Whereas, Additions which might prove to be necessary in the Improvement described
as the SANITARY SEWER RELOCATION ON INTERSTATE HIGHWAY 94 from Mackubin Street to Far-
rington Street, Comptroller's Contract L -6610, Hurley Construction Company, Contractor,
have been provided for in the Specifications, and
Whereas, It has been found necessary to make the following Additions:
ADDITIONS
Subsequent to the p relim.inary agreement between the State of Minnesota and the
City of St. Paul for the relocation of sanitary sewers in the north and south frontage
roads along Interstate Highway No. 94 between Mackubin and Farrington Streets the Con-
tractor for the State on Interstate Highway No. 94 placed embankment on the south
frontage road to provide a foundation for the sewer installation. However, the embank-
ment was placed to an elevation substantially above that indicated in the plans so the
sewer Contractor was forced to dig a deeper sewer trench than was anticipated in the
plans. This additional sewer trench excavation to be paid for in accordance with the
Schedule of Prices for extra work as follows:
and
Sewer trench excavation to a depth of 12 ft. - 261 Cu. Yds. @ $3.50 $913.50
Sewer trench excavation below depth of 12 ft. - 120 Cu. Yds. @ $4.00 4$0.00
Total additions this agreement $1,393.50
Whereas, The total addition is $1,393.50, now therefore be it
Resolved, That the City of St. Paul through its City Council approves the fore-
going additions made in accordance with the Specifications in the sum of $1,393.50, said
amount to be added to the lump sum consideration named in the contract, known as Comp -
trolleros Contract L -6610, and which amount is to be charged to Utility Relocation
Agreement No. 53661.
The Commissioner of Public Works has agreed with the above named Contractor
that the sum of $1,393.50 is the correct amount to be added to the above contract.
DEC 10 10
COUNCILMEN Adopted by the Council 19—
Yeas Nays
Dalglish E C 1 '�
Holland A pproved 19—
Loss
In Favor
Mortinson
Peterson . Mayor
Rosen Against
Mr. President, Vavoulis
10M 6-62
r
DUPLICATE TO PRINTER 215 ' aJ 65
_ CITY OF ST. PAUL FIOENCIL NO.
r ^ OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY iilton Rome
COMMISSIONER DATE
Whereas, Additions which might prove to be necessary in the Uprovomont described
as the SANITARY SSM RWXATION ON =WTATE HrA WAY 94 ftoa MackubIn. Street to ft%,
ringtan Street Comptroller's Contract t4A10, Hurley 0onatrugtion Comp=y, Contractor,
have been prow, for it the Specifications, and
Whereasy It bas been round neressasy to make the fbUowing A,dditlonsv
AWALM
Subsequent to the p acel.iminary agr"seitent betwean the State of Mimissota and the
City of St. Fhul for the relocation of sanitary aware In the north and south frontage
roads along Intesresteto Highway-No, 94 between Maukubin and iarrUg1ton Strests the con-
tractor for the States on Interstate Highway 1904, % placed embankment on the mouth
frontage road to provide a foundation for the sewer installation, Haw+evari the ambank-
sent was placed to an, elevation substantlall.y above that indioated; in the plans so the
sewer Contractor vas forced to dig a deeper sewer tranah than was anticipated in the
plawo This additional *ewer trench Immution to be paid for In acoordance with tboo
Schedule of Prices for extra work as follow at i
and
Sewer trench excavation to a, depth, of 12 ft. 261 Cu. Yds+ @ $3.$0 #913.50
Sewer trench excavation below depth of 12 ft. 120 Cu. Yds. 0 $4.00 4W.00
Toted additions this a fire amend $4393.50
393.50
Whereas, They total addition is $1*393.501 now therefore be it
Re:satved c, That the City of St. Paul through its City Goticil approves the fore_
going additions made In accordance with the Specifications in the aum of $$1#393.50, said
amount to be added to the lump am consideration named In the contract, known as Comp -
trollerts Gontract 1"667. * and which amount Is to be chargod to Utility Relocation
Agreement, No* 53661,t
The Ca=i4 sioner of Pablic Works has agreed with the above named Contractor
that the am of $11393,50 is the correot az=t, to be added to the above contract.
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 8-82
In Favor
Against
peg A , 1
Adopted by the Council 19—