Loading...
206017Council File No. 200017 —By Milton 1 Rosen— ORIGINAL TO CITY CLERK � Whereas Additions and Deductions {� 0 a 1'',� 7 which might prove to. be necessary COUNCIL li y in the Improvement described as the } FILE NO. OIINEBRASKA -HOYT STORM SEWER ISYSTEM, Comptroller's Contract L- COUNC�:6230, Beatson and i{el>,y, contractors. FORM have been provioc'Vfo� th the Sped flcations. and -• �– ' PRE %ENTED BY WW,c:e:'n I�•i'ro{ . ; ;� CO t r .; + ",hi;, v�ctr;t u:�•:. F FEBRUARY 19,, 1962 of 4ice= ?.R •Z� 7' WHEREAS Additions and Deductions which might prove to be necessary in the Improvement described as the NEBRASKA -HOYT STORM SEWER SYSTEM, Comptroller's Contract L -6230, Beatson and Kelly, contractors, have been provided for in the Speci- fications, and WHEREAS, it has been found necessary to make the following Additions and Deductions, as per the attached sheets of quantities, explanation items and prices : TOTAL ADDITIONS . . . . . . . . . 5,892.75 TOTAL DEDUCTIONS 41621j..41 NET ADDITIONS TO CONTRACT 1,268.314, and WHEREAS, the total net Addition id 1,268.3 1, now, therefore be it RESOLVED, that the City of 6t. Paul, through it's City Council approved the foregoing Addition made in accordance with the Specifications in the sum of $ 1,,268.34, said amount to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L -6230 for the making of the above ImproverBnt, and which amount is to be charged to the Local Improvement Fund 31E -1. The Commissioner of rublic Works has agreed with the above named contractor that the sum. of $ 11268.34 is the cor- rest amount to be added to the above Contrac FEIB 2 0 1962 J COUNCILMEN Adopted b the Council 19— p Y Yeas Nays � E g 201962 P mfey — Holland Approved 19— Loss In Favor Mortinson _ _ "' , Mayor Detepsen __s�� Rosen ainst bM 5 -e0 oWo2 , (IBL iSM s � u r Additions to Contract P4 r , Construct 7" Cone. Base (HE -AE), 2" Asph. Cone. Surface & Gravel Subbase 457.27 20 Sq. Yds. 0 7.35 = $147.00 12" pipe connection to main sewer including excavation for catch basin No. 1 -A, 3 -A, & 1 -AA 22 Lin..Ft.• ® 4.00 = 88.00 12" pipe connection to main sewer including excavation to main sewer for catch basin No's 2 -A, 4-A, & 5 -A 119 Lin. Ft. @ 3.75 = 446.25 Construct 4 -A Catch Basin 20 Each @ 110.00 = 2200.00 Construct #538 Catch Basin 1 Each ® 175.00 = 175.00 Adjust Catch Basin 1.5 Lin. Ft. 6 15.00 = 22.50 Construct Man Hole 41 deep 1 Each 0 167.50 = 167.50_ Construct Man Hole 4' (old cover & ring) 1 each 0 89.50 = 89.50 Construct Man Hole 5' 1 each @ 145.00 = 145.00 Construct Man Hole 8' 1 each @ 190.00 = 190.00 Excavation in trench less than 12t deep 36.55 Cu. Yds.a 3.50 = 127.93 F. & I. 12" Vit. Clay Pipe 7 Lin. Ft. 0 1.46 = 10.22 F. & I. 12" Vit. Clay 1/8 bands 2 Each ® 4.88 = 9.76 Concrete Class B in Place 6 Cu. Yds. 4 45.00 = 270.00 Furnish 8" C. I. pipe 22 Lin. Ft. ® 5.86 = 128.92 