215159ORIGINAL TO, CCITY CLERK
CITY OF ST. PAUL COUNCIL NO
" OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
215.59
t
Finance Administrator, and said Administrator has approved, a Pro-
gram for Community Improvement (Workable Program) for the-com-
munity; and
n
WHEREAS the Planning Board of said City of Saint Paul which is
the duly designated and acting official planning body for the Locality
has reported to the Governing Body respecting the conformity of said
General Neighborhood Renewal Plan to the general plan for the Locality
as a whole; now, therefore, be it
RESOLVED by the City Council of the City of Saint Paul as follows:
1. That the General Neighborhood,'Renewal Plan for the area
aforementioned, having been duly reviewed and considered, is hereby
approved; that it is determined to be adequate as an outline of the
urban renewal activities proposed for the area involved, as a frame-
work for the preparation of urban renewal plans, and as an indication
generally, to'the extent feasible in preliminary planning, of land uses,
population density, building coverage, prospective, requirements for
the conservation and rehabilitation of property, and any portions of
the area contemplated for clearance and redevelopment; and that the
City Clerk be and is hereby directed to file said copy of the General
Neighborhood Renewal Plan with the minutes of this meeting.
2. That it is hereby found and determined that said-General Neigh-
borhood Renewal Plan for the urban renewal area conforms to the general
plan of the Locality and to the Program for Community Improvement.
3. That it is the intention of this Body that the General Neighbor-
hood Renewal Plan be used to the fullest extent feasible as a guide
for the provision of public improvements in such area, and that said
Plan will be considered in formulating codes and other regulatory
measures affecting property in the -area and in undertaking other local
governmental activities pertaining to the development, redevelopment,
conservation, and rehabilitation of the area.
COUNCILMEN
Yeas Nays
Dalglish
Rolland
Loss
Mortinson
Peterson
-ResaA
Mr. President, Vavoulis
10Di 8-82
In Favor
�gainst
Adopted by the Counci
OCT 22 IM
OCT 2 2 1963
9—
pprove 19— s
Mayor
DUPLICATE T4 'MINTER 2�.5�.59
CITY OF ST. PAUL COUNCIL NO. _
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATe
RESOLUTION OF THE COUNCIL OF THE CITY OF SAINT
PAUL APPROVING GENERAL NEIGHBORHOOD RENEWAL PLAN
WHEREAS, pursuant to the provisions of Title I of the Housing
Act of 1949, as.amended, the Housing and Redevelopment Authority of
the Cit of Saint Paul, Minnesota (herein called the "Local Public
Agency has has entered into a contract, designated Contract No. Minn.
R -17 (G.N.) (A), with the Federal Government pursuant to which the
Government has made available to the Local Public Agency financial
assistance for the preparation of a general Neighborhood Renewal
Plan for the urban renewal area designated as Cathedral Area in the
City of Saint,Paul, State of Minnesota (herein called the "Locality ");
Ci
WHEREAS the Local Public Agency proposes to undertake with
Federal financial assistance one or more urban renewal projects in the
above - described urban renewal area; and
WHEREAS there has been prepared and referred to the Council of
said City (herein called the "Governing Body ") for review and approval
a General Neighborhood Renewal Plan for the urban renewal area, dated
September, 1963, entitled " Cathedral Area Official General Neighbor-
hood Renewal Plan, Minn. R -17 (G.N.)," and consisting of 38 pages and
11 figures and 20 maps; and
WHEREAS said General Neighborhood Renewal Plan has been approved
by the governing body of the Local Public Agency, as evidenced by the
copy of said body's duly certified resolution approving said General
Neighborhood Renewal Plan which is attached thereto; and
WHEREAS there have also been presented to the Governing Body
certain supplementary data, including data respecting estimated grant-
in-aid requirements, relocation requirements and resources, and gov-
ernmental aetionsrrequired to carry out said General Neighborhood
Renewal Plan; and
WHEREAS a galeral plan is in existence and is recognized and
used as a guide for the general development of the Locality as a
� whole; and, also, there has been presented to the Housing and Home
Nays
In Favor
Against
Adopted by the Council 19—
Approved 19_
Mayor
DUPLICATE T� A1NTER �v V
CITY OF ST. PAUL COUNCIL NO.
OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE _-
Finance Administrator, and said Administrator has approved, a Pro-
gram for Community Improvement (Workable Program) for the com-
munity; and
WHEREAS the Planning Board of said City of Saint Paul which is
the duly designated and acting official planning body for the Locality
has reported to the Governing Body respecting the conformity of said
General Neighborhood Renewal Plan to the general plan for the Locality
as a whole; now, therefore, be it
RESOLVED by the City Council of the City of Saint Paul as follows:
1. That the General Neighborhood Renewal Plan for the area
aforementioned, having been duly reviewed and considered, is hereby
approved; that it is determined to be adequate as an outline of the
urban renewal activities proposed for the area involved, as a frame-
work for the preparation of urban renewal plans, and as an indication
generally, to the extent feasible in preliminary planning, of land uses,
population density, building coverage, prospective requirements for
the conservation and rehabilitation of property, and any portions of
the area contemplated for clearance and redevelopment; and that the
City Clerk be and is hereby directed to file said copy of the General
Neighborhood Renewal Plan with the minutes of this meeting.
2. That it is hereby found and determined that said General Neigh-
borhood Renewal Plan for the urban renewal area conforms to the general
plan of the Locality and to the Program -for Community Improvement.
3. That it is the intention of this Body that the General Neighbor-
hood Renewal Plan be used to the fullest extent feasible as a guide
for the provision of publics improvements in such area, and that said
Plan will be considered in formulating codes and other regulatory
measures affecting property in the area and in undertaking other local
governmental activities pertaining to the development, redevelopment,
conservation, and rehabilitation of the area.
lays
W 2 21963
Adopted by the Council 19-
OCT 2 2 1963
Approved 19—
Tn Favor
0 Mayor
Against
B. WARNER SHIPPEE
Executive Director
HOUSING AND REDEVELOPMENT AUTHORITY
OF THE CITY OF SAINT PAUL
Mrs. Agnes O'Connell
City Clerk
City Hall and Courthouse
St. Paul 2, Minnesota
k
Attention: Mr. Harold Riordan
Dear Mrs. O'Connell:
55 EAST FIFTH STREET
SAINT PAUL 1, MINN.
CApita 17 -7523
HAROLD J. MORIARTY
Chairman
CARL CUMMINS, JR.
PATRICK J. TOWLE
JOHN W. GREENMAN
October 16, 1963 EUGENE R. LAMBERT
Find°enclosed - a copy of the Cathedral Area General
Neighborhood Renewal Plan which is a general plan covering
Cathedral Project':I (the technical- vocation school site project)
and Projects II and III. The Plan has been approved by the
Planning Board and will be approved by the Authority on Tuesday,
October 22nd. I have provided Corporation Counsel with a form
of resolution with the request that he have a resolution pre-
pared for the Council meeting Wednesday, October 23rd. No
public hearing is required. The Authority requests that the
Plan be placed on the agenda for Wednesday's meeting for con-
sideration and approval.
The,Authority will need five certified copies of the
Council Resolution.
vZ
� :. , ^�: 4.9.•.9 i^�
Yours very truly,
James T. Hart
Staff Counsel
FE I1�it %i.[JT�F�r -ca
Ttf
F
_ ^ ^t mow' pt "--W- O "O =*-lVA -f i
z _
'ti ! t _
G i .- ' r • - r • a
HOUSING AND REDEVELOPMENT AUTHORITY
OF THE CITY OF SAINT PAUL
B. WARNER SHIPPEE
Executive Director
Honorable Mayor and City Council
c/o City Clerk
City Hall and Court House
St. Paul 2, Minnesota
Gentlemen:
October 18, 1963
55 EAST FIFTH STREET
SAINT PAUL 1, MINN.
CApital 7 -7523
HAROLD J. MORIARTY
Chairman
CARL CUMMINS, JR.
PATRICK J. TOWLE
JOHN W. GREENMAN
EUGENE R. LAMBERT
Re: Cathedral Area Official General
Neighborhood Renewal Plan
Minn. R- 17(G.N.)
Find enclosed the Cathedral Area Official General Neighborhood Renewal Plan,
copies of which have been given to each member of your Honorable Body. The
Plan is a general guideline for the undertaking of specific renewal projects
in the Cathedral Area such as Cathedral Project I, the technical- vocational
school site project, recently considered and approved by your Honorable Body.
Projects II and III proposed in this Plan would only be undertaken after con-
sideration and approval by the Council of detailed redevelopment and financial
plans yet to be developed for these projects.
This Plan represents a joint effort on the part of the Authority and its con-
sultants, the Planning Board and other interested City departments.
The Plan proposed that Cathedral Projects II and III be primarily residential
with renewal to be carried out by conservation and rehabilitation of existing
structures with partial clearance where the condition of the structure requires
its removal and for assembly of lands for public facilities such as playgrounds
and school sites. Project III contemplates some commercial use concentrated
in the vicinity of Selby and Western Avenues.
The Plan was considered and unanimously approved by the Planning Board at its
meeting of October 11th upon a finding that it was consistent with the com-
prehensive plan for Saint Paul.
The Authority respectfully requests your consideration and approval of this
Plan.
Sincerely yours,
Warner Sh p ee
Executive Director
Tit
CATHEDRAL AREA
OFFICIAL GENERAL NEIGHBORHOOD RENEWAL PLAN
MINN. R- 17(GN)
HOUSING AND REDEVELOPMENT AUTHORITY
OF THE CITY OF SAINT PAUL, MINNESOTA
SEPTEMBER 1963
0 0
TABLE OF CONTENTS
Page
PREFACE 1
a. DESCRIPTION OF BOUNDARIES OF PLAN AREA . . . . . . . . . . 4
1. Boundary Map (Map No. 1)
2. Boundary De kriptioh
3. Statement as to basis for revisions in General
Neighborhood Renewal Plan boundaries from those
shown in the Survey and Planning Application
b. LAND USE PLAN . . . . . . . . . . . . . . . . . . . . . . 5
I. Population Densities
2. Building Coverage and Other Building Requirements
3. Other provisions as to land use which should be
incorporated in Urban Renewal Plan for specific
projects in order to achieve land use objectives
c. PLAN FOR COMMUNITY FACILITIES AND PUBLIC IMPROVEMENTS 12
1. Approximate location, size and character of exist-
ing and proposed schools, parks, playgrounds and
similar facilities
2. Approximate location and general character of
existing and proposed major highways, streets,
utilities and other similar improvements
d. 1. DELINEATION OF PARTS OF AREA IN WHICH CONTEMPLATED
URBAN RENEWAL ACTION IS CLEARANCE AND REDEVELOPMENT 34
e. STATEMENT OF PROSPECTIVE REQUIREMENTS FOR REHABILITATION
AND IMPROVEMENT OF PROPERTIES . . . . . . . . . . . . . . . 39
f. IDENTIFICATION, BY TENTATIVE BOUNDARIES, OF ANTICIPATED
PROJECTS INVOLVING TITLE I AID, TOGETHER WITH CONTEMPLATED
PROGRAM OF THEIR SEQUENCE AND TIMING . . . . . . . . . . . 43
T G -7
10/20160
CERTIFICATE OF SECF.ETATZ
The undersigned hereby certifies, as follows:
;�!,,rl f i
(1) That he is the duly qualified and acting Secretary of the
Housing and Redevelopment Authority of the City of Saint Paul, Minnesota,
herein called the "Local Public Agency" and the keeper of the records of
the Local Public Agency;
(2) That the attached Resnlution No_ 63- 10/22 -3
is a true and correct copy of the Resolution No. 63- 10/22 -3
as executed on the 22nd day of October , 19 63 ;
(3) The seal affixed below constitutes the official seal of the
Local Public Agency and this Certificate is hereby executed under such
official seal;
(4) That the undersigned is duly authorized to execute this
Certificate.
