213263ORIGINAL TO CITY CLERK ` ' 21326")
CITY OF ST. PAUL COUNCIL NO. _0.l
OFFICE OF THE CITY CLERK —
COUNCIL RESOLUTION— GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
RESOLVED, That the proper City officials are hereby
authorized and directed to execute, on behalf of the City
of Saint Paul, an agreement between said City and the State
of Minnesota, Department of Highways, which agreement, entitled
"Utilities Relocation Agreement ", the same being Agreement No.
53728, contemplates the relocation of certain utilities and
police and fire alarm facilities in connection with the con-
struction of Trunk Highway No. 35E - Trunk Highway No. 94 Interchange
of the - Capitol Approach Area in the City of Saint Paul, a copy
of which said agreement No. 5371 ?$ is hereunto attached and made a
part hereof by reference.
COUNCILMEN
Yeas Nays
Dalghsh
Holland
Loss
Mortinson
Peterson
Council File No. 213263 —By Milton
Rosen —
Resolved, That the proper City offi-
cials are hereby authorized and di-
rected to execute; on behalf of the
City of Saint Paul, an agreement be-
tween said City and the State of
Minnesota, Department of Highways,
which agreement, entitled "Utilities
Relocation Agreement ", the same be-
ing Agreement No. 53728, contem-
plates the relocation, of certain utili-
ties and.police and fire alarm facilities
in connection with the construction I
of Trunk Highway No. 35E -Trunk
Highway No. 94 Interchange of the
East Capitol Approach Area in the
City of Saint Paul, a copy of which i
said agreement No. 53728 is hereunto
attached and made a part hereof by
reference.
Adopted by the Council June 11, 1963. 1
Approved June 11, 1963.
(June 15,, 1963)
Rbsen-
Mro resident, Vzmalis-- �a-� �„✓
10M 6-62
In Favor
__0 _ Against
RECEIVED
JUN 7 1963
DEPT. OF PUBLIC WORKS
TRAFFIC BUREAU
al)N 111963
Adopted by the Council 19—
App oved�� 9 19-
a _
Mayor
getir�g
DUPLICATE TO PRINTER / }�63
CITY OF ST. PAUL COUNCIL NO.
• OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
RESOLVED, That the proper City officials are hereby
authorized and directed to execute, on behalf of the City
of Saint Paul, an agreement between said City and the State
of Minnesota, Department of Highways, which agreement, entitled
"Utilities Relocation Agreement ", the same being Agreement No.
53728, contemplates the relocation of certain utilities and
police and fire alarm facilities in connection with the con-
sLA truction of Trunk Highway No. 35E - Trunk Highway No. 94 Interchange
pitol Approach Area in the City of Saint Paul, a copy
of which said agreement No. 537$ is hereunto attached and made a
part hereof by reference.
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Va�-
10M 8-88
jUN 111963
Adopted by the Council 19—
JUN 1119'63
Approved 19—
In Favor
Q Mayor
Against
THE DEPARTMENT OF PUBLIC WORKS
Mr. Eugene V. Avery
Chief Engineer
Department
Dear Mr. Avery:
CITY OF ST. PAUL 4,13 3 R E C E I
INTER - OFFICE COMMUNICATION
JUN 4 1963
8 DEPT. OF PUBLIC WOR)(5
CHIEF ENGINEER
June 3, OCEIVED
1963
JUN 7 1963
DEPT. PUB BUREAORKS
?RAOf f
Re: Utilities Relocation Agreement No. 53728
City of St. Paul
Police Alarm Facilities
T.H. 35E - T.H. 94 Interchange
East Capitol Approach Area
I am attaching hereto four copies of Utilities Relocation Agreement
No. 53728 between the Minnesota Highway Department and the City of St. Paul,
submitted under date of May 28, 1963, by Mr. D. R. McFadden, Deputy District
Engineer, this agreement covering relocation of City -owned fire and police
alarm facilities as necessitated by the Trunk Highway No. 35E - Trunk Highway
No. 94 Interchange construction in the Capitol Approach Area.
Following your examination of this agreement, will you kindly submit
it to the Corporation Counsel for approval as to form and preparation of the
necessary resolution authorizing execution on behalf of the City Council.
Upon execution and return to this office, I will see that the four
copies are forwarded to the Highway Department.
