208430ORIGINAL TO CITY CLERK
CITY OF ST. PAUL
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION - GENERAL FORM
PRESENTED BY
COMMISSIONER Milton Asen DATP
2 A'3Q
FILE ILCIL NO. _
WHEREAS, It has been found necessary to change, modify and amend
certain portions of the plans and specifications heretofore approved
for the construction'of a new ornamental lighting system on NINTH STREET
from St. Peter Street to Wabasha Street; on EIGHTH STREET from ITabasha
Street to North Robert Street (City Contract No. 62 -M -265) as approved
July 25, 1962, by Council Resolution C.F. No. 208320, now therefore upon
the recommendation of the Commissioner of Public Works be it,
RESOLVED that the plans and specifications for the above named
improvement, as approved by the Council, be and the same are hereby
changed, modified and amended in accordance with Addendum No. 1, which
is attached to and made a part of this Resolution and of the afore-
mentioned plans and specifications, and that further all interested
parties be notified of this addendum.
COUNCILMEN
Yeas DAL('LISH Nays
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
5 M 6-61
Council File No. 208430 —By Milton
Rosen —
Whereas, It has been found necessary
to change, modify and amend certain
portions of the plans and specifications
heretofore approved for the construc-
tion of a new ornamental lighting
system on NINTH STREET from St.
Peter Street to Wabasha Street; on
EIGHTH STREET from Wabasha Street
to North Robert ,Street (City Contract
No. 62 -M -265) as approved July 25,
1962, by Council Resolution C. F. No.
208320,'now therefore upon the recom-
mendation of the Commissioner of
Public Works be it,
Resolved, That the plans and specifi-
cations for the above named improve-
ment, as approved by the Council, be
and the same are, hereby 'changed,
modified and amended in accordance
with Addendum No. 1, which is at-
tached to, and made �a part of this
Resolution and of the ' aforementioned
plans and Specifications, and that fur-
ther all interested ,parties be notified
of this addendum.
Adopted by the Council August 1,
1962.
Approved August 1, 1962.
(August 4, 1962)
WG 11962
Adopted by the Council 19
Ain 119
Approved 19—
In Favor
Mayor
Against
y ,
2,(,84noo
CITY OF SAINT PAUL
DEPARTMENT OF PUBLIC WORKS
C tv Contract 62mI��.26g
Construction of a new ornamental lighting system on NINTH STREET from
St. Peter Street to Wabasha Street; on EIGHTH STREET from Wabasha Street to
North Robert Street.
ADDEND NO. 1
AREAWAYS, COAI�HOLES AND ZAP-DOORS
In various locations the contractor will encounter subterranean structures
where it will not be possible to construct or install lighting conduit and bases
in the normal manner described in the specifications. When areas of this type
are encountered it will be necessary to make the following changes.
Lish�t Bases. When it is found necessary to install a light base in an
areaway or other subterranean structure the base will be constructed to the
full depth of the area encountered. When it is found that no satisfactory
foundation exists for the extended base it will be necessary to excavate one
foot in depth and the same area of the base and extend the base the additional
one foot. Reinforcement shall consist of four vertical No. 4 deformed bars
installed 12 inches on center in the form of a square and shall be tied with No.
4 hoops placed 12 inches on center.
The approximate number of light bases that will be encountered is estimated
to be ten and the average depth is estimated to be approximately 12 feet.
C ns.dM t. When it is not possible to install conduit in the normal manner
as outlined in the specifications the contractor shall fasten the conduit to the
subterranean structure wall to the satisfaction of the Chief Engineer. The
location of this conduit shall be within eighteen inches from the ceiling or
roof of such structure.
The length of conduit that will be installed in this manner is estimated
to be approximately 715 lineal feet.
= --BMe_s• When the location of pull boxes are such that they fall within
the area of subterranean structures they will be moved to the closest area where
there is a firm base existing and installed to the satisfaction of the Engineer.