IN WITNESS WHEREOF; the undersigned has hereunto set his hand
this 22nd day of October , 19 63
` c
Secretary
( S E AL )
n
MW
PAM
lilt
AP 0- � 4 _
O '
_ - dal 4 - ,j�,�'��y�`•��i,�� . -
pun m
'•,± ld +I! ;
--sow. oiowoa
_.
s
0 0
FIGURES
Number
MARSHALL AVENUE CROSS- SECTION 1
BOUNDARIES OF STORM WATER DRAINAGE AREAS 2
SERVICE AREA OF PROPOSED PUBLIC OPEN SPACE 3
PROPOSED TRAFFIC SYSTEM 4
SUMMIT -DALE COMMUNITY 5
ELEMENTARY AND HIGH SCHOOL BOUNDARIES 6
TYPICAL MIDDLE INCOME RELOCATION HOUSING 7
VIEW OF PROPOSED TECHNICAL - VOCATIONAL SCHOOL 8
VIEW OF PUBLIC HOUSING STRUCTURE ON LAUREL
BETWEEN VIRGINIA AND FARRINGTON 9
VIEW OF PROPOSED SELBY- WESTERN SHOPPING AREA 10
AERIAL VIEW 11
0 0
MAP S
l
Number
BOUNDARY MAP
1
PROPOSED LAND USE
2
EXISTING LAND USE
3
EXISTING COMMUNITY FACILITIES
4
EXISTING RIGHTS -OF -WAY
5
PROPOSED RIGHTS -OF -WAY
6
PROPOSED SURFACE IMPROVEMENTS
7
EXISTING COMBINATION SANITARY AND STORM
SEWER SYSTEM 8
PROPOSED SANITARY SEWER SYSTEM
9
PROPOSED STORM SEWER SYSTEM
10
EXISTING WATER SYSTEM
11
PROPOSED WATER SYSTEM
12
EXISTING ELECTRICITY
13
PROPOSED STREET LIGHTING
14
EXISTING GAS SYSTEM
15
EXISTING TELEPHONE LINES
16
EXISTING ZONING
17
PROPOSED ZONING
18
EXTERIOR STRUCTURE CONDITION
19
ILLUSTRATIVE SITE PLAN
20
l
t •
PREFACE
The Cathedral General Neighborhood Renewal Plan area lies on a bluff immediately
to the west of the Central Business District of the City of Saint Paul. It is
bounded generally by Interstate Freeway 94 on the north, Cathedral Place on the
east, irregularly by St. Albans and Arundel Streets on the west, and irregularly
by Marshall and Holly Avenues on the south.
The GNRP area is located within the Summit -Dale Community which contains a number
of important assets that were considered in the preparation of this Plan. A few
of these are (1) the predominantly residential character, (2) the surrounding
neighborhoods which are substantially structurally sound, (3) its proximity to the
Central Business District, (4) the interest of individuals and groups in improving
the area (5) the Cathedral area, one of the City's older and most completely de-
veloped communities, and its immediate environs contain a relatively large number
of private and public institutions serving persons both within the Renewal Area
and beyond its boundary.
The GNRP area is composed of approximately 5,800 persons '(1,382 families). Its
location and topographic advantages serve to fulfill the expectation that renewal
of the area can provide the City of Saint Paul with the opportunities to imagina-
tively continue and enhance the revitalization of the Summit -Dale Community. The
proposed development satisfies a number of basic objectives. The development:
(1) Provides an opportunity to enhance the City and the community
with needed additional public educational, recreational and
cultural facilities of lasting benefit.
- 1 -
0 0 1
(2) Halts and reverses the present deterioration and decline of
the area so that this General Neighborhood Renewal Plan will
serve as the first element of a comprehensive improvement
program encompassing the entire Summit -Dale Community (see
Figure 5, Summit -Dale Community).
(3) Serves as an opportunity to coordinate renewal with public
works such as the Federal Interstate Freeway, John Ireland
Boulevard and Marshall Avenue widening.
(4) Preserves the existing residential character of the community
by the achievement of compatible land uses. (It is anticipated
that there will not be a net reduction of the total population
in the GNRP area. Middle- income relocation housing is to be}
provided within Project I for project displacees.)
(5) Provides an opportunity to modernize both the retail and non-
retail commercial development in the Selby- Western area. (See
Figure 109 View of Proposed Selby! - Western Shopping Area.)
(6) Eliminates cross -town traffic by designing a local and collec-
tor type street network for the community, utilizing existing
rights -o£ -way and pavements wherever possible. (See Figure 49
Proposed Traffic System.)
(7) Clearance and Redevelopment, at an early stage (Project I) will
strengthen the incentive and probabilities of rehabilitation
success (amply demonstrated as key factors in rehabilitation
undertakings throughout the country).
- 2 -
• •
The Plan, based on;these objectives, sets forth the vision of distinctive neighbor-
hoods interdependent upon the community. In the Plan, aesthetic considerations
are of peer importance with technical considerations for an effective neighborhood
environment must be rationally arranged, and it must be a pleasant place in which
to live.
- 3 -
0 •
a. Description of boundaries of Plan area
1. Boundary trap - The boundaries of the Cathedral General Neighbor-
hood Renewal Plan area as shown on Map No. 19 Boundary Mao.
2. Boundary Description - The boundary description of the Cathe-
� dral General Neighborhood Renewal Plan, Minn. R- 17(GN) is as
follows:
A tract of land..situated in the City of Saint Paul, County of
Ramsey, Minnesota, described as follows:
Beginning at the point of intersection of the northern right -
of -way line of Marshall Avenue with the eastern right -of -way
line of North St. Albans Street, then northerly along said line
of North St. Albans Street to the point of intersection with
the southern right -of -way line of Rondo Avenue, then easterly
along said line of Rondo Avenue to the point of intersection
with a lot line which is 277 feet east of the eastern right -of-
way line of Mackubin Street, then southerly along said lot line
to the point of intersection with a lot line which is 142.75
feet north of the northern right -of -way line of Carroll Avenue,
then easterly along said line to the point of intersection with
the western right -of -way line of Arundel Street, then southerly
along said line of Arundel Street to the point of intersection
with the southern right -of -way line of the alley between Rondo
Avenue and Carroll Avenue extended, then easterly along said
alley line to the point of intersection with a lot line 197.3/8
feet east of the eastern right -of -way line of Arundel Street,
then southerly along said lot line to the point of intersection
with the southern right"of -way line of Carroll Avenue, then
easterly along said line of Carroll Avenue to the point of
intersection with the western right -of -way line of Cathedral
Place, then southerly along said line of Cathedral Place to
the point of intersection with the northern right -of -way line
of Dayton Avenue, then westerly along said line of Dayton Ave-
nue to the point of intersection with the western right -of -way
line (extended) of the alley between Summit Avenue and Farring-
ton Street, then southerly along said alley line to the point
of intersection with the northerly right -of -way line of Selby
Avenue, then easterly along said line of Selby Avenue to the
point of intersection with the western right -of -way line of
Maiden Lane, then southwesterly along said line of Maiden Lane
to the point of intersection with the eastern right -of -way line
of North Western Avenue, then northerly along said line of
2EIC
0 r
North Western Avenue to the point of intersection with the
northern right -of -way line of Holly Avenue extended, then
westerly along said line of Holly Avenue to the point of in-
tersection with the eastern right -of -way line of Arundel
Street, then northerly along said line of Arundel Street to
the point of intersection with the northern right -of -way line
of Marshall Avenue, then westerly along said line of Marshall
Avenue to the point of intersection with the eastern right -of-
way line of North St. Albans Street which is the point of
beginning.
3. Statement as to basis for revisions in GNRP boundaries from
those shown in the Cathedral Neighborhood Planning Applica-
tion.
A slight modification has been made in the boundary at the
intersection of Arundel Street and the alley between Rondo
and Carroll Avenue. This modification has been made to clar-
ify and correct an error in the boundary description submitted
with the Survey and Planning Application.
b. Land Use Map (see Map No. 2)
Land uses permitted within the categories shown on Map No. 2, Proposed
Land Use, are as follows:
Residential
MediumDensity
Medium -High Density
Institutional
Retail.Commercial
Schools
Parks, playgrounds and open spaces
1. Population densities
Population densities proposed are indicated under 2. below.
- 5 -
2.
• 0
Building coverage and other building requirements
The following are proposed regulations and controls for rede-
veloped areas within the General Neighborhood Renewal Plan.
These controls are intended to provide a tentative framework
for the preparation of urban renewal plans for the three spe-
cific projects within the General Neighborhood Plan. It is
anticipated that at the time such plans are written, the con-
trols herein presented will be reviewed in the light of code
revisions, economic and planning conditions not foreseeable
at this time. The stated building requirements are considered
as an example of the types of requirements that will be estab-
lished in specific project plans to be prepared as appropriate.
(a) Medium Density Residential
Uses Permitted: One family, two family
and multifamily housing.
Institutional and public
uses. Parks and play-
grounds.
Minimum Lot Size per Dwelling Unit:
One family 5000 square feet
Two family 3000 square feet
Multi- family
(Row houses and
Garden apartments) 2175 square feet
Minimum Side Yards:
One family
Two family
Multi- family
Minimum Front Yards:
5 feet
7 feet
10 feet
10% of average lot depth
but not less than 15 feet
L11
Minimum Spacing of Buildings:
Minimum Rear Yards:
0
Buildings within the
same parcel, having
exterior walls facing
one another, shall not
be spaced closer than
the combined sum of the
respective wall heights
measured to the eave
lines.
25 feet
Maximum Height 40 feet
Maximum Net* Building Coverage: 25%
Maximum Total Building and
Hard Surface Area Coverage: 70%
Minimum Off- Street Parkinge
Family type dwelling units - One parking space for
each dwelling unit
Special Residential Uses - Adequate parking
(Housing for the Elderly, should be provided.
Convalescent Homes and
Institution - affiliated
residential uses)
# Per cent of Net Land Area covered or intended to be
covered by the Principal Building.
(b) Medium High Density Residential
Uses Permitted:
- 7 -
Multi- family housing;
associated commissary
facilities; provided
there is no entrance
to such place of busi-
ness except from inside
the building with no
advertising or display
visible on the exterior
of the building; Insti-
tutional and public uses;
parks and playgrounds.
Minimum Lot Area per Dwelling Unit:
One family
Two family
Multi- family (Row house
& Garden apartments)
Walk ;up type apartment
of 25 units or more
Elevator type apartment
structure 4 stories or
more in height
Minimum Side Yards:
Minimum Front Yards:
Minimum Rear Yards:
5,000 square feet
3,000 square feet
2,175 square feet
19000 square feet
Minimum area require-
ments as appropriate
for the specific pro-
posal and as acceptable
to the Authority and
City Council
10 feet
10% of average lot
depth but not less
than 15 feet
35 feet
Maximum Net* Building Coverage: 35% of total lot area
Minimum Off- Street Parking:
Off- street Loading:
(c) Retail Commercial
same as for medium den-
sity residential use
One off - street loading
space is required for
every building having a
gross floor area of over
10,000 sq.ft. The off -
street loading space must
be maintained on the same
lot and must be not less
than 10 feet in width by
30 feet in length.
