206743I
0
_N
`.&SOLUTION RATIFYING
ASSESSMENT
Council File No.. N'le No. 206743—
W
1',iatter of the ass 206743
�tlf, and &pens
'restorir , -- - "'i b-3' '
1"'t, i . i,
j3y ........................................................ a,"
CITY OF ST. PAUL
Resolution Ratifying Assessment
In the matter of the assessment of benefits, cost and expenses
for
constructing,or restoring of sidewalks and work incidental thereto: Contract 59-M-187,
District No. 21 Levy No. 5,
lor A
0*00, UAW)a Am* ii to% fA40.0; u st* t4, Voi
both I'll 300244 AW # to stmet
$1.0. 391-Wt %U�b Stroot,4 cost Aw,;�.ftw .4 M'a O&th -to tw 404.M.- :
&Ikftb U40 01 z", 160 M_ M14 X00, Iuldy,4, & hdwrumoo Md*so
V44 194r;S &W$ AM** 06M WPA 00 *VM. auiwt 0 11w4batm'st*
&=t 41400 ft= AIM$ Sttftt to- Vhlaoo Ave*�
ftM ft% ftxkvgW tO OWWAAmw
000i IV427 AzWtrM18 AW,4 tOfA gUlOr trM. *PWdM AvO� to Owtut
V404, 392zo St- CWi A"ti e'1 b0% a&tO; 9M $U_ r4ow 00 ip to 0"a St
M-15M. 383M t
RA
Uiaj*. ft-w M6"m sU -MU
tot, t�*, jUc . Wt&r ft
W'"M Ot C"t 4140$ - Aft &Z*O Suva +4 W40 Au�
boih awbo fXW WrV16V AM; to gowu oto
MUSUOISA"14 beth rim
AWAP, � OidwU6 Ave# to, aftVat
Uneblu. AW04" Wth 1pu3do rzo W0011• otil to ". Kar, AV*;.
tuton strwil- e30.41do* ftma 4WA AVaik, ftj
, tha
mrth UnI6 a r4t 164, Wbo%,.z0* aa2a 4 W46ztopaqv
AOUtim.
AUW-Ug .10i t"Oe' bmt oldaq� trio- CM6901WA AVa. ► to, X=Otu 6t
Clerk.
APR 111962
Approved------------------------------------------------------ 19 ........
..............
FormB. B. 18 ..... ....... .. .. . ... . . .......................... Mayor.
lb
,% If li
_ J• _ 67
CITY OF ST. PAUL
` - -• \� OFFICE OF THE COMMISSIONER OF FINANCE F20631
Report of Completion of Assessment
March 13, 1
FiRal- 9rder----------------------------- - - --- ----------------------------- - - - - --
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports to the Council the following as a statement of the ex-
penditures necessarily incurred-for and in connection with the making of the above improvement, viz:
Cost of construction . ............................... $15,405.39
Engineering ........ ...... .......................$
Inspection fees...... ......� .......................$ 770.26
Postal cards ............................ ..........$ U-55
a
Publications ........ ..............................$ 115.50
Court costs for confirmation ........................$ 11.55
Total expenditures ............. .... ..... $16 , 314 * 25
Charge to 31 -E -1, $300.34, Non - Assessable, $51+1.73, Net Assessment, $15,472.18
Said Commissioner further reports that he has assessed and levied the total amount as above ascer-
tained, to -wit: the sum of $ 16,314.25 upon each and every lot, part or parcel of land deemed
benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; that the said assessment has been completed, and that hereto attached,
identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as
completed by him, and which is herewith submitted to the Council for such action thereon as may be
considered proper. �
2M 12 -62 g
Commissioner of Financ .