F. & I. 15" Vit. Clay Pipe 28 Lin. Ft. 0 2.33 = 65.24 F. & I. 15" Reinforced Cone. Pipe 34 Lin. Ft. ® 2.79 = 94.86 Relocate Water Main on Chelsea between Nebraska & Arlington Shovel 37 Hrs. 0 17.00 = 629.00 Traxcavater 14 Hrs. ® 13.00 = 182.00 Modify existing drop manhole to allow passage of 18' sewer at Hoyt & Chelsea = 60.00 Lower & reconstruct sanitary sewers at the following locations on Pascal St. between M.H. 47 & 34, Nebraska & Huron, Iowa & Dunlap Foreman 6 Hrs. @ 4.50 = 27.00 Shovel Operator 17 Hrs. @ 3.86 = 65.62 Oiler 17 Hrs. 4� 2.98 = 50.66 Pipe Layer 17 Hrs. ® 3.28 = 55.76 Laborers 46 Hrs. ra 3.15 = 144.,70 Wages Paid 343.94 Workman's compensation, public liability & property dam. (13 %) = 44.71 Overhead & profit (15 %) = 58.30 Social Security Tax (3%) = 10.32 457.27 i �• 2107 including 4 e• excavation for side inlets Removal of concrete slab in intersection of Montana & Lexington @ 3.25 due to voids under slab. a r sewer 158.5 Lin.Ft. Compressor operator 7 Hrs. @ 3.25 = 22.75 Laborer Additions to Contract (continued) to No. 1 -AA catch basin Dr. 2107 including 4 excavation for side inlets Removal of concrete slab in intersection of Montana & Lexington @ 3.25 due to voids under slab. 12" Vitrified clay pipe sewer 158.5 Lin.Ft. Compressor operator 7 Hrs. @ 3.25 = 22.75 Laborer 21 Hrs. @ 3.15 = 66.15 = 708.75 Construct 1 AA C. B. 88.90 Workman's compensation t public liability & property damage (13 %) = 11.56 Overhead & profit (15 %1 4 Each = 15.07 Social Security Tax 0%) Modify 4A C. B. = 2.67 Compressor 7 Hrs. 4.00 = 28.00 Truck 7 Hrs. (; 5.80 = 40.60 186.80 Total Additions = 5892.75 Deductions to Contract 12" pipe connections to No. 1 -AA catch basin Dr. 2107 including excavation for side inlets 173 Lig. Ft. @ 3.25 = 562.25 12" Vitrified clay pipe sewer 158.5 Lin.Ft. e 1.40 = 231.41 Earth excavation to a depth of 121 202.5 Cu.Yds. ig 3.50 = 708.75 Construct 1 AA C. B. 8 Each @ 150.00 = 1200.00 Construct S. I. 4 Each @ 50.00 = 200.00 Modify 4A C. B. 18 Each 8 56.50 = 1017.00 Construct Man Kole: 11' Deep 1 rg 235.00 = 235.00 121 Deep 1 @ 250.00 = 250.00 101 Deep 1 @ 220.00 = 220.00 Total Deductions = 4624.41 9 I t: Additions to Contract '206 j � c 'l�►'1.�iJ -17 Construct 7" Conc. Base.(HE -AE), 2" Asph. Conc. Surface & Gravel Subbase 20 Sq. Yds. ® 7.35 = $1,47.00 S 12" pipe connection to main sewer including excavation for catch basin No. 1 -A, 3 -A, & 1 -AA 22 Lin. Ft. ® 4.00 = 88.00 12" pipe connection to main sewer including excavation to main sewer for catch basin No's 2 -A, 4 -A, & 5 -A 119 Lin. Ft. @ 3.75 = 446.25 Construct 4 -A Catch Basin 20 Each Q 110.00 = 2200.00 Construct #538 Catch Basin 1 Each ® 175.00 = 175.00 Adjust Catch Basin 1.5 Lin. Ft. @ 15.00 = 22.50 Construct Man Hole 6J' deep 1 Each ® 167.50 = 167.50 Construct Man Hole 4J' (old cover & ring) 1 each 4� 89.50 = 89.50 Construct Man Hole 5' 1 each @ 1-45.00 = 145.00 Construct Man Hole 8' 1 each ® 190.00 = 190.00 Excavation in trench less than 12' deep 36.55 Cu. Yds.