmposed 2009 budget. Total Amount of Transaction: $100,000.00 CostlRevenue Budgeted: Funding Source: Traffic and Lighting 240 Fund pctivity Number: 12015 Financial lnforination: Based on the number of pemilts issued per year, tlris fee increase will raise permit fees ten percent overall (Explain) �approximately $100,000 on total revenues of $1,000,000). October 2, 2008 228 PM Page 1 D8-1a EXCAVATION / OBSTRUCTION PERMIT FEE STRUCTURE A_ EXCAVATION PERMITS: Cost Components include "City cost" (administration, inspection, and records), Pavement Degradation, and Disruption charge. (per Saint Paul Legislative code, chapter 135). Meter hooding charges are extra. 1) $180 per hole on local streets*, $268 on collector/arterial streets* (includes up to 25 feet of excavation), plus $2.60 per foot of excavation >25'; plus additional disruption cost fees for street closure resulting in detours, permittee delays in project completion, or other similar conditions. 2) For house service connections, $180 per connection for the first six per block, and $70 per connection for the rest in that block. $64 for joint sewer service/right of way permit. 3) Degradation to be calculated separately based on Public Utilities Commission Rules if proper restoration is not proposed or completed. 4) The Disruption Cost Basis based on the attached Grace Period Matrix and Disruption cost basis charts; calculated using the length of excavation in feet; number of lanes occupied (sidewalk/ boulevard; parking lane; 1, 2, 3, or 4 traffic lanes); average daily traffic count (ADT) for the street segment(s) in which the permitted work will occur; and time of day (24 hour; daytime; 6 PM to 6 AM; or 9 AM to 3 PM). B. OBSTRUCTION PERMITS: Cost Components include "City cost" (administration, inspection, and records), and Disruption charge. (ger Saint Paul Legislative code, chapter 135). Meter hooding charges are extra. 1) Various locations permits may be issued for individual vehicles at a monthly rate of $110. Specific conditions apply. This permit may be issued for up to one year at the specified rate. This is not for utility work. 2) Various Locations - Mobile Food Cart permits are issued for individual food carts at a monthly rate of $33. Specific conditions apply. This permit may be extended as necessary. 3) For new overhead utility installation $180 on local streets, $268 on collector/arterial streets plus $0.65 per foot of installation. There will be no disruption charge for work in any block not exceeding five working days. 4) For lashing new cable onto existing cable by the same owner, $180 on local streets, 5268 on collector/arterial streets plus $0.15 per foot. 5) For replacing existing cable with new cable in the same location vertically and horizontally, $180 on local streets, $268 on collector/arterial streets plus $0.15 per foot. 6) For placing or replacing cable in existing conduit where no digging is necessary, $180 on local streets, $268 on collector/arterial streets plus $0.15 per foot. 7) For geoprobes or soil borings for a specific site, $180 on local streets, $268 on collector/arterial streets plus $14 per hole. 8) For wireless telecommunications devices mounted on existing poles with a minimum of 12 feet clearance from the ground, $180 on local streets, $268 on collector/arterial streets plus $14 per device_ 9) For monitoring we11s for a specific site, $180 on local streets, $268 on collector/arterial streets plus $26 per month per well. 10) For full block construction, $180 on 1oca1 streets, $268 on collector/arterial streets plus $37 per day per block face for sidewalk and parking lane, if any. Use of traffic lanes calculated according to the Disruption Cost Basis (traffic count for affected street segments). 11} Dumpster permits $6 per day outside downtown and $11 per day downtown, plus meter hooding charges. 