Uses Permitted: Retail business uses serving
both daily and occasional shop-
ping needs; business and pro-
fessional offices; parking
facilities and structures;
institutional or public uses
permitted.
* Per cent of Net Land Area covered or intended to be covered by the
Principal Building.
W-W
IN
Maximum Floor Area Ratio: 1.5 ##
Minimum Front Yards: 10 feet
Maximum Height: 40 feet
Minimum Off- street Parking: Specific parking requirements
will be provided in the specific
project plans as appropriate to
the types of uses contemplated.
Off- street Loading:
(d) Institutional
One off - street loading space for
every building having a gross
floor area over 10,000 square
feet. The off - street loading
space must be maintained on the
same lot and must not be less
than 10 feet in width by 30 feet
in length. For those buildings
having a gross floor area under
109000 square feet, adequate off -
street receiving facilities shall
be provided.
Permitted Uses: Public and private institutions
of a religious, educational elee-
mosynary, or philanthropic nature
(as well as staff housing and re-
lated uses), including: schools,
places of worship, parks and play-
grounds, athletic facilities,
affiliated institutional uses,
and service facilities related
to or primarily serving the per-
mitted uses, parking lots and
structures, medium density resi-
dential.
Minimum Set -back: 15 feet for lots up to 150 feet
in depth, 25 feet for lots over
150 feet.
## The floor area ratio expresses the relationship between the allow-
able floor area of a building and the gross area of the lot, i.e.,
a floor area ratio of 1.0 would allow the floor area in a building
to equal the area of the lot upon which the building would be
erected.
IM
Minimum Side Yards: 10 feet
Maximum Floor Area Ratio: 1.0
Maximum Net Building Coverage: '35%
Maximum Total Building and
Hard Surface Coverage: 70%
Off- street Parking:
Public and Private Schools:
Philanthropic and
Eleemosynary Institutions:
Places of Worship:
Off- street Loading:
•
No parking will be permitted
in required setbacks.
Adequate parking shall be
provided.
One parking space shall be
provided for each three
employees.
Adequate parking shall be
provided.
One berth for public and pri-
vate uses over 10,000 sq. ft.
(The berth is to be no less
than 10 by 30 feet. All load-
ing areas shall be screened
by landscaping or architec-
tural treatment.)'
3. Other provisions as to land use which should be incorporated in
Urban Renewal Plans for specific projects in order to achieve
land use objectives.
(a) No free- standing advertising sign or billboard should
be allowed in the commercial areas. Additional sign
controls and standards will be developed in the forth-
coming project.stage.
(b) Open parking lots with 10 or more spaces be required
to provide a solid fence or wall, or open fence or
wall'with shrubbery as appropriate, where such facil-
ities abut a public street, park or residential area.
- 10 -
N
No parking will be allowed in required front or side
yard setbacks. A minimum parking lot setback of 10
feet from all street rights -of -way or property lines
will be required.
(c) Where the term "Adequate Parking" is used, the Hous-
ing and Redevelopment Authority and the City Planning
Board of the City of Saint Paul will determine the
adequacy of parking to be provided. Building and site
plans of the proposed uses will be reviewed with res-
pect to the specific parking needs of any proposed
building in terms of its function.
(d) Identification of actions required to be taken by State
or Local governmental agencies in order to carry out
the plan.
Zoning Changes
Existing zoning within the Cathedral General Neighbor-
hood Renewal Plan area is "A" Residence, "B" Residence,
"C" Residence, and Commercial (see Map No. 17, Existing
Zoning). The major part of the GNRP area (see Map No.
189 Proaosed Zoning) is proposed for "C" Residence zon-
ing as the closest existing zoning category correspond-
ing to the residential and institutional uses proposed.
A small portion of the GNRP area centered at Selby and
Western Avenues will be zoned commercial to facilitate
- 11 -
the modernization of the existing shopping area now
located there.
Any existing uses which might become non - conforming
uses -under the proposed zoning would then fall under
the purview of the provisions of the Zoning Ordinance
of the City of Saint Paul. The proposed zoning for
the entire GNRP is in accordance with the Land Use
Plan of the general plan for the City of Saint Paul.
c. Plan for community facilities and public improvements
1.: Approximate location, size and character of existing and pro-
posed schools, parks, playgrounds and similar facilities.
The major land use categories proposed for the Cathedral Gen-
eral Neighborhood Renewal Area are: medium and medium -high
density residential, institutional, retail commercial, and
schools, parks and open spaces. In the discussion of these
it is convenient to refer to the area as divided into three
sectors formed by Marshall Avenue and Arundel Street (see Map
No. 1, Boundary Map).
Medium and Medium -High Residential
The contemplated residential development of Project I and
that of Project II is medium density in character. Project I
is proposed as a total clearance project, while Project II com-
prises spot clearance and rehabilitation. The residential
redevelopment in the first project (a small portion of the
- 12 -
• •
total project redevelopment) is directly adjacent to the resi-
dential development of the second project; and is an integral
part of this Project II neighborhood. .
In general, the second project contains a combination of one
family, two family and moderate sized multi - family buildings.
A substantial percentage of these structures (40.5% from field
survey) are in' sound condition. The estimated amount of clear-
ance proposed is approximately 45%. Redevelopment for medium
density residential (specifically row houses and garden apart-
ments) is contemplated. The proposed type of redevelopment is
completely compatible with the existing residential character
of the surrounding neighborhood. The proposed Regulations and
t
Controls will prevent overcrowding. In addition, open space
is provided ',both as a recreational and environmental amenity.
In keeping with the residential character of Project II, the
neighborhood is focused about a new park and playground adja-
cent to the existing McKinley Elementary School. The proposed
land use and traffic patterns will serve to further conserve
and enhance the existing residential environment within the
area.
Project III, generally bounded by Marshall Avenue, Maiden
Lane and Arundel, is a homogeneous residential neighborhood,
composed of.numerous apartment buildings, with single and two -
family homes being the exception rather than the rule. This
- 13 -
• •
characteristic will not be basically altered by the clearance
proposed for the area. This clearance will serve to remove
substandard structures and relieve overcrowding and congestion
as it presently exists.
The proposed residential redevelopment has a maximum density
of 44 dwelling units per acre, the maximum permitted under the
present zoning code. It is conceivable that when planning of
the third Cathedral project is undertaken, a re- evaluation of
market considerations will support an increase in the maximum
density. This area is topographically and geographically in
excellent position - next to the Saint Paul Cathedral on a
bluff overlooking the downtown, the State Capitol and the
Mississippi River.
In addition, new recreational facilities are proposed and the
existing Selby- Western commercial area consolidated and rede-
veloped aimed at providing a sound neighborhood convenience.
Parks and Open Spaces
There is now no park space in the first sector. No neighbor-
hood recreational facilities are planned for this specific
area because the nature of the proposed redevelopment elimin-
ates all residential development within the project area east
of Western Avenue.
The first project includes the site of a proposed new technical
vocational high school and a community park and play field of
- 14-
ri ♦.t.yrrpy�,7 wr7� i4 `.,�
approximately 'five 'acres. This latter°'lfacilit,-y incorporates
a ball diamond and an area which can be flooded in cold weather
for ice skating. In addition, some open space is earmarked for
passive recreation. The park will serve the technical- vocational
school, as well as the community. (See Figure No. 3, Service
Area of Proposed Public Open Spaces)
The second or western sector presently contains a playground of
.80 acres. Because of its poor location within the neighborhood
and the basically unfavorable topography of the site itself,
which borders Rondo Avenue and the future Freeway (see Map No.
3, Existing Land Use), the facility is to be abandoned. A
proposed park and playground of 5.71 acres adjacent to the
existing McKinley School site will replace this latter play-
ground. Neighborhood standards require one acre of playground
for every 800 persons residing in the neighborhood. Required
outdoor facilities include: one softball diamond; one tots'
apparatus; one area for children aged 7 -12; one multiple use
field game area; one hard surface court games area; and a pro-
tective buffer of fences and landscaping as needed. Together,
the school site and proposed playground comprise a total of
7.39 acres.
This proposed neighborhood park serves all of Project II and
the residential portion of Project I which lies generally west
of Western Avenue (see Map No. 2, Proposed Land Use). The total
population (within the GNRP area) served by the proposed facility
- 15 -
J
1F_ I
•
would be 2,728 people (including 672 persons from Project 1)
which represents a ratio of one acre to every 480 people
served. The recommended traffic pattern within Project II
is discussed further in following sections; but, it should
be noted that the proposed traffic plan is designed to pre-
serve the integrity of the residential neighborhood, thus
making the park facilities more easily accessible to all
neighborhood inhabitants by the reduction of through traffic
on local streets.
Project III, which is characterized by an apartment - dwelling
population,presently has no park or playground areas within
its boundaries. Therefore, the block presently bounded by
Virginia Street, Farrington Street, Dayton and Selby Avenues,
is proposed for park use. This site, with the addition of the
vacated portion of Virginia, would create 1.87 acres of park.
Included in this area are limited children's recreational
facilities, the major portion allocated to passive recreation
areas for the older population in the neighborhood.
A total of 12.74 acres of new park area will thus be available
to Cathedral Area residents. The following table summarizes
the proposed Cathedral General Neighborhood Parks:
CATHEDRAL GNRP - PROPOSED PARKS AND PLAYGROUNDS
Facility Project Area Type
High School 1 5.16 Community Park and
Park & Playfield Playfield
McKinley Playground 2 5.71 Neighborhood Play-
ground
Selby- Farrington Park 3 1.87 Neighborhood Park
(Passive Recrea-
tion & Playground)
Total Park Acreage 12.74 Acres
- 16 -
• •
One of the primary goals of this plan is to provide each of
the above mentioned residential areas with sufficient park,
recreation and open space, resultant in the park sites, as
proposed, being selected with several objectives in mind.
Included in the objectives were: topography, compatibility
with the proposed street pattern, a central and readily
accessible- location, as well as the condition and use of
existing structures in these proposed sites.
In additicn to the redevelopment of these residential areas,
new residential units, commercial uses and institutional build-
ings are to be arranged so as to provide supplemental open
spaces wherever possible.
Elementary Junior High g nd High Schools
The Cathedral GNRP is presently served by three elementary
schools: McKinley, Maxfield and Webster Schools (see Figure
No. 62 Elementary and High School Boundaries). The following
table illustrates their enrollment as of October, 1962:
Elementary
October 1962
Class Size
Date of
Area
School
Enrollment
Mean Median
Construction
In Acres
McKinley
575
29.7# 30.0
1903
1.68
Maxfield
478
29.6 32.0
1954
2.16
Webster 793 30.6 30.0 1926 1.78
(City Average) 29.6 30.0
# It is estimated that the Mean would drop to f 25.0 after redevelopment
of Project I.
- 17 -
• •
It should be noted from the above table that McKinley Elemen-
tary School, the only school of the three which lies within
the GNRP boundaries, is the oldest`structure as well as having
the smallest site of all. It has been proposed earlier in
this section that the McKinley School be augmented with a park
and playground of 5.71 acres, bringing the combined site to a
total of 7.39 acres. In addition it is proposed, that because
of its age'and inadequacy, the school structure be replaced
with a new structure or possibly a new addition with modern
facilities constructed in Project II. This addition would
handle any expected increase in enrollment from the future
GNRP population increase.