Thanking you, I remain
Yours very truly,
George M. Shepard
Street and Highway
Engineering Coordinator
GMS: gt
Attachments
.- - -
STATE OF MINNESOTA
DEPARTMENT OF HIGHWAYS
CONSTRUCTION DISTRICT 9
1246 UNIVERSITY AVENUE
ST. PAUL 4
May 28, 1963
Mr. George Shepard
Streets and Highway Engr. Coord.
City of St. Paul
Court House
St. Paul 2, Minnesota
2.3263
Re: Utilities Relocation Agreement No, 53728
City of St. Paul
Police Alarm Facilities
T.H. 35E - T.H. 94 Interchange
Dear Sir: East Capitol Approach Area
Transmitted herewith are four copies of an Agreement between
this Department and the City of St. Paul relative to the relocation of
City -owned fire and police alarm facilities as necessitated by Trunk
Highway No. 35E - Trunk Highway No. 94 Interchange construction in the
Capitol Approach Area.
If the Agreement meets with your approval, please submit it
to the City for approval and execution.
When it is executed by the City, all four copies should be
returned to this office together with four certified copies of a new
resolution passed by the City Council authorizing its officers to execute
the Agreement in its behalf.
Two copies of the Agreement will be returned to the City when it
is fully executed by the State.
Sincerely,
DEPAi 2kh;hT OF HIGEWAYS
D. R. McFadden
i4iclosure Deputy District Engineer
MINNESOTA HIGIUAY DEPARTMENT
DEPT. IDENT. ITEM
EST. AM'T. RECEIVABLE
ALLOT. QTR. FUND
Agreeeent between
The State of Hinneseta,
Department of Higlnways, and
The C{ttr -S LA'- Pahl. Mi�1120a5"
Re: Relocation, Fire & Police Alas Facilities
T.S.35$ - T.H.94 Interchange
E. Capitol Approach Area
21.3
AGREEMENT NO
53728
AMOUNT ENCUMB.
S.P.
FED. NO. I 35E-4 (48) 113
THIS AGREEMENT made and entered into by and between the State of
Minnesota, Department of Highways, hereinafter referred to as the "State", and
the City of St. Paul, Minnesota, acting by and through its City Council, here-
inafter referred to as the "City ",
WITNESSETH:
WHEREAS the State has prepared plans for the construction of a Trunk
Highway No.
35E - Trunk Highway No. 94 Interchange of
the East
Capitol Approach
Area in the
City of St. Paul as part of the National
System of
Interstate and
Defense Highways; and
WHEREAS, the construction of said Trunk Highway Interchange frill re-
quire the relocation of certain City owned police and fire alarm facilities
inplace at the site of said Interchange; and
WHEREAS the State is about to award a contract for the construction
of said Trunk Highway No. 35E - Trunk Highway No. 94 Interchange in accordance
with plans therefor, designated as State Project No. 6280 -95, and in the records
53728
of the Federal Bureau of Public Roads as Minnesota Project I IG 35E-4 (49) 114;
it is proposed that said police and fire alas facilities be relocated as re-
quired by said construction, and it is desired that said relocations be performed
by the City, with the State reimbursing the City for costs incurred by the City
as hereinafter bet forth; and
WHEREAS Title 23, United States Code, Section 123, (Federal Highway
Act of 1958) provides:
"When a State shall pair for the cost of relocation of utility facilities
necessitated by the construction of a project on the Federal -aid primary or second-
ary systans or on the Interstate System, including extensions thereof within
urban areas, Federal funds nay be used to reimburse the State for such cost in
the sass proportion as Federal funds are expanded on the project. Federal funds
shall not be used to reimburse the State under this section when the payment to
the utility violates the lax of the State or violates a legal contract between
the utility and the State. Such reimbursement shall be made only after evidence,
satisfactory to the Secretary shall have been presented to his substantiating
the fact that the State has paid such post from its own funds with respect to
Federal -aid Highway projects for which Federal funds are obligated subsequent to
April 161, 1958, for work including relocation of utility facilities ", and
WHEREAS Minnesota Lave 1959, Chapter 500, Article II, Section 461, sub-
division 2 provides:
"Whenever the Commissioner of Highways shall determine that the re-
location of any utility facility is necessitated by the construction of a project
on the routes of Federally -aided State trunk highways, including urban extensions
thereof, which routes are included within the National STstez of Interstate High -
veye, the owner or operator of such utility facility shall relocate the same in
accordance with the order of the Commissioner. After the completion of such
relocation, the cost thereof shall be ascertained and paid by the State out of