12) For overweight/oversize transportation permits $28 per single permit, $132 for annual permit. 13) For placement of benches, chairs, tables, fences and planters. Permits are issued April 1 thru October 31s` at a seasonal rate of $50. *NOte: Collector/arterial streets are defined in the City of Saint Paul Transportation Policy Plan. All other streets are considered local. 08-1a-o�f DISRLTPTION COST BASIS Parking Lane with meters: $5.00 per meter per day plus lost meter revenue and a hooding charge. The hooding charge is a labor chazge for hooding and unhooding meters. No grace period applies. Parking Lane without meters: $6.00 per calendar day for each 20 feet of length outside of the downtown business district. $11.00 per day within the downtown business district. Note: If this is in a"Rush Hour" zone, the pazking lane rate would apply only if it is not used during the "Rush Hour" period. Driving Lanes: Basic formula — Average Daily Traffic x Number of calendar days x Detour distance in miles x$0.485 per mile For each direcfion: (one way ADT = 50% of total ADT) Loss of all traffic lanes: 100% of one way ADT Loss of one of two traffic lanes: 40% of one way ADT Loss of one of three traffic lanes: 20% of one way ADT Loss of two of three traffic lanes: 60% of one way ADT NOTE: For work between 9 AM and 3 PM where lane is opened back up to traffic, 50% of the above will apply. For work between 6 PM and 6 AM where lane is opened back up to traffic, 30% of the above will apply. Noise ordinance restrictions will continue to be enforced. Sidewalk / Boulevard Areas: for each 20 foot increment Closed to Pedestrian Traffic: Commercial- $11.00 per calendar day Closed to Pedestrian Traffic: Residential- $6.00 per calendar day Pedestrian traffic maintained- No Charge Alleys: Use basic formula with ADT = 200, and length of alley = detour distance. Turn Lanes, Bus Stops: Treated as loss of through lane. Disruption cost begins after the grace period for utility work. Intersections: Treat each street separately. No disruption cost for utility work in areas closed to traffic for City Construction projects. 09/25/08-DS C 0 � � G i4 W W ..�i � � � ^� 0 x. ^�� I� � G � L7 � � Q o�, o� o� a� 0o N oo N oo N � N C7 m m�' �3 c�3 �3 m m � y b c0 v� l� M v� t�l V� 'O 'O 'LJ 'G 'II 'O 'C 'CS .- .-N. O O � j' + '�- + -F '�' j' '� � �o m h� M�n n h 3 W � . _ Q O� O� O� O� �, M C��1 ti c�l � M >, � T >. T � '�j N l� V' iD N V N V �'O .� 'O � b .� 'C M N O O � + + + + + + + + 0 .� � � � � N � N � � �" Q � O � O � O � O � � � � h � � � � �� �� �� �R �.,N o0 Vi I� M�n N V N V + + + + + + + + 3 y � I� M v� � � N 7 � "v� �n "v� �n �n "vi "v� "v� v� �n �n "v� "v� "v� `v� �n C' 6�' ¢ d w vi n vi n vi n vi n vi n vi n vi n vi n z z z z A a � i .. ;; .� � „ ;; � ., ;; ... E� a� m a� m v �a v '� a� m v m W � m � m �' m � '��n' � m � m a U � U ¢ U ¢ U Q U¢ U� F � O h F � F �" �" �" O pa '� F '" �" `" `" F U F U F U � � � � z � o * � � a� F w x � � ph >� o z ��� x�' �F x � � � �> x F ¢ � w � Q F O A � H v a 0 U � z ca � � � � � � .� � � s � . W N � � � � .� .� p 3 � O U C. O � � Q 3 0 � p � � •� w � � 0 � � � � � � P. � � � .. , "� � O p 3 �� � o � � O `� M A � 3 � O O � � � o � z �, * C7 � � Y S N 'O O � �U N Y U 3 � � � � � � O � ov .1: a.+ h � � � � � � �' U O U a. s�. � � � � y o � -.� T � -o a. � o Y .�"� � � o ° ' c�. N .