® 3.50 = 127.93 F. & I. 12" Vit. Clay Pipe 7 Lin. Ft. ® 1.46 = 10.22 F. & I. 12" Vit. Clay 1/8 bands 2 Each ® 4.88 = 9.76 Concrete Class B in Place 6 Cu. Yds., ® 45.00 = 270.00 Furnish 8" C. I. pipe 22 Lin. Ft. ® 5.86 = 128.92 F. & I. 15" Vit. Clay Pipe 28 Lin. Ft. @ 2.33 = 65.24 F. & I. 15" Reinforced Conc. Pipe 34 Lin. Ft. @ 2.79 = 94.86 Relocate Water Main on Chelsea between Nebraska & Arlington Shovel 37 F.rs. 4 17.00 = 629.00 Traxcavater 14 Hrs. 8 13.00 = 182.00 Modify existing drop manhole to allow passage of 181 sewer at Hoyt & Chelsea = 60.00 Lower & reconstruct sanitary sewers at the following locations on Pascal St. between M.H. 47 & 34, Nebraska & Huron, Iowa & Dunlap Foreman 6 Hrs. @ 4.50 = 27.00 Shovel Operator 17 Hrs. @ 3.86 = 65.62 Oiler 17 Hrs. @ 2.98 = 50.66 Pipe layer 17 Hrs. ® 3.28 = 55.76 laborers 46, Hrs. @ 3.15 = 144.70 Wages Paid = 343.94 Workman's compensation, public liability & property dam. (13 %) = 44.71 Overhead & profit (15 %) = 58.30 Social Security Tax (3 %) = 10.32 457.27 i r ions (continued) Removal of concrete slab in intersection of Montana & Lexington to No. 1 -AA catch basin Dr. due to voids under slab. 7 Frs. (9 3.25 = 22.75 Compressor operator 21 Yss. 4 3.15 = 66.15 Laborer 3.25 = 562.25 88.90 Workman's compensation, public liability & property damage (13 %) = 11.56 Overhead & profit (15 %) 231.41 = 15.07 Social Security Tax (3 %) 202.5 Cu.Yds. = 2.67 Compressor 7 Frs. 4.00 = 5.80 = 28.00 40.60 Truck 7 Frs. L 150.00 = 1200.00 186.80 Total additions = 5892.75 Deductions to Contract 12" pipe connections to No. 1 -AA catch basin Dr. 2107 including excavation for side inlets 173 Lin. Ft. 4 3.25 = 562.25 12" Vitrified clay pipe sewer 158.5 Lin.Ft. �W) 1.40 = 231.41 Earth excavation to a depth of 12' 202.5 Cu.Yds. G 3.50 = 708.75 Construct 1 AA C. B. 8 Each & 150.00 = 1200.00 Construct S. I. 4 Each @ 50.00 = 200.00 Modify 4A C. B. 18 Each 56.50 = 1017.00 Construct Man F.ole: 11' Deep 1 C 235.00 = 235.00 12' Deep 1 e 250.00 = 250.00 10' Deep 1 t6 220.00 = 220.00 Total Deductions = 4624.41 OFFICE'OF THE COMMISSIONER OF FINANCE ` —St- Paul -2, Minn.; February 2. 1962 •• You are hereby notified that the Councd7o Y the City of St. Paul will _ cocider• the matter of - application -of Knowlan 1 s Super ' Markets, Inc. 688 Hague Ave. for permit to enlarge an existing parking lot to 34 parking spaces. Property ; located at Northeast corner of Hague and St. Albans Sts. and that a public hearing will be held in the Council Chambers of the Court House and City Hall Building in the City of St. Paul, at 10:00 o'clock A.M. on February 15, 1962 I • BERNARD T. HOLLAND File 15549, Wage 1 Commissioner of Finance. The City Charter requires this Notice be sent from the Department of Finance.