Marshall Junior High School, Central High School and Mechanic
Arts High School presently serve and are expected to continue
to serve the residential population of the Urban Renewal Pro-
ject. As noted in the Saint Paul Plan for Public Educational
Recreational and Cultural Facilities, Marshall Junior High
School will, in time, expand its existing site and facilities.
The construction of the proposed new Technical- Vocational
School (see Figure No. 8, View of Proposed Technical- Vocational
School) will be a valuable asset to the community and further
increase the number of educational facilities available to GNRP
inhabitants.
Supplementary to the City -wide school facilities, parochial and
private schools are located in the immediate vicinity. Within
- 18 -
It 0
b�
walking distance are: 1) St. Paul Cathedral School, 2) St.
Joseph's Academy (within the project area), and 3) the Capital
City Junior Academy.
In summary, the existing schools adequately serve the GNRP
residents and, as noted above, indications are that following
project redevelopment the number of students from the area
will be substantially reduced due to project displacement.
It can, therefore, be concluded that the above mentioned facil-
ities would provide adequate service to the residents in the
Cathedral General Neighborhood Renewal Area.
Institutional and Community Facilities
During the appropriate stages of project planning, the specific
needs of a number of institutions will be reviewed. It is
vital to the purposes and objectives of this plan to encourage
the development of a stable residential community in the Cathe-
dral General Neighborhood Renewal Project and the Summit -Dale
Community. Well planned and well maintained public and semi-
public institutions are a wholesome addition to neighborhood
and community amenities in addition to setting high standards
of maintenance as sound examples of civic contribution and
pride. It should be noted that these institutions have City-
wide and metropolitan influence.
The St. Joseph's Academy and the First Christian Church, both
withirn the first project area (see Map No. 4 Existing Community
Facilities), have requested that they be given consideration when
- 19 -
the redevelopment plans are drafted. Both have expressed a
desire to purchase additional property to be made available
for such uses as expansion, parking, playground or open space.
The Redeemer Lutheran Church, located at the southwest corner
of Carroll Avenue and Dale Street in the proposed Project II,
is presently acquiring land for a building program which would
include: a new chapel for 100 people, Christian Educational
facilities, a gymnasium, bowling alleys, a craft room, and a
residential development for the elderly of approximately 100
units.
Within and immediately surrounding the GNRP area are numerous
institutions of religious, educational, fraternal and philan-
thropic nature. Among these are numerous churches: The St.
Paul Roman Catholic Cathedral, the Church of Christ, the First
Seventh Day Adventist Church, the Dayton Avenue Presbyterian
Church, the Redeemer Lutheran Church, the Pilgrim Baptist
Church, the St. James AME Church, Peace Church of God in
Christ, the Church for Lord Jesus Christ, and the Trinity
Lutheran Church. Other elements of the institutional founda-
tion of the Cathedral Area would include such worthwhile
organizations as the Amherst H. Wilder Welfare Children's
Service, the Fairday Nursing Home and the Ober Boys' Club.
Local and Community Retail Business
The existing retail commercial area, centered•approximately at
Selby and Western Avenues in Project III, is in a state of
- 20 -
v
general decline. The existing strip pattern of commercial uses
and types is an outgrowth of long- outmoded concepts of commercial
development, which overlook the possible effects of the automo-
bile upon retail land uses. In general, the commercial uses are
found scattered throughout the area with almost no consideration
given to convenience, traffic circulation, neighborhood amenities,
or other accepted practices of good commercial planning. Most of
the existing uses are poorly located, overcrowded, and have little
or no parking. Several uses which could be classified as indus-
trial are located in the commercial area.
It is proposed that in Project III, the Selby- Western commercial
area be consolidated and rejuvenated (see Map No. 2, Proposed
Land Use). Industrial and marginal uses will be eliminated, and
a new commercial complex will be built around existing sound
commercial uses such as the new Del Farm Store at the southeast
corner of Selby Avenue and Arundel Street.
Eventually the existing strip development will be modernized and
a new integrated three corner shopping complex, totaling 7.65
acres with adequate parking, will evolve in its place (see Map
No. 200 Illustrative Shopping Area) and Figure No. 102 View of
Proposed Selby- Western Shopping Area.
2. Approximate location and general character of existing and pro-
posed major highways, streets, utilities and other similar im-
provements.
- 21 -
• •
The proposed Interstate Freeway #94 bordering the Cathedral
f area on the north (see Map No. 6, Proposed Rights -of -Way) will
serve to remove some through traffic volume, which formerly
used Cathedral Area streets for access to and from the Capitol
area and the downtown. In addition to the freeway, the new
John Ireland Boulevard now under construction at the eastern
extremity of the area will further consolidate and reroute
through traffic around the area.
The major streets which run through the project area area Dale
Street, Marshall Avenue, Dayton Avenue, Western Avenue and Selby
Avenue. The first three are the heaviest traveled in terms of
traffic volume. The remaining streets are generally interior and
local in,character, except that the existing antiquated "gridiron"
pattern allows a harmful intermixing of through traffic and local
residential traffic within the individual neighborhoods. Most
pavement widths range from 30 to 34 feet (see Map No. 5, Exist-
ing Rights -of -Way) with both sides of the streets being used
for parking, except on major streets such as Marshall Avenue
and Dayton Avenue which permit parking on only one side. One
of the goals of the plan has been the consolidation -and simpli-
fication, as far as possible, of the major and local street
systems within the Cathedral project. The proposed rights -of-
way (see Map No. 6) were designed in the interest of reducing
the number of intersections with minor streets as well as
eliminating through traffic from all minor streets presently
used as short -cuts and by- passes.
- 22 -
0 V
The p roposals x 06-d- li6"t-e a +herein, are in x�ccofd` with and reflect
the intent of the general traffic plans for the City of Saint
Paul (see Proposed Plan for Thoroughfares currently on file
with HHFA).
At present, Marshall Avenue and Dayton Avenue comprise one -way
streets carrying the major portion of traffic into and through
the Summit -Dale community. Dayton Avenue carries west bound
traffic, while Marshall Avenue carries east bound traffic.
With the opening of the Interstate Freeway, it is expected that
through traffic presently using the Marshall- Dayton pair will
be rerouted around the area. Recent preliminary traffic pro-
jections, taking note of this, have forecast a substantial need
for the Marshall- Dayton two way street system to function as a
main community collector street.
It is proposed that the Marshall Avenue right -of -way be widened
to 80 feet by the provision of an additional 14 feet on the
north side of Marshall Avenue. The pavement will be widened
from Cathedral Place to Western Avenue to accommodate the addi-
tional traffic expected to be generated by the proposed Tech-
nical Vocational School. During Project III, preceding the
opening of the Interstate Freeway, Marshall will be widened
up to Arundel, approximately 97 feet south of its present right-
of-way line. The widening will be continued west to Victoria
in separate renewal projects outside the scope of the GNRP. At
the completion of the widening, Dayton will no longer function
- 23 -
• •
as a collector link. The widened Marshall Avenue will then
serve as a two way collector street leading from John Ireland
Boulevard through the body of the Summit -Dale Community (see
Figure No.'l, Proposed Marshall Street Cross Section).
Dale Street, in accordance with City proposals, is planned to
be a major north -south arterial route. To facilitate the even-
tuality of-this proposal becoming an actuality, additional
right -of -way (bringing the total right -of -way to approximately
120 feet) ,will be provided in Project II. A future second
bridge has been proposed by the City Planning Board over the
Freeway to facilitate this widening. Western Avenue, one of
the other streets within the area designated as a collector,
will be resurfaced. The role of Western Avenue as a collector
is accentuated by the fact that it is one of the few streets
traversing the Freeway as well as passing through the commer-
cial district in the vicinity of Selby Avenue. Because of
its increasing role as a traffic carrier, an additional 14
feet of right -of -way will be dedicated and reserved to pro-
vide for a later widening when needed by future anticipated
traffic. All streets within the area generally designated
for the school site (i.e., Marshall Avenue to the Freeway
right -of -way and Cathedral Place to Virginia) will be vacated
in order to provide the contiguous school site necessary to
locate a school of the size proposed.
- 24 -
• •
The traffic pattern within the neighborhood has been rede-
signed (see Figure No. 4, Proposed Traffic System) by incor-
porating a number of cul -de -sacs and a loop, dedications and
substantial vacations of portions of streets or alleys. The
residential streets have been subdivided into two categories:
the "residential feeder street" and the "local street ". The
feeder performs the function of enabling the local street to
perform a strictly land access function. In doing this, the
feeder provides both a neighborhood traffic service and a
land access function. It feeds local traffic to the collec-
tor and, from that, into the arterial traffic pattern.
The arrangement and exact location of the proposed minor local
streets is subject to restudy at the appropriate project stage.
Utilities
The Cathedral Area is adequately serviced with water capacities.
Alterations within the water system are proposed in order to
continue water circuits which will be altered by plan objec-
tives. Minor alterations will also be required to the vaca-
tion of a number of interior streets.
The existing sewer system is a combined storm and sanitary net-
work (see Map No. g, Existing Combination Sanitary and Storm
Sewer System). Cooperation and liaison between the LPA, the
Saint Paul Department of Public Works, and the Minnesota State
Highway Department has made it possible to provide two com-
pletely independent sewer systems (see Map No. 9, Proposed
-25-
• •
Sanitary Sewer System, and Map No. 10, Proposed Storm Sewer
System), with the Freeway drainage system providing intercep-
tors and additional flow capacities, adequate to carry dis-
charge from the Cathedral Area. The function and tributary
areas of all interceptors were carefully analyzed 16 conjunc-
tion with proposed land uses before the evolution of the final
plan. The plan, as herein presented, reflects such considera-
tions and has been reviewed and approved by the Department of
Public Works of the City of Swint Paul.
The existing street lighting system will be modernized by re-
placement of obsolete fixtures with new luminaries. In
instances of street widening, such as that proposed for Marshall
Avenue, the removal of all existing poles and lamps, as well
as their replacement with modern new fixtures or repair, will
be required.
Modification, adjustments and additions to the existing elec-
trical power, gas and telephone systems will be made where
necessary by the particular private utility company involved.
In general, the proposed systems as noted herein have been
located in such a manner as to eliminate, as much as possible,
the need for utility easements; however, where required ease-
ments were required (see Map No. 2, proposed Land Use), they
were provided.
- 26 -
• •
Performance of Proposed Implovements
The responsibility for carrying out the proposed site and utility improve-
ments rests with the City of Saint Paul, the Housing and Redevelopment
Authority of the City of Saint Paul (LPA) and the Saint Paul Board of
Education. The improvements to be performed by the respective agencies
are as follows:
(a) LPA Rgsponsibilities
The Local Public Agency will remove the existing pavement,
curb and gutter, sidewalk, and perform grading on the follow-
ing streets: Carroll Avenue from the cul -de -sac east to Dale
Street; Carroll Avenue from Mackubin Street east to the east
Project Boundary; Iglehart Avenue from Arundel Street to Vir-
ginia Street; Marshall Place from Virginia Street to 120 feet
east of Farrington Street; Dayton Avenue from Western Avenue
to Virginia Street; Kent Street from the cul -de -sac south of
Rondo Avenue to Rondo Avenue; Mackubin Street from Marshall
Avenue north to the cul -de -sac; Virginia Street from the cul-
de-sac south of Selby Avenue to Dayton Avenue; Virginia Street
from Iglehart Avenue to Carroll Avenue; Farrington Street from
Maiden Lane to Laurel Avenue; Farrington Street from Dayton
Avenue to Marshall Place; Nina Street from Laurel Avenue to
Selby Avenue; Carroll Avenue and Iglehart Avenue from Dale
Street to the Carroll - Iglehart Loop, and a number of alleys
within the Project limits and outside the Technical - Vocational
School site.