-. '� �3 � ti U� � "' � � � 3 �� v� � 3 � � U � � � � T � � �y, Q � bA A " �� � o � � 3 � � S." � � U O � � a � � City of Saint Paul Department of Public Works Right-of-Way Rates Proposed 2009 Rates (1/1/2009 - 12/31/2009) Cucrent Pemut Twe 2008 Pazking Lane Fee (per day) Not Downtown Downtown Pazking Meter Fee Dnving I.ane Fee (per day) Detour Distance Detour Rate Sidewalk Blvd Fee (per 20 foot increments) Not Downtown Downtown Alley Fee (per day) Detour Distance Detour Rate Hooding Chazge (per day) Pazking Meter Fee New Construction Fee Base Fee Base Fee - Arterial Streets Pemut Rate (per day) Utility OH Fee Base Fee - Residential Sheets Base Fee - Arterial Streets Utility Rate (per foot, first 25' free, digging) Utility Rate (per foot, first 25' free, no digging, new) Ufility Rate (per foot, first 25' free, no digging, existing) Parhal Alley Fee (per day) Not Downtown Downtown House Service Fee Base Fee - Residential Streets (per connection, up to 6) Base Fee - Arterial Streets (per connection, up to 6) Addirional Connection Rate - Residential Streets (after 6) Additional Connection Rate - Arterial Streets (after 6) Geoprobe Soil Bore Fee Base Fee - Residential Streets Base Fee - Arterial Sh'eets Hole / Device Rate 5.00 10.00 4.00 0.15 0.485 5.00 10.00 0.15 0.485 4.00 164.00 244.00 34.00 164.00 244.00 236 0.58 0.13 5.00 10.00 164.00 244.00 64.00 144.00 164.00 244.00 13.00 Proposed 2009 6.00 11.00 5.00 0.15 0.585 6.00 11.00 0.15 0.585 5.00 180.00 268.00 37.00 180.00 268.00 2.60 0.65 0.15 6.00 11.00 180.00 268.00 70.00 158.00 180.00 268.00 14.00 D� -la-� c.{ Percent Chanae 20.00 % 10.00 % 25.00 % 0% 20.62 % 20.00 % 10.00 % 0% 20.62 % 2'S.00 % 9.76 % 9.84 % 8.82 % 9.76 % 9.84 % 10.17 % 12.07 % 1538 % 20.00 % 10.00 % 9.76 % 9.84 % 938 % 9.72 % 9.76 % 9.84 % 7.69 % Use-of-Street Pernut Rates Proposed 2009 Page 1 of 2 10/3/2008 City of Saint Paul Department of Public Works Right-of-Way Rates Proposed 2009 Rates (1/1/2009 -12/31/2009) C�trent Permit Twe 2008 Wueless Comm Fee Base Fee - Residential Sfreeu Base Fee - Arterial Streets Hole / Device Rate Full Block Construction Fee Base Fee - Residential Streets Base Fee - Arterial Streets Permit Rate (per day) Monitor Well Fee Base Fee - Residentiat Streets Base Fee - Arteriai Streets Monthly Rate (per well) Sewer Fee Base Fee - Residential Streets Base Fee - Arterial Streeu VariousLocations (permonth) Monthly Rate Food Cart Fee (per month) Excavation Fee Base Fee - Residential Streets " Base Fee - Arterial Streets Utility Rate (per foot, first 25' free, digging) Utility Rate (per foot, 5rst 25' free, no digging new) Utility Rate (per foot, first 25' free, no digging, existing) Obs�ucrion Fee Monitoring Well Monthly Rate Various Locations MonThly Rate Transportation Fee Base Fee Yealry Fee Meter Fee Labor Rate (per half hour) Benches, Cbairs, Tables, Fences and Planters Related to Sidewalk Cafes (April lst fluu October 31st) 164.00 244.00 13.00 164.00 244.00 34.00 164.00 244.00 24.00 64.00 144.00 100.00 30.00 164.00 244.00 236 0.58 0.13 24.00 100.00 25.00 120.00 36.00 Proposed 2009 180.00 268.00 14.00 180.00 268.00 37.00 180.00 268.00 26.00 70.00 158.00 110.00 33.00 180.00 268.00 2.60 0.65 0.15 26.00 110.00 28.00 132.00 �111 50.00 Percent Chan¢e 9.76 % 9.84 % 7.69 % 9.76 °/a 9.84 % 8.82 % 9.76 % 9.84 % 833 % 938 % 9.72 % 10.00 % 10.00 % 9.76 % 9.84 % 10.17 °/a 12.07 % 15.38 % 833 % 10.00 % 12.00 % 10.00 % il.11 % New Use-of-Street Permit Rates Proposed 2009 Page 2 of 2 10/3/2008 City of Saint Paul Interdepartmental Memorandum To: Margazet Kelly, Finance Director 08 -�a-a� From: Chris Eitemiller, Sr. Budget Analyst� Subject: Increase to Right of Way Pernut fee in Traffic Fund—requires public hearing Date: October 10, 2008 The attached resolution would ailow the Public Works department to increase the "Excavation/ Obstruction" permit fee structure. This fee covers the City's costs (for administration, inspection and records) associated with sidewalk degradation, obstruction (dumpsters, oversized vehicles, etc.) and disruption associated with Right of Way roadwork. This fee is updated annually to reflect the anticipated workload for the coming year. A public heazing is required to increase this fee. It will be on the agenda November 5` This proposal seems reasonable, I recommend signing. AA-ADA-EEO Employer