Loading...
205487Council File No -- -------------------------------- c By-------------------------------------------------------- Resolution In the matter of the assessment of 2,0- 487 CITY OF ST. PAUL r Ratifying Assessment benefits, cost and expenses) grading and surfacing with bituminous material the alley in Block 5, University Subdivision of Lots 1, 2, 3 and 8 Hyde Park, from Chatsworth St. to Oxford St. for rile No. 205487- - � v matter of the' assessmer: cost and expenses for gr2 icing with bituminous ma in Block 5, University u. gin' ?f .Lots 1, 2,' 3 and 8 ;t. n Chatsworth St. to 0 '►14, P ',elizi nary Order it „,,;t )Fjs: 189028; Flna;;, .fi;_'.;t,�a� ember 18, c 18 1 1 V, %fff 20- under Preliminary Order .............I........... Intermediary Order...... 189.628........, Final oOrder :r`1. 65D........ . approved .......... _._ November A public hearing having been had upon the assessment for the above improvement, and said assessment having been further considered by the Council, and having been considered finally satisfactory, be it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation. BE IT FURTHER RESOLVED, That the said assessment be and it is hereby determined to be payable in .......... .............equal installments. JAN 10 1962 Adoptbdby the Council ----------- - ............. _.: ------------ .._ -------------- -- ------------ 19......... JAN 10 1962 Approved------------------------- ------------------------- ----19 Form B. B. 18 File 14234 I� I Mayor. .......... - .. - -- _ , -a r - I CITY OF ST. PAUL 87 OFFICE OF THE COMMISSIONER OF FINANCE Report of Completion etion of Assessment _P6�5' P P December 12, 19 61 In the matter of the assessment of benefits, cost and expenses grading and surfacing with bituminous material the alley in Block 5, University I Subdivision of Lots 1, 2, 3 and 8 Hyde Park, from Chatsworth St. to Oxford St. under Preliminary Order 189171 , approved September 16,_1958 Intermediary Order 189628 , approved Octbbe � 21, 1958 t Final Order 189950 , approved November 18� 1958 To the Council of the City of St. Paul: for The Commissioner of Finance hereby reports to the Council the following as a'statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction . ............................... $ 3 , 609.90 i Engineering .............. ........................$ 357.02 i Inspection fees ...... ..............................$ I Postal cards ......... ..............................$ 4.50 4500 Publications ........ ..............................$ .— Court costs for confirmation ........................ $ 4 Total expenditures .............................$ 4,020 Said 'Commissioner further reports that he has assessed and levied the total a7ount as above ascer- tained, to -wit: the sum of $ 4,020.92 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of laid in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. S;Z/� 2M 12 -62 QP0.8 Commissioner of Fin e. FI