- 27 -
• •
The following streets will be resurfaced: Carroll Avenue
from St. Albans Street east to cul -de -sac; Carroll Avenue
from Dale Street to Mackubin Street; Iglehart Avenue from
St. Albans Street to Arundel; Dayton Avenue from Arundel
Street to Western Avenue; Dayton Avenue from Virginia Street
to Louis Street; Laurel Avenue from Arundel Street to Maiden
Lane; Ashland Avenue from Arundel Street to Western Avenue;
Dale Street from Marshall Avenue to Rondo Avenue; Kent Street
from Marshall Avenue north to the cul -de -sac south of Rondo
Avenue; Mackubin Street from the cul -de -sac north of Marshall
Avenue to!Rondo Avenue; Western Avenue from Holly Avenue to
Laurel Avenue; Western Avenue from Marshall Avenue to Carroll
Avenue; Virginia Street from Maiden Lane north to the cul -de-
sac south of Selby Avenue; Virginia Street from Dayton Avenue
north to the cul -de -sac at Carroll Avenue; Farrington Street
from Laurel Avenue to Dayton Avenue; and Louis Street from
Dayton Avenue to Marshall Avenue.
The Local Public Agency will provide new paving, curb and
gutter, and sidewalk on the following cul -de -sacs: Between
St. Albans Street and Dale Street on Carroll Avenue; between
Carroll Avenue and Rondo Avenue on Kent Street; between Mar-
shall Avenue and Iglehart Avenue on Mackubin Street; between
Marshall Avenue and Iglehart Avenue on Virginia Street, be-
tween Laurel Avenue and Selby Avenue on Virginia Street; as
well as the Carroll - Iglehart Loop.
- 28 -
• 0
Necessary storm sewer lines will be provided as indicated on
Map No. 10, Proposed Storm Sewer System, on the following
streets: Carroll Avenue from Dale Street to Kent Street;
Kent Street from Iglehart Avenue to Carroll Avenue; Carroll
Avenue from Kent Street to Mackubin Street; Kent Street from
cul -de -sac to Interstate #94; Selby Avenue from Farrington
Street to Western Avenue; Western Avenue from Selby Avenue
to Dayton Avenue; Virginia Street from Dayton Avenue to Mar-
shall Avenue; Farrington Street from Dayton Avenue to Selby
Avenue; Dayton Avenue from Farrington Street to Louis Street;
Louis Street from Dayton Avenue to Marshall Avenue; Virginia
Street from cul -de -sac at Carroll Avenue to Interstate #94;
and Selby Avenue from Farrington Street to Maiden Lane.
The existing light poles, water hydrants, catch basins, and
manholes will be removed. Existing electric conduits, water
mains, and sanitary sewer lines will be plugged to the extent
indicated on the various GNRP utility maps on the following
streets: Carroll Avenue from the cul -de -sac east of St. Albans
Street to Dale Street; Carroll Avenue from Mackubin Street to
the Project boundary; Iglehart Avenue from Arundel Street to
Virginia Street; Dayton Avenue from Western Avenue to Virginia
Street; Virginia Street from Selby Avenue to Dayton Avenue;
Virginia Street from Iglehart Avenue to Carroll Avenue; Marshall
Place from Virginia Street to 120 feet east of Farrington Street;
Farrington Street from Dayton Avenue to Marshall Place; and Nina
Street from Laurel Avenue to Selby Avenue; Farrington Street from
Maiden Lane to Laurel Avenue.
- 29 -
i • •
The Local Public Agency will provide street lighting facilities
as indicated on Map No. 14, Proposed Street Lighting, on the
following streets: Carroll Avenue from St. Albans Street east
to the cul -de -sac; Carroll Avenue from Dale Street to Mackubin
Street; Iglehart Avenue from St. Albans Street to Arundel Street;
Dayton Avenue from Arundel Street to Western Avenue; Dayton Ave-
nue from Virginia Street to Louis Street; Selby Avenue from
Arundel Street to Project boundary; Laurel Avenue from Arundel
Street to'Maiden Lane; Ashland Avenue from Arundel Street to
Western Avenue; Dale Street from Marshall Avenue to Rondo Ave-
nue; Kent Street from Marshall Avenue to the cul -de -sac south
of Rondo Avenue; Mackubin Street from the cul -de -sac at Marshall
Avenue north to Rondo Avenue; Western Avenue from Holly Avenue
to Carroll Avenue; Virginia Street from Maiden Lane to the cul-
de -sac south of Selby Avenue; Virginia Street from Dayton Ave-
nue to the cul -de -sac at Carroll Avenue; Farrington Street
from Laurel Avenue to Dayton Avenue; Louis Street from Dayton
Avenue to Marshall Avenue and the Carroll - Iglehart Loop.
(b) City of Saint Paul Responsibilities
The City of Saint Paul will remove the existing pavement, curb
and gutter, and sidewalk on the following streets: Marshall
Avenue from St. Albans Street to Cathedral Place; Arundel Street
from Carroll Avenue north to the Froject boundary.
Land for street purposes will be sold or dedicated to the City
of Saint Paul as appropriate and generally in accordance with
- 30 -
Map No. 69 Proposed Rights- of -Wav, and street vacations and
dedications shall be accomplished by separate actions in
accordance with State law and local: ordinances.
The following streets will be resurfaced by the City of Saint
Paul: Arundel Street from Holly Avenue to Carroll Avenue;
Marshall Avenue from Western Avenue to Cathedral Place; con-
struction of new pavement, curb and gutter, sidewalk, 16 foot
median strip, and landscaping on Marshall Avenue from St.Albans
Street to Cathedral Place; and construction of the cul -de -sac
on Arundel Street at Carroll Avenue, consisting of new pavement,
curb and gutter, and sidewalk.
The City of Saint Paul will remove the existing light poles,
water hydrants, catch basins and manholes, as well as plugging
the existing electric conduits, water mains, and sanitary sewer
lines, to the extent indicated on the various GNRP utility maps,
on the following streets: Marshall Avenue from St. Albans to
Cathedral Place; Arundel Street from Carroll Avenue to Rondo
Avenue.
Necessary sanitary sewer lines in Arundel Street from Iglehart
Avenue to Carroll Avenue and in Carroll Avenue from Arundel
Street to Western Avenue, will be provided.
The City of Saint Paul will provide the necessary storm sewer
lines, as indicated on Map No. 109 Proposed Storm Sewer System,
on the following streets: Arundel Street from Marshall Avenue
to Carroll Avenue; Carroll Avenue from Arundel Street to Western
- 37
1 �
Avenue; Marshall Avenue from Virginia Street to Cathedral
Place; Western Avenue from Marshall Avenue to Carroll Avenue;
Mackubin Street from Marshall Avenue to Carroll Avenue; Carroll
Avenue from Mackubin Street to Arundel Street; Arundel Street
from Laurel Avenue to Dayton Avenue; Dayton Avenue from Arundel
Street to Western Avenue; and Western Avenue from Dayton Avenue
to Marshall Avenue.
The City of Saint Paul will share in the installation expense
of the following storm sewer lines with the Minnesota Highway
Department: John Ireland Boulevard from Marshall Avenue to
the South Frontage Road; across the Freeway from South Front-
age Road to the St. Anthony Hill Tunnel.
The necessary water main in Arundel Street from Iglehart Ave-
nue to Carroll Avenue will be provided by the City of Saint
Paul.
The City of Saint Paul will provide street lighting facilities
as indicated on Map No. 149 Proposed Street Lighting, on the
following streets: St. Albans Street from Marshall Avenue to
Rondo Avenue; Arundel Street from Marshall Avenue to cul -de-
sac at Carroll Avenue; and Marshall Avenue from St. Albans
Street to Cathedral Place.
- 32 -
(c) Saint Paul Board of Education Responsibilities
The Saint Paul Board of Education will remove the existing
pavement, curb and gutter, sidewalk, and perform grading on
the following streets: Iglehart Avenue from Virginia Street
to Cathedral Place; Marshall Place from 120 feet east of
Farrington Street to Louis Street; Farrington Street from
Marshall Place to Carroll Avenue; Louis Street from Marshall
Avenue to Carroll Avenue; and the alley between Louis Street
and Cathedral Place.
The Saint Paul Board of Education will remove the existing
light poles, water hydrants, catch basins and manholes, as
well as plugging the existing electric conduits, water' - rains;
and sanitary sewer lines, to the extent indicated on the var-
ious GNRP utility maps, on the following streets: Iglehart
Avenue from Virginia Street to Cathedral Place; Marshall Place
from 120 feet east of Farrington Avenue to Louis Street; Far-
rington Street from Marshall Place to Carroll Avenue; Louis
Street from Marshall Avenue to Carroll Avenue.
The Saint Paul Board of Education will provide a storm sewer
line paralleling the South Frontage Road and extending from
Farrington Street to Cathedral Place. The Saint Paul Board
of Education will share in the installation expense of the
storm sewer line paralleling the South Frontage Road and
extending from Cathedral Place to John Ireland Boulevard with
the Minnesota Highway Department.
- 33 -
N
R K
•
d. 1. Delineation of parts of area in which contemplated urban renewal
action is clear "a"nce and redev'plopment:
Areas proposed for clearance and redevelopment for major rights-
of-way and major institutional uses are shown on Map No. 1,
Boundary Ma g. Variation in clearance areas may occur in Pro-
jects II and III during later project planning. The plan for
Cathedral Area Urban Renewal Project I, Minn. R -25, is being
simultaneously submitted with this document. Dollar relocation
and structure estimates are included in the sections that fol-
low in order to permit a thorough review predicted on probable
maximum clearance undertaking.
2. Eligibility
(a) The entire General Neighborhood Renewal Plan area
qualifies as an eligible urban renewal area.
(b) The area contains no substantial sub -areas which,
in themselves, do not meet eligibility requirements
for urban renewal areas.
(c) Urban renewal project action is contemplated for
the entire GNRP area and will exclude no substan-
tial sub- areas.
The area has been logically delineated to maximize protection
against any blighting influences which affect it. The Inter-
state Freeway (presently under construction) serves as the
northern boundary. The topography sharply slopes downward
- 34 -
• •
toward the central business district to the east and south.
The southern boundary has been placed on Maiden Lane (the
alley immediately north of Summit Avenue which runs near the
edge of the bluff that overlooks downtown Saint Paul). The
structures along Summit Avenue are of the mansion type, many
of which have been converted to institutional uses (i.e., a
priests' rectory, nuns' convent, etc.). The natural bluff
fortifies the eastern and the southern boundaries.
The GNRP is composed of two sections which are separated by
Marshall and Dayton Avenues. The area north of Marshall and
east of St. Albans is congested and seriously dilapidated.
The area south of Marshall has not declined at as rapid a rate,
but it indicates familiar signs of deterioration. The popula-
tion of the section east of Arundel is highly mobile, with 85%
of the dwelling units renter occupied. The GNRP is predomin-
antly residential with a number of commercial structures along
Selby and at the corner of Selby and Western.
