Council File No. 202039 —
In the matter of the assessment of
benefits, cost and expenses for grading
and surfacing with bituminous material
the alley in Block '12, Sylvan Park
Addition, from Palace Ave. to Jeffer-
son Ave., also constructing storm sewers
CITY OF ST. PAUL in the alley from a point 90 ft. south
of Jefferson Ave. to the existing sewer
in Jefferson Ave. and from 50 fggt. north
Ratifying Assess in PalaceAAve under preliminary
Order 186.700, Intermediary Order 18785,4
Final R $�r�1882�5 N� �• -
benefits, cost and expenses for
grading and surfacing with bituminous-',material the, alley in-Block 12, Sylvan Park
Addition, from Palace Ave. to Jefferson Ave.., also constructing storm sewers in
the alley from a point 90 ft. south of Jefferson Ave. to the existing sewer in
Jefferson Ave. and from 50 ft, north of Palace Ave. to the existing sewer in
Palace Ave.
under Preliminary Order..._ 1867QQ......... Intermediary Order...... 18785-4 ......., Final Order .... JM265........ ,
approved .......... _ 113-Y - ......... -- ....... 19..5$..
A public hearing having been had upon the assessment for the above improvement, and said assessment
having been further considered by the 'Council, and having been considered finally satisfactory, be it therefore
RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same
is hereby ordered to.be submitted to the District Court of the County of Ramsey for confirmation.
'BE IT FURTHER RESOLVED, That the said assessment be and it is hereby determined to be payable
1n_----- _ -• - -- ......... equal installments.
Adopted by the ConnciL ........... MAi .. . ..9g1
s
MAY 1 fl
Approved ......... — - - - ------- 19W ------------- 19-- " - - - - --
Form B. B. 18
File 11+048
a
1 (0
.... - ... _ .............. — ........ 19......... r
4 .... _ ........_..... 'iry Clerk.
w
�_.. ... - - -- -- ---- - -• - -- ... .............
,Mayor. '
1PUBUSHEI) — 1
s._
CITY OF ST. PAUL
OFFICE OF THE COMMISSIONER OF FINANCE
Report of Completion of Assessment
In the matter of the assessment of
202039
April 13, 19 61
benefits, cost and expenses
grading and surfacing with bituminous material the alley in Block 12, :..Sylvan Park
Addition, from Palace Ave. to Jefferson Ave., also constructing storm sewers in
the alley from a point 90 ft. south of Jefferson Ave. to the existing sewer in
Jefferson Ave. and from 50 ft. north of Palace Ave. to the existing sewer in
Palace Ave. 186 00 March 25 1958
under Preliminary Order 7 , approved
Intermediary Order 187854 , approved June 10, 1958
Final Order 188265 , approved July 8, 1958
To the Council of the City of St. Paul:
for
The Commissioner of Finance hereby reports to the Council the following as a statement of the ex-
penditures necessarily incurred for and in connection with the making of the above improvement, viz:
Cost of construction . ............................... $5,485.95
Engineering ........ ..............................$ 528.23
Inspection fees ...... ..............................$ 53.88
Postal cards ......... ..............................$ 3.15
Publications ........ ..............................$ 31.50 _
Court costs for confirmation ........................ $ 3.15
Total expenditures ....... ......................$6,105.86
Said Commissioner further reports that he has assessed and levied the total amount as above ascer-
tained, to -wit: the sum of $ 6,105.86 upon each and every lot, part or parcel of land deemed
benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; that the said assessment has been completed, and that hereto attached,
identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as
completed by him, and which is herewith submitted to the Council for such action thereon as may be
considered proper.
2M 12 -62 g Commissioner of Finance.