Loading...
206018}F, , Council File No. 206018 —By Milton a� �' Rosen— ' VS0 ! 8 ORIGINAL TO CITY CLERK ` Whereas, By Council File No. 205702, 2. CI'i' h y proved January 25, 1962, the City COUNCIL - jin )uncil approved plans and specifi- FILE NO. - OFFICE ry` tions for the Riverview Storm Water YL lief Sew ^r, Contract I, Phase I; and • COU CIL RESO'�'�TIhP,roas, i �r!7�r to accomplish the ^ n` -ai, :'sa ^c ;�y said pl,zis and c Jfc ri (i3: _ ^lost ec( �mical PRESENTED BY : ib Y- �yf "'!d9tiT .:� .f : '.I + 'Jt hr! > °t,�ome COMMISSIONS "�� ri ,ME[ .9Y. cif �br O 3s! f WHEREAS, by Council File No. 205702, approved January 25, 1962, the City Council approved plans and specifications for the Riverview Storm W ater Relief Sewer, Contract I. Phase I; and WHEREAS, in order to accomplish the work con- templated by said plans and specifications in the most T economical and efficient manner, it has become'necessary to amend certain portions of the special provisions of the aforementioned plans and specifications, and all bidders have been sent a copy of Addendum No. 1 relating to said special provisions and their amendment; NOW, THEREFORE, BE IT RESOLVED,thp action of the City Engineer and of the Department of Public Works in draft- ing and transmitting the hereto attached Addendum No. 1 to all interested parties and so amending the special provisions of the aforementioned plans and specifications, it is hereby ratified, approved and authorized. FEB 2 0 196, COUNCILMEN Adopted by the Council 19— Yeas Nays EB 2 0 1962 Holland Approve 19— Loss In Favor Mortinson ,fffro Mayor Rosen Against � resident, Vavoulis ,/' r ISM 5•e0 QW2 ` V CITY OF SAINT PAUL �f - • Department of Public 1.1orks 234 City Hall & Court House St. Paul 29 Minnesota ®oV February 13, 1962 Dear Sirs I Enclosed is Addendum No. 1 to the Special Provisions for the Riverview Storm Water Relief Sewer, Contract I, Phase 1. All bidders must acknowledge receipt of this addendum by return mail prior to February 20, 1962, the bid opening date. Yours-very truly, EUGENE V. AVERY Chief Engineer I i i L i CITY OF SAINT PAUL DEPARTMENT OF PUBLIC WORKS RIVERVIEW STCRM WATER RELIEF SEWER CONTRACT I, PHASE I City Contract No. 62 -S-954 40� The Special Provisions for the foregoing Contract, be received February 20, 1962, are revised as follows: SECTION 33 - 36 INCH DIARETER CAgM- PIPES FOR DROPSHAFTS February 13, 1962 for which bids will S E (Delete the second sentence and substitute the following:) The outside diametdr of'the casing pipe shall be 36 inches. (Add the followings�i SECTION 40_)- USE OF PRECA, T SEMION2 IN SOLIDS MOCK Sections E. or,F, Drawing No, 2714 and 2715 be accepted as an alternate for Section- A.should the Contractor desire to build the entire 6°-0" and 50-0" tunnels using precast concrete pipe sections. Also 70-0" diameter R.C.P.'or 70-0" equivalent Inner Circle.pipe will be accepted as an alternate for the tunnel' section shown on Drawing No. 2716 should the Contractor •desire •to build the 71-0" diameter tunnel using precast pipe sections. 60-0" and 7 ° -0" diameter circular concrete pipe sections used for tunnel- ing in solid sandrock shall be Class I with 5000 psi concrete in accordance with ASTM Designation C76 -59T. Inner Circle precast sections of 61-0" and 70-0" equivalent sizes$. Where-used in solid sandrock, shall be manufactured with sufficient steel -and_ concrete strength to conform to strength requirements for Class II equivalent circular pipe in accordance with ASTM Designation C76 -59T. Where 5b-0." diameter precast.pipe sections are used as an alternate for Section A. Drawing No. 2714 the pipe shall be Class V in accordance with ASTM Designation 'C76 505. Inner circle pipe used as an alternate for-'Section' A,. ,Dravying No. 2714 shall be manufactured with sufficient'steel and concrete to conform to strength requirements for Class'V R.C.P. Where Inner Circle pipe is eised in solid sandrock a'shi6ld will not be required: Voids outside the pipe shall be filled with sand and the entire length of tunnel shall be grouted to completely fill all voids outside the pipe, however it will not be required that grouting be done after each day's tunneling progress as required in glacial drift. Where circular concrete pipe sections are used to line the tunnel in solid sandrock it will not be required that a shield be used as described for building the tunnel in glacial drift. The Joints shall.be made using RAM NEI; as described for tunnel in glacial drift. All voids outside the pipe shall be grouted.;