The area has been planned in its entirety, but with a GNRP
area of such magnitude it has been delineated into three sub-
stantial project areas. These projects will be carried out
in distinct stages over a ten year period.
The resources available to the LPA assure the punctual com-
pletion of all urban renewal project activities.
In the determination of eligibility, the following major sources
of data were employed: (1) an extensive 100% exterior condition
- 35 -
survey, (2) a sample interior survey of over 20% of the struc-
tures in Projects II and III and a 100% interior survey in Pro-
jects I and III evident environmental conditions within the
total General Neighborhood Renewal Plan area.
Qualifications for Title I assistance stipulate that at least
20% of the buildings in an urban renewal area must contain one
or more building deficiencies and the area must contain at
least two environmental deficiencies. In areas proposed for
clearance, more than 20% of the buildings must be substandard
requiring clearance and other clearance must be warranted to
effectively remove blighting influences.
The tabulations of data included in this section bear out the
aspects of conditions ascertainable in the field and show that
Federal requirements for both project and clearance eligibility
are met. Out of the total of 788 structures in the General
Neighborhood Renewal Plan area, 446 or 56.6% are deficient, of
which 173 or 22.0% are substandard, thus fulfilling the sub -
standardness requirement. Added evidence of substandardness
can be expected during the later project stages. Warranted
clearance, beyond structural substandardness, is supported by
the extensive evidences of environmental and blighting influ-
ences within the General Neighborhood Renewal Plan area.
In summary, 57% of the structures are deficient, of which 22%
are substandard requiring clearance. Other clearance is war-
ranted to effectively remove, among other things, the follow-
ing blighting influences:
- 36 -
• •
1. Inadequate pavement widths, inadequate parking facilities,
and unsafe traffic flow - residential combinations
2. Excessive dwelling unit density
3. Conversions of one and two family structures to multi - family
structures and rooming houses
4. Inadequate plumbing facilities as evidenced by the fact that
26 -27% of the dwelling units have shared baths and toilet
facilities
5. Overcrowding of structures on the land and the lack of needed
community facilities (parks, play lots, etc.)
TABLE I
ACREAGE OF GENERAL NEIGHBORHOOD RENEWAL PLAN AREA
BY PRESENT USE
Use Square Feet Acres
Total
79442,712
170.8
1. Streets, alleys, public
rights -of -way
Total
1,960,200
45.0
2. Residential
Total
59187,289
119.1
a. Dwelling purposes
4,904,701
112.6
b. Related public or semi-
public purposes
2829588
6.5
3. Non - residential
Total
292,223
6.8
I
a Commercial
254,213
5.9
bl Industrial
I
41,010
.9
I
- 37 -
v.
\1�
H
O
n
r
C
Q.
(D
N
G
d
A
N
O
r+.
r
CL
r
O
r
N
r
10
W
W
d`
J
w
Oa
O4
O
01�
ak
d`
w
r
CQL
w
Oa
N
J
N
N
N
O
00
I w
O
w
:L1 H
H
H
H
:U
O
O
O
`O
u.
u.
u.
(D
: (D
(D
n
n
n
rF
rF
rh
H
H
H
H
H
N 7
H
10
Q
r
O
r
N
r
10
W
W
d`
J
w
Oa
O4
O
01�
ak
d`
w
r
CQL
w
Oa
N
J
N
N
N
O
00
I w
O
w
- 38 -
V
x
r
m
H
H
IF
:L1 H
0
60
r
N
Vi
A
H
N 7
10
Q
.a
00.
N
%,O
O c
A
1
t
rr
V
.O
W
O0
W
T o (D
>`
04
00
\O
N 0 N
►-
�} • •
H (f
z�
G) 2
r
]u z
z c
�n
r
(D o
V
N O
' 1
a x
a
%lo
c
n`)
r
tr
u
r
r
N
z
C/
m•
x
H
C7
r�
"
a°
v
a°
�n
r
r
W
�a
Ic
00
%O
00
N H
X N•
bC
O (D O
C(
• (D N
38
ig
A
zis�
n
:T1
1
r•Tnc
cs�r
r ni
►N•'
�
W
(D t ►-
ln c
� x a /-•� r°1T
Vt
�O
O O C O
W
N
w
1•' G a) CL Z
aN rwtr
(i
H w C
H ►-
r
C OOt. C
N N•
- 38 -
V
x
r
m
H
H
IF
• •
e. Statement of prospective requirements for rehabilitation of individual
properties:
Clearance and conservation are the predominant treatments proposed with- '
in Projects II and III of the General Neighborhood Renewal Plan: Project
I is proposed for clearance treatment only.
Delineation of the conservation areas has been based, in part, upon an
exterior survey of all the structures within the Cathedral GNRP. The
surrey indicates that over 809 of the structures to be retained are in
need of only minor or no repairs. The number of structures to be re-
tained which require more extensive treatment are feasible of being
upgraded to desirable standards. In many cases the state of the build-
ings could be brought up to such standards by the enforcement of the
City of Saint Paul Housing Code. A program of effective code enforce-
ment is to be implemented during the summer of 1963. It it hoped that
by vigilant and vigorous enforcement that the property owners can be
induced to maintain such structures in a satisfactory state.
Within the two areas proposed for rehabilitation, the existing street
pattern has been replanned to discourage undesirable through traffic.
In this manner, the residential character of these neighborhoods can
be enhanced and protected.
An elementary school and park will act as a central focus for Project
II, while Project III will have the modernized Selby- Western shopping
center as a nucleus in addition to a new park
- 39 -
• •
The following, laws, codes and regulations will be enforced in the area:
City of Saint Paul - Building Code
- Zoning Ordinance
- Housing Code
In addition, conservation requirements will be established, aimed at
restoring to a sound condition all properties to be retained. The con-
servation requirements will be drafted during the appropriate project
planning stages, at which time further surveys will be conducted. Such
surveys will be directed toward establishing these requirements. The
surveys will help determine:
(1) Feasibility of rehabilitating structures in the area
(2) Debt - carrying capacity of properties and owners
(3) Recent improvements completed, underway or contemplated
(4) Estimates of rehabilitation costs for structures in the
area
(5) Attitudes as reflecting the neighborhood identity and
community organization
(6) Voluntary rehabilitation standards.
The property conservation standards to be established will be:
(1) Sufficiently high to assure the long -term useful
life of the properties and to justify the costs in-
volved
(2) Feasible of practical application to existing physi-
cal condition within the respective areas
(3) Directed toward bringing the property to a sound mar-
ketable condition in relation to the determined market
segment represented in the area
(4) Aimed at incorporating as standards additional volun-
tary objectives partially determined by an assessment
of the attitudes and desires of the residents surveyed
in project planning stages and finally determined
during the stages of execution.
- 40 -
0 •
(5) Requirements which residential properties must meet
in order to be eligible for FHA Section 220 mortgage
insurance.
Following are tentative Minimum Conservation Objectives for the rehabil-
itation areas in the Cathedral Area. Final requirements will be devel-
oped in consultation with the FHA during the project planning stages.
General Conservation Objectives:
(1) Exterior Rehabilitation
(a) Every foundation, exterior wall, roof and all other
exterior surfaces will be kept in a state of good
repair.
(b) Outside stairs, rails, and porches should be proper-
ly constructed and adequately maintained.
(c) Windows and doors shall be maintained in good repair
and in good working order.
(2) Interior Rehabilitation
(a) Cellars, basements and crawl spaces should be ade-
quately maintained to be free from decay or deter-
ioration from dampness.
(b) The extermination of insects,rodents and vermin
wherever such infestation exists.
(c) All structural elements of every building should
be so maintained as to present deterioration which
might endanger the ability of these members to car-
ry imposed loads.
(d) Interior stairways should be maintained in sound
condition and all handrails properly secured and
proper lighting provided.
(e) The interior of all structures should be maintained
in a clean and sanitary condition suitable for human
habitation.
(3) Dwelling Unit Rehabilitation
(a) No dwelling unit overcrowding should exist. Minimum
gross floor areas are established in the Housing Code
of the City of Saint Paul.
- 41 -
• •
(b) The elimination of dwelling units in basement spaces.
(c) Every dwelling unit should be adequately heated in
all rooms (such heating equipment to be free from
fire hazards and kept in good iepair).
(d) Every dwelling unit should contain a water closet,
lavatory, and bathtub or shower in good working con-
dition.
(e) Adequate hot water heating facilities in good work-
ing condition and properly connected to the lavatory,
bathtub or shower, and kitchen equipment should be
provided.
(f) A kitchen sink in good condition properly connected
to hot and cold water lines will be provided for each
dwelling unit.
(g) Every dwelling unit is to have space for dry and re-
frigerated food storage, as well as for cooking equip-
ment.
(h) Rooms or spaces should be properly divided to assure
reasonable privacy. Adequate closets and storage
areas will be provided.
(i) Each room in every dwelling unit will be provided
with a sufficient number of electrical outlets pro-
viding adequate electrical service.
(j) All walls, ceilings, woodwork, doors and windows are
to be kept clean and free of flaking and peeling
paint.
(k) Every habitable room will be provided with adequate
daylight and ventilation.
(1) The proper number of separate exits for each dwell-
ing unit will be provided.
(L,) Exterior and Property Maintenance
(a) All exterior wood surfaces should be protected from
the elements by paint or other protective coating.
(b) All buildings should provide adequate garbage and
rubbish disposal facilities.
(c) Exterior property areas should be kept clean and
free from the accumulation of weeds, rubbish, litter
and the like.
- /+.2 -
(d) Fences should be kept in good repair.
(e) All exterior property areas should be so graded that
rain water will drain away from the structure and
that stagnant water will not accumulate on the pre-
mises.
(f) Adequate off- street parking will be provided for
each dwelling unit.
During the stages of execution every effort will be made to maximize
the neighborhood potential and cultural resources available within the
area to insure a successful conclusion of the rehabilitation program.
Citizen interest will be stimulated and strengthened to promote local
community participation in the conservation effort.
Project improvements will be scheduled with each Urban Renewal project
so as to have the most effectiveness on the rehabilitation work being
planned or in progress.
A continuing relationship will be established with the Federal Housing
Administration, local lending institutions, realtors, building trade
unions, and various other organizations which are able to strengthen
the conservation of the Cathedral Area. In addition, close coopera-
tion will be maintained with those various City departments charged
with responsibilities relating to the enforcement of minimum standards
pertaining to the public health, safety and welfare. Such contact'
will be maintained in order to further implement the standards and goals
to be set forth for the rehabilitation areas.
f. Identification, by tentative boundaries, of anticipated projects in-
volving Title I aid, together with contemplated program of their
sequence and timing.
- 43 -
The boundaries for the three proposed projects are noted on Map No. 1,
Boundary Map, and will proceed consecutively as indicated on this map.
The first project includes the northeast sector of the area. Project
II contains the area lying due west of the first project, and Project
III encompasses the area south of the first project.
The first project is scheduled to run for a period of four years. Pro-
jects II and III are expected to be active for a period of three years
each. Project I is expected to take a year longer than the succeeding
projects as it is basically a total clearance project and the acquisi-
tion and demolition activities involved are more complex and time con-
suming as opposed to the other projects which are proposed for partial
clearance and conservation. Except for Project I, the planning for each
of the succeeding projects will be underway during the execution of the
preceding project.
