COUNCIL RESOLUTION — GENERAL FORM Resolved, That an extra in the
amount of $9,889.00 be allowed under,.,
PRESENTED BY Frank L. Loss ='� Aract No. G -3152 between thefCft-•'
COMMISSIONER 4414_ DATE Saint Paul and the Loverink'Co- r
said pontrac, -
o I and •M^
RESOLVED that an extra in the amount of $9,869'.00 be allowed
under Contract No. G -3152 between the City of Saint Paul and the
Lovering Construction Company, said contract for General, Electri-
cal and Mechanical Construction of the Civic Education Building,
Saint Paul, and said extra to cover certain changes as follows:
A. Changes in concrete and form work and cement finish -
1 For the steps and seating areas $1,718.00
2 For the adjacent grid areas 5 3/4 to 6% and
9% to 9 3/4 858.00
3 Winter protection and temporary heating for
the forming, placing and curing concrete and
cement finish in above areas 657.00
B. Changes in the stage elevation, etc.
1 Changes in the stage elevation and structural
supports thereof 3,507.00
2 Changes in the turntable 480.00
3 Changes in stage subfloor and addition of re-
movable steps 1,277.00
Contractor's overhead and profit 15% 8;497.00
1,275.00
Increase in surety bond premium 97.00
$9,869.00
This work was requested.by the Commissioner of Libraries, Auditorium
And Civic Buildings and agreement made with the contractor, and
a memorandum of said agreement filed with the comptroller and
countersigned by him.
Approved
ity Com t �11 r
1
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M- 8-82
r
Nov 7 A963
Adopted by the Council 19—
Ap
In Favor
Against "
lAb-o
I;
r`
NOV 7 X963. 19—
Mayor
DUPLICATE TO PRINTER � •
CITY OF ST. PAUL COUNCIL p
OFFICE OF THE CITY CLERK FILE NO. _
COUNCIL RESOLUTION— GENERAL FORM
PRESENTED BY prank L. Loss
COMMISSIONER DATE
RESOLVED that an extra in the amount of $9,869.00 bL
under Contract No. G -3152 between the City of Saint Paul h
Lovering Construction Company, said contract for General, E.
cal and Mechanical Construction of the Civic Education Build:,
Saint Paul, and said extra to cover certain changes as followss
A. Changes in concrete and form work and cement finish -
1 For the steps and seating areas $10718.00
2 For the adjacent grid areas 5 3/4 to 6Y2 and
9!� to 9 3/4 858.00
3 Winter protection and temporary heating for
the forming, placing and curing concrete and
cement finish in above areas 657.00
S. Changes in the stage elevation, etc.
1 Changes In the stage elevation and structural
supports thereof 3 507.00
2 Changes in the turntable 480.00
3 Changes in stage subfloor and addition of re-
movable steps 0
8,4
Contractor's overhead and profit 15% 19275.00
increase in surety bond premium 97.00
869.00
This work was requested by the Commissioner of Libraries, Auditorium
And Civic Buildings and agreement made with the contractor, and
a memorandum of said agreement filed with the comptroller and
countersigned by him.
Approved
City comptroller
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 8.82
In Favor
- b Against
Adopted by the Council 19—
Approved 19—
Mayor
Comsr. Frank L. Loss �PJ
Department of Parks And Recreation Andy
Public Buildings
RE: Civic Education Building - Job B 972
Dear Sir:
Contract No. G -3152 was awarded to Lovering Construction Co.
for General, Electrical and Mechanical Construction of the
Civic Education Building, Saint Paul.
During the course of the work under the contract, certain chang-
es were found to be desirable, and at the request of the Commis-
sioner of Libraries, Auditorium, and Civic Buildings negotiations
have been conducted with the contractor who agrees to make the
following changes for the amounts listed:
A. Changes in concrete and form work and cement finish -
1 For the steps and seating areas $1,718.00
2 For the adjacent grid areas 5 3/4 to 6% and
9% to 9 3/4 858.00
3 Winter protection and temporary heating for
the forming, placing and curing concrete and
cement finish in above areas 657.00
B. Changes in the stage elevation, etc.
1 Changes in the stage elevation and structural
supports thereof 3,507.00
2 Changes in the turntable 480.00
3 Changes in stage subfloor and addition of re-
movable steps 1,277.00
8,•497.00
Contractor's overhead and profit 15% 1,275.00
Increase in surety bond - premium 97.00
$9,869.00
This is a reasonable amount for the labor and material involved and
therefore it is requested that a resolution be submitted to the
Council authorizing this extra in the amount of $9,869.00.
Yours truly,
Comsr. Mortinson Al R d H. Schroeder
CITY ARCHITECT
cv
Y-
OF SAINT
PAU'�r{
;�
Capital of Minnesota
RTMENT,.OF
`R
,�
_ E "- T-ION_
B
•�;• r; -
IC BUILDINGS
I -'�It�
.�4:.
__ ems! ��_ G �
_ � - � ,,r
�•
i�r' {.
COMMISSIONER
'H'I`L
I�P —.LPL E,I E
Repu+y Commisefdner
,s" r •,�
BUREAU OF PUBLIC BUILDINGS ALFRED H. SCHROEDER, City Architect
445 City Hall, Zone 2 CApital 4 -4612, Ext. 361
November
7, 1963
Comsr. Frank L. Loss �PJ
Department of Parks And Recreation Andy
Public Buildings
RE: Civic Education Building - Job B 972
Dear Sir:
Contract No. G -3152 was awarded to Lovering Construction Co.
for General, Electrical and Mechanical Construction of the
Civic Education Building, Saint Paul.
During the course of the work under the contract, certain chang-
es were found to be desirable, and at the request of the Commis-
sioner of Libraries, Auditorium, and Civic Buildings negotiations
have been conducted with the contractor who agrees to make the
following changes for the amounts listed:
A. Changes in concrete and form work and cement finish -
1 For the steps and seating areas $1,718.00
2 For the adjacent grid areas 5 3/4 to 6% and
9% to 9 3/4 858.00
3 Winter protection and temporary heating for
the forming, placing and curing concrete and
cement finish in above areas 657.00
B. Changes in the stage elevation, etc.
1 Changes in the stage elevation and structural
supports thereof 3,507.00
2 Changes in the turntable 480.00
3 Changes in stage subfloor and addition of re-
movable steps 1,277.00
8,•497.00
Contractor's overhead and profit 15% 1,275.00
Increase in surety bond - premium 97.00
$9,869.00
This is a reasonable amount for the labor and material involved and
therefore it is requested that a resolution be submitted to the
Council authorizing this extra in the amount of $9,869.00.
Yours truly,
Comsr. Mortinson Al R d H. Schroeder
CITY ARCHITECT