Loading...
215107w s ' c Council File No.......... By................ - ....... -................... CITY OF ST. PAUL _'U _V / l .il File No. 215107- : the matter of the 'assessment of fits, costs and expenses for oving LEXINGTON PARKWAY •3.TH from the Northern Pacific ay Company Bridge . (souther F k; ;amine Avenue), to the exW-7 a:,- 384 feet northerly f b Vari Slvke Avin' -4 Resolution Ratifying Assessment In the matter of the assessment of benefits, costs and expenses r� for improving LEXINGTON PARKWAY NORTH from the Northern Pacific'Railway Company Bridge (southerly of Jessamine Atenue), to the existing bridge at 384 feet northerly of the center line of Van Slyke Avenue by widening the existing roadbed to a 57 foot width; by grading and paving the widened areas with new concrete base and asphaltic concreth surfacing; by resurfacing the existing roadbed with new asphaltic concrete surfacing and repaving said roadbed with new concrete base and asphaltic concrete surfacing where structurally unsound and not to proper alignment or grade; by paving street and driveway returns; by constructing new curbs and_side- walks; by,constructing 48" storm water sewer and reconstructing storm water drain- age facilities; by reconstructing the paving, curbing and sidewalks on the inter- secting streets where not in conformity with said improvement; by constructing sewer, water and gas service connections from street mains to the property lines _ where necessary; by reconstructing the existing traffic control system and by doing all other work which is necessary and incidental to complete said improve - A m_ent 4 A public hearing having been had upon the assessment for the above improvement, and said assessment having been further considered by the Council, and having been considered finally satisfactory, be ,it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to eubmitted to the District Court of the County of Ramsey for confirmation. BE IT FUR R RESOLVED, That the said assessment be and it is hereby determined to be payable in ......................j --- equal installments. OCT 16 1963 Adopted by the - CounciL ............................................ ...... - 19......... OCT 16196' Approved---------------- - ------------------------------------ 19-------- File #15232 Form B. B. 18 Councilman Dalglish Councilman Holland Councilman Loss Council* -n Mortinson Councilman Pete) s0 CouncilmanRos� Mayor r `!... �.. ., City Clerk. ... ------- ...... ----- ... _ ................ -........................... � Mayor. CITY OF ST. PAUL OFFICE OF THE COMMISSIONER OF FINANCE Report of Completion of Assessment September 17,_19 63, In the matter of the assessment of benefits, c osts and expenses for improving LEXINGTON PARKWAY NORTH from the Northern Pacific Railway Company Bridge (southerly of Jessamine Avenue), to the existing bridge at 384 feet northerly of the center line of Van S1yke Avenue by widening the existing roadbed to a 57 foot width; by grading and paving the widened areas with new concrete base and asphaltic concreth surfacing; by resurfacing the existing roadbed with new asphaltic concrete surfacing and repaving said roadbed with new concrete base and asphaltic concrete surfacing where structurally unsound and not to proper alignment or grade; by paving street and driveway returns; by constructing new curbs and side- walks; by constructing 48" storm water sewer and reconstructing storm water drain- age facilities; by reconstructing the paving, curbing and sidewalks on the inter- secting streets where not in conformity with said improvement; by constructing sewer, water and gas service connections from street mains to the property lines where necessary; by reconstructing the existing traffic control system and by doing all other work which is necessary and incidental to complete said improve- `J ment 11 The Commissioner of Finance hereby reports to the Council the following as a statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction . ............................... $ 136,225.29 Engineering ........ ..............................$ 11 ,030.92 Inspection fees ...... ..............................$ 2,225.10 Postal cards ............................ ..........$ 3.30 Publications ........ ..............................$ 33.00 _ Court costs for confirmation ........................$ 3.30 Total expenditures. .... .. ....... .. $ 149,520.91 Charge to P.I.R. 3901 reimburse from MBA 62- i59 -o2- $96,315_8 45 $R.�801 jgjm�urse frRT 31 -E ssessme Said Commissioner further reports that he has assessed and levied the total amount as above aster -$7,0 2 914 tained, to -wit: the sum of $ 149,520.91 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. zM 12-r,2 8 Com ssioner Finance.