Assuming the first project begins in November 1963, the timing will be
as follows:
Begin End
Project I November 1963 November 1967
Project II November 1967 November 1970
Project III November 1970 November 1973
Further examination of the projects may be required because of the over-
lapping of two projects at any given time. With the exception of Project
I, the timing of funds, relocation, the market, and progress in preceding
projects will determine the final schedule.
J'
l�
111 ■ �I +� �i ♦ 1 �j■rjji
ED
�7 1will
LIM
kilm
0 ZEN
1���dCedbdo�� Mw i ! ! ! ■I'L`I��! ■_'' 'ni
OWN all
WIN
is
a
III � ��lil 1
PROPOSED
PROJECT BOUNDARIES
NU.BERS REFER To 3
... PROPOSED SEQUENCE
OF PROJECTS
..............� 1
\,'0
BOUNDARY MAP
CATHEDRAL AREA -
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
? CHICAGO 4, ILLINOIS MAP NO., 1
I '
,I
r
............................ ...............................
EL-
RR
GL HART
l
IVIED'
D
M E Dk_
Z
RET*
PUB
PUB
INS I
PROF;
FRET` PROPOSED LAND USE
E
- --
G.N. CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING AND REDEVELOPMENT I JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST Eth STREET
SAINT PAUL, t, INPIESOTA
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO. 2
. mi ... X11 i u I
1110111
FRE
� GAR
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
f
EXISTING LAND USE
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R-17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD - HARRISON 7-2150
CHICAGO 4, ILLINOIS I MAP NO. 3
A--'i
. .......
TWO
MULT
com I
INDUI
SEMli
PUBH
VACA I
N
VACA�
.......... .......::��:
..........
........
FRE
� GAR
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
f
EXISTING LAND USE
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R-17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD - HARRISON 7-2150
CHICAGO 4, ILLINOIS I MAP NO. 3
A--'i
SINGI
TWO
MULT
com I
INDUI
SEMli
PUBH
VACA I
VNR
VACA�
FRE
� GAR
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
f
EXISTING LAND USE
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R-17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD - HARRISON 7-2150
CHICAGO 4, ILLINOIS I MAP NO. 3
A--'i
Il
_Wnl MasE00000° T I FRD00
,r-------- - - - - --
I
II
II
II
II
J� -- — — — — — — — — — — — — —
J'
,
r��L`1L'lil r
off,', ,14mi
1111111111-111101
11111CSdbdL
MINIMUM
MINIMUM
11111millillim
I II
I I I I
I I I I
I I I I
I I I I
-------- - - - - -- L------- J--- - - - - --
I PILGRIM BAPTIST CHURCH
2 ST JAMES AME CHURCH
3 PEACE CHURCH OF GOD
4 CHURCH OF OUR LORD
5 OBER BOYS CLUB AND I
6 PLAYGROUND
7 Mc KINLEY SCHOOL
B REDEEMER LUTHERAN Cl
9 ST. JOSEPH'S ACADEMY
10 FIRST CHRISTIAN CHURCH I
II CATHOLIC GUILD HALL 1
12 AMHERST H. WILDER WELFARE CHILDRENS
13 DAYTON AVENUE PRESBYTERIAN CHURCH?
14 FAIRDAY NURSING HOME
2
- PROPOSED
PROJECT 60UNDARIES
3
PROPOSE REFER TO
PROPOSED 5EOUENCE
OF PROJECTS
EXISTING
COMMUNITY FACILITIES
••••••••••••••••• FREEWAY RIGHT—! i
CATHEDRAL AREA ,
1 GENERAL NEIGHBORHOOD RENEWAL PLAN
f MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
v
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST .5th STREET F URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA j 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
I+ CHICAGO 4• ILLINOIS
MAP NO. 4
1
0
C]
A 2 A I
J 66/40 i 66/
I
I
NOl I
OIw 0 w
awl A 2 Nm A 2
/32 A
ate' ........................!i 66/40
r - _ _ _ - - _ _ - _ _ __ _ STREET
II
I I NM
II 11
I I A 2 A A 2 LD A 2
...,...... /40 ...................... av .................... /40
..... ...............................
........... ............................... �.. �LLLLLIYYWIYWIWY I I I I
I NIO 1 I I I I
NT 1 \O I I I I
Q0 1 1 I I I I
I I A 2 1 A, A 2 I I A 2 II
66/30 66/i�30_-- _ - - - - -J /30
�� -
------- - - - - - - - - - - - - - • - - -__-
I I I I NN I
.................. ...............................
NM.IFI....,.• 1,1 I
1 J—
<0 i wQ i •..,,•. •QO I.i
A 2 A I A 2 JI
66/30 66/; 66/34 �yl 66/34 �� •. 66/34
J L
l
I I L I ! 1 CD
N10I I I I I I I 11 I N\
Q01 NO I I II� ,ate
j J o
1°I O I I A i A 2 1 1 w
I
1=6 acn I I 66/; 30/2_0 _ _ _ _ _ _ _ _ _ I Iw
J l _ _ TL7cE— - - - - —— —ED I k5
A I NM 1 I A I IT I Q I
lzl 66/32 a� J I 66/32 I I 66/32 aE r,
I I 1� 1 P,� ••
I I
J�
1,
a NN I T D
](D ToICI N 1_0 1I I _T 2 I I A' A, Z Q A I I
66/
r
2
I
PROPOSED
PROJECT BOUNDARIES
NUMBER$ REFER TO 3
PROPOSED SEQUENCE
OF PROJECTS
Z VAIN
I
3 POOR' EXISTING
PAVE[
RIGHTS -OF - WAY
i
-__ PAVE[ C A T H E D R A" L AREA
I
................... FREE!,
GENERAL NEIGHBORHOOD RENEWAL PLAN
G.N.R MINNESOTA R -17 (GN) ST. PAUL MINNESOTA MAY 1, 1963
t
HOUSING AND REDEVELOPMENT
JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL URBAN RENEWAL AND CITY PLANNING CONSULTANTS
IT
SAINT PAUL, MINNESOTA 63 WEST JACKSON BOULEVARD HARRISON 7 -280
CHICAGO a, ILLINOIS
55 EAST 51 STREET MAP N0. 5
............................. 7STREET
--------------'- /---__--_--'
.
L------------_/ � ��
." ".. ' ------- - - - - - - - -
�
�
/.
/.
/.
/.
/.
..
�
/. .' .
// ..
�
6m
/.
�
�
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
�.,
'
."
:::�
---.~. F
t
PROPOSED RIGHTS ~ OF- WAY
CATH-EDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R-17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD - HARRISON 7-2150
CHICAGO 4, ILLINOIS IMAP NO. 61
• •
PROPOSED
SURFACE IMPROVEMENTS
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING AND REDEVELOPMENT ! JACK MELTZER assocla,TEs
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO. 7
E
J� g..
l ........................ _ A ! .L ...................
I p....... g�....
- ♦-- - - - -'� _ _- -� - - -- -- - STREET
I 1 _ J ` ;.........� .. .......... .........................J..... h......
W 9" —'� -- -- - - - -r -- - - - --
1..r III III
I I ; III III
I III I..I I
l t i g, Iz',
I I " I li I ICI
....._ ...
........�I� 11
1 I
9
18 IS°
I I It1 l i l i1 I
al "
1 1 �II E %15 i I
I I 1111�� Ip'_ 1 1 1
- - - --
I I I
12 J I I ♦I
I I I
I
0
i I
I
8..
T
1
1
-T
-,12"
' D '
"
I
I2 "I
I
1 z
RROFOSED
FROIECI BOUNDARIES
NIMABERS REFER TO
FROFOSED SEQUENCE
OF FROIEC IS
EXISTING COMBINATION SANITARY
AND STORM SEWER SYSTEM
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
t
HOUSING AND REDEVELOPMENT I 1 JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL URBAN RENEWAL AND CITY PLANNING CONSULTANTS
55 EAST 5th STREET
SAINT PAUL, MINNESOTA I 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4. ILLINOIS
MAP NO. 8
t
•
N
0
�t
77ieF,1{r,'i,t�y�• ,o { ,{
iii�Kr'�.f��1R�f �1 .a ,Li al{,11
0
5ANITARY 5EWER 5Y5 UEM
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
E MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING REDEVELOPMENT
IT O FSAI JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO.
a�
J
1
r _ _ - - - - _ - - _ STREET
I I'
II {
II 1
J -- - - - - - - - - - -
- -- - - - - -- ��.
1, 1
I I
1
II
II 1
I ,
lr--------------
I� 1
II I
II
II
II 1
I I
J L
1
I I L II
I I I
I
I
I I I II
II II�
� r
I Iwl
I I�
I
J�
HOUSING AND REDEVELOPMENT '
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
I I ,
I I I I
I I I I
I I I I
-- - - - - - - - - - - -J L-- - - - - -J ` - - - - - - - -
PROPOSED
STORM SEWER SYSTEM
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
:tll
.6 ................._.....1. --- ..........b —v
,..` .................... ..........
II
I I I " ..................
16_..........
J1�----- 6 „ - - - - -- -------p--------------
6111 I4 "I I I I
Lmm.�.M.-Jw
-- 61------11 - - - - --
1I
��i III 1 ill
I I I 6" I I
J�L 611 i---- ___ - --
I I LII � I I I
I I III III
6111
I I x,1111 I ill
I I JI 111 I 611 I I
1�
It I I
I
III IZ I 6'
—1�
61.1 Imp ------------ — L
I a i
I N
I IfJ I 0
I INI O
III I I
0
I I
1211 SIZ'
it
FIRI
■ VAL
................... F R Ej
I
- -- G.K
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
H/
I..............................
�I
III
III
III
III
III
I�
I�I I
6H
6R
E R ®R
/ 1
1 I
/ PROPOSED
/ PROJECT BOUNDARIES
/ NUMBERS REFER TO ,
/8 PROPOSED SEQUENCE
OF PROJECTS
/
EXISTING WATER SYSTEM
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO. 11
0
J Lt " i Lt
6 T
I - - - - -- -_III
= r------ -- tom-
II
II ,
II L..........1fi .............................. I
J L -- -- - -- - -- - - - - - - -
-- - --- - - - - --
III - ..- .:6- ..- .- .- ..- ...-..�.I
I,
6 I I
III I �
111 I
II I
------ - - - - -- - - - - --
-- - - - - - - - - - - - -
- - - - - --
III I I
III
111 4 I I
111 III
II
J�L ,
l
I I LII�
I I 111
I I I
I I
I 1 4111
I I Z 111
J 12 �+
--- -- - - - - -- - - - - --
1� �I
III VY
6• I I 1�1 6.1
I� ICI
I IM
III I I
1....... I ..............................
I it
I III
I III
I 16" III
I III
I III
T14 \ABANDONED BY
n STATE OF MINN
1611
Is,
- --- - -- - - - -- IZ.r- - -L -/1
1S 1
/
------ - - - - - -- - -- 6 - - - -y�
/ 2
1 I
I /
/ — PROPOSED
/
PROJECT BOUNDARIES
I / NUMBERS REFER TO ,
OF PROPOSED OUENCE
- - - - -- WA.y , ♦ //
I , /
1211 SIZI /
t
■ VALE
I
.............. FR
-- G. N) w '
r
■ PRO PROPOSED WATER SYSTEM
PRO
PRO CATHEDRAL AREA
WAl GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
i� I
y HOUSING' AND REDEVELOPMENT I JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA I,
tl 63 WEST JACKSON BOULEVARD HARRISON 7 -2180
CHICAGO 4, ILLINOIS MAP NO. 12
♦
j,
v
F
j[10000DI300013 o ,
11 o °p D m Q° E3 p'
re p 1313 D
oaao❑ood ❑a❑ o0a 0Ou13
a
Q�� �paoq 4
ao 00 13 u Q
mo o
good D0 0 0000000
°O� �D13 0oa o
000❑❑ ❑o000p 0
0 DoQQoo00B ODU00
° n a 0 0
00000000 0013 Is
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
T
!1
ILLUSTRATIVE SITE PLAN
I
I
} JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO.
CATHEDRAL
AREA
GENERAL NEIGHBORHOOD
RENEWAL PLAN
MINNESOTA R -17 (GN)
ST. PAUL MINNESOTA MAY 1, 1963
j,
I
G
�I
a❑o00000000 o Ea04f
D O ❑ DD D n D W 17D D'
° D Ep u U 0 cc
❑ddd0aadOd0 0Qd " Fo oabn
t
0
Q
goo p 000 00 0 90
D ° °
Ouo °D p
D
0 oa poa �a �ooga�o r.
0000000
0 00a 00 0 '
Q
0 00 0 013 00 00 G
R 000QQ0000ao59DO -
�pOp0000a00�aa
000 a n0000 Q�
' i
o;,
ILLUSTRATIVE SITE PLAN
I
r CATHEDRAL AREA
F
GENERAL NEIGHBORHOOD RENEWAL PLAN
I MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
1, -
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL I URBAN RENEWAL AND CITY PLANNING CONSULTANTS
55 EAST 5th STREET
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
,; MAP NO,
0 0
N
BvAlwt
MEOW
M 13-111
lwm�l
1"I
I
JT
l
m
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
i r �-
I I I I
I I I I
I I 1 I
I I 1 I
I I I I
-- - - - - - - - - - - - -- -- - - - - - -- -- - - - - - - -
Ild
Mas
a
2
1
PROPOSED
PROJECT BOUNDARIES
3
NUMBERS PEFER TO
PROPOSED SEQUENCE
OF PROJECTS
EXTERIOR
STRUCTURE CONDITION
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
lMINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
i` JACK MELTZER ASSOCIATES
i URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
P NO.
z
O
w
U)
U)
0 w
O
Z
w Te
M 0
Z 0
LLJ _j
W
—j >
M
(1)
cr
0
J
0
14
I.-
z (D
UJ
MZ
-
UA F3
I
0
00
Z
W U.
m- 0
w
.4 m
CD
R
ti
w!-0
a)< I
00�-
IL
OF3
L9
mw
R- e-, W
figure no. 1"'�
<-j
-t
3:4
W
4
14
I.-
z (D
UJ
MZ
-
UA F3
I
0
00
Z
W U.
m- 0
w
.4 m
CD
R
ti
w!-0
a)< I
00�-
IL
OF3
L9
mw
R- e-, W
figure no. 1"'�
STREET
- . . ... ..
II
II
tl
9 ........................... ... .. .... .......................................................
-- - - - -
�qqq - - - - - - - - -
. .............................................. ........
r — — — — — — — — — — — — — -- k--- - - - - --
w
— — — — — — — — — — — — — — ........................... ........ ......... TO PROPOSED ROUTE 14
3611 I i
..... ....... CFIA t)ArE SYST I EM
36
0
IP-
ot,
J,
II II W
TO PROPOSEDVD
lull 5 21" 21
lad
Irl
AREA.
GENERAL NEIGHBORHOOD
J
MINNESOTA R-17
(GN)
ST. PAUL ,
MINNESOTA MAY 1, 1963
12
0
e
HOUSING AND REDEVELOPMENT
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET
SAINT PAUL, MINNESOTA
X12" 0 AVENUE
PROPOSED
PROIEC I BOUNDARIES
NWIBE RS REFER 10
PROPOSED SEOUENCE
OF PROJECTS
BOUNDARIES OF STORM
WATER DRAINAGE AREAS
CATHEDRAL
AREA.
GENERAL NEIGHBORHOOD
RENEWAL PLAN
MINNESOTA R-17
(GN)
ST. PAUL ,
MINNESOTA MAY 1, 1963
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD • HARRISON 7-21150
CHICAGO 4, ILLINOIS
r
0
3
k. /A I n CU KH L HKCH
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET 'URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7 -2180
CHICAGO 4, ILLINOIS
MAP NO. 13
w
J..E -rn
J�
. rl
II
18 "IjP
--- - - - - --
121. 12
— r - - -- - -4 STREET /41
I 12 12 1
12" I I
1 — — —19' HPry3" 1
II III I
I�- - - - - -- -- — — — — — — Y__ —_ —_
—$ - - -_ - -- Tf�— 4 I 4 11
III I I Ij
II I 14 I 14"
I I11 I I I I
�
I I
J- - - - --
- = - =- _- _- IIIIIIII rI ■ I
— 4� -- -- -- --- - - - -_ - I II E" -
4 — 4 n ----- L ------
2 11318 HP - - - w�I l —
-
-
II IFj4,. `�Q 4.. a2..
t I I 1 INj a
J _ � 4 4 4;=i 4-
---- �-
-�
I l I
I ld I: F
18 "HPn1 2
I
I UI I
J IV Fd
B "�' 2' 18 "HPIJ2"
°P ,III
Id II
4_�,I 11
— li - - - -- it - - - - --
1 In n
0
0
2.F
...................
I I II
II i
t 4„
I I Ii
I II
II I
112
W
2
I
PROPOSED
PROIE0 80UNDARIES
NUmpERS REFER 70 3
PROPOSED SEOUENCE
OF PROlEC75
EXISTING GAS
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R -17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA S 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO. 15
1
LI
J t�
1!r
�II
d
etc----- - - - - -_ -_ rr - - - - -- �
,jr— —— — — — — — — — — — — — X STREET
Ij1 tj
I.I l
I!I I
JI-- — — — — — — — — — — — — — - - - - - -_ --- -- - - -- - - - - -- - - - --
�� �• —• —•— — •—.•_._............ Ij1 I I
.\ .. � ..........................i
•I � 111 I I
!I Ij1 II
J!I
�---- - - - - -- ' - -- - - - - - - - - - - - Jj�-- - - - - -J --- - - - - --
1!/ — — — — — — — — — — — — — — — — — — — — —. — — — — — — — — I
4 111 ! III I w
II
_._._._. —. —. —. ._
f r�
Ijl C II
Jjl i ��1
jI
Ijl LI f Ij• �
LI I I tf
II1 1.1 I 0 1 ••t ............. ............................... III
JIB i l °
.:..;� WCO .. ..:.r... -. :..- ... . I ....... a
11 I I I
Ijl I= I! I I
I
I._._._._._. _._._._._.. ....... 1
IFJ ........ ..............................: % .................. �1 1 SJtE'
Ili IU1 , �
11
I I
f I �
I j
---------------------
o A 2 I
I I
PROJECT BOUNDARIES
NUMSERS REFER TO 3
PROPOSED SEOUENCE
I OF PROJECTS
.._._._.. UNDER
................... AERIALI ��..
a�E
- - - -- F R E E W;
—'— G.N.R P.I
I
EXISTING TELEPHONE
CATHEDRAL
AREA
GENERAL
NEIGHBORHOOD
RENEWAL
PLAN
MINNESOTA R -17
(GN)
ST. PAUL , MINNESOTA MAY 1, 1963
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS
MAP NO. 16
JACK MELTZER ASSOCIATES
URBAN RENEWAL AND CITY PLANNING CONSULTANTS
53 WEST JACKSON BOULEVARD • HARRISON 7 -2150
CHICAGO 4, ILLINOIS MAP NO. 17.
U
A
AVENUE
�110
o�
%
%
2
— PROJECT PROPOSED
BOUNDARIES
NUM E. REFER
To
PROPOSED
BOUNDARIES
NUMBERS REFER TO 3
PROPOSED SEOUNCE
0 0
,
PROJECTS
PROJEC IS
PROPOSED ZONING
CATHEDRAL AREA
GENERAL NEIGHBORHOOD RENEWAL PLAN
MINNESOTA R-17 (GN) ST. PAUL , MINNESOTA MAY 1, 1963
I
HOUSING AND REDEVELOPMENT JACK MELTZER ASSOCIATES
AUTHORITY OF THE CITY OF SAINT PAUL
55 EAST 5th STREET URBAN RENEWAL AND CITY PLANNING CONSULTANTS
SAINT PAUL, MINNESOTA 53 WEST JACKSON BOULEVARD • HARRISON 7-2150
CHICAGO 4, ILLINOIS 0.18.
I LLJU UZ
oMhv
i
nY
I
ZVo
_O z
l�
�- -JO
QOc
O Z >
/
U Q
(n J
J d
V {.9
Z = Y
Ld
J°
0
0'
LLi0
a
J
}a
I JC13
Z_
Y Y
U
J
N
ilk I I �kmll
AL
za
oz
H=
C., 0
Z cr
�Q
J
LLa
}M
m Y
yaa
0
w
V)
o w
n. o
o Q
ir a
CL N
U z
oW
Qa
w0
X U
Q _
J
W m
U D
>a
ir
W
U)
0 0
SUMMIT—DALE COMMUNITY
[::PROJECT • I
V. S. INTERSTATE 9
MARSHALL AVE.
SUMMIT-DALE COMMUNITY
110 G.N.R.P. BOUNDARY
SuMm/r AVE.
MACALESTER
COMMUNITY
.:.*:::::,WEST- SEVENTH
CLAIR
5 T. STREET COMMUNITY
- a :
gum*
(t
7.-
MT. AIRY
)MMUNITY
�o m
figure no.
tu
tii.-WINNEHAHA AVE.
HAMLINE
COMMUNITY
THOMAS-DALE
COMMUNITY
. .. . . . ........
[::PROJECT • I
V. S. INTERSTATE 9
MARSHALL AVE.
SUMMIT-DALE COMMUNITY
110 G.N.R.P. BOUNDARY
SuMm/r AVE.
MACALESTER
COMMUNITY
.:.*:::::,WEST- SEVENTH
CLAIR
5 T. STREET COMMUNITY
- a :
gum*
(t
7.-
MT. AIRY
)MMUNITY
�o m
figure no.
W
w
Z
J
Z
3
Y
4
x
0
h
0
x
W
J
ft
SCHOOL BOUNDARIES
h
to
Q
O
h
U
h
h
W
Q
O
W
¢
x
ti
y
.p
O
m
F
N
a
ELEMENTARY SCHOOL BOUNDARY
JUNIOR HIGH SCHOOL BOUNDARY
G.N.R.P. BOUNDARY
figure no. 6
I
t9
,Z
V/
D
Z
O
Q
U
O
WcI
cr
W
2
O
Z
W
J
0
G
J
U
a
LL
O
w
figure- no. 7
Ri
yy./
4�1 ✓,fir - I
"�tV" Cal' Y/ �
- s�' ,f S•.
�
�'Cf
i
,�y�•l
a��r�J•J
. •
y'Y
,
I
t9
,Z
V/
D
Z
O
Q
U
O
WcI
cr
W
2
O
Z
W
J
0
G
J
U
a
LL
O
w
figure- no. 7
imp., �P
t '..
_sr
figure no.9
au
ti
! & 101
.. . . . . . .
.....
„+ ....
x?Nr
10. 10