Trunk Highway Minds; provided, however, the amount to be paid by the State for
such reimbursement shall not exceed the smaunt on which the Federal Govez nt
bases its reisbursesent for said Interstate System "; and
WHEREAS Minnesota Lava 1959, Chapter 500, Article II, Section 46, sub-
division 1, paragraph 2 provides:
"Cost of relocation means the entire amount paid by such utility pro-
perly attributable to such relocation after deducting therefrom any increase in
the value of the new facility and any salvage value derived from the old facility ",
and
WHEREAS, Policy and Procedure Memorandum No. :30-4, dated December 31,
1957s duly issued by the U. S. Department of Commerce, Bureau of Public Roads,
and made a part hereof by reference, requires a written agreement specifying
-2-
53728
the work to be performed by a utility compaW for Which reimbursement from
Federal Minds is sought:
NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS:
I
This Agreement is made in accordance with and pursuant to said Policy
and Procedure Memmoran8um No. 30-4, dated December 319 1957, and amY supplements
or revisions thereto, and U. S. Department of Comomerce Instructional Memorandum
30..3 -619 dated May 8, 1961; subject, however, to provisions of all applicable
State and Federal Laws and arq-other applicable lava or regulations. Said Mem--
orandums, including any supplements or revisions thereto, are as much a part of
this agreement as though fully set forth herein.
II
(a) The City shall relocate its Fire and Police Alarm Facilities
as required by said Trunk Highway No. 35E - Trunk Highway No. 94 Interchange
construction substantially in accordance with "Exhibit A" attached hereto and
made a part hereof. Said Exhibit "A" shove the approxinate location of the work
to be performed by the City hereunder. The City shall perform said work with
its own forces, and shall furnish all labor, material and equipment required in
connection therewith.
It is understood that the City shall coordinate its work with the
work to be done by the State's contractor, and shall cooperate with him to the
and that the work of both will proceed in an orderly and expeditious manner.
(b) The City shall obtain a permit from the State to perform agy
work upon the trunk highway right of way. Application for such permit shall be
made to the said District Engineer on "Application for Utility Permit" Form No.
2525• The City shall also give the District Engineer of the Department of
Highways five days prior notice of its intention to start the work to be performed
by the City hereunder.
_3-
PMbBz.Fi2
53728
III
Except in case of an emergency requiring immediate action to safeguard
persons or property, the City will have no right, after it hen performed the
work contemplated by this agreement, to make ate► excavation or installation with-
in the trunk highway right of way for said Trunk Highway No. 35E or Trunk Highway
No. 94 for aZW purpose whataoever without a permit from the COMMinsioner of High -
wVs. In case of an emergency as defined in the next preceding sentence, the
City will i=*diately notify the Minnesota State Highway Patrol and take all
n
necessary and reasonable safety measures to protect the traveling public and will
cooperate fully with the said Patrol to that end.
Iii
The City shall without coat or expense to the State maintain the Police
and Fire Alarm facilities and appurtenances thereto relocated hereunder.
V
After completion by the City of the work to be performed hereunder,
the City shall furnish the State with an itemised statement claiming reimburse -
ment for work performed hereunder.
The statement to be furnished by the City ahall show the actual coat
of performing the work referred to in Article II. It is contemplated that the
Federal Government will reimburse the State in the amount of 90 percent of the
relocation costs paid by the State to the City. The actual cost of such re-
location shall be determined by the State and the coat thereof shall be paid by
the State out of trunk highway funds, provided, however, the amount to be paid
by the State for such relocation shall not exceed the amount on which the Fed-
eral Goverrment bases its reimbursement for such relocation under said Policy
and Procedure Memorandum No. 30-4. It is expressly understood that the State
may pay up to 80 percent of the amount shown on said itemized statement without
prior audit of the account by the Federal Goverment and without prior determination
-4-
53728
by the Federal Goverment of the amount upon which it will base its reinburse-
ment to the State. It is further expressly understood that in the event that
az► amount paid by the State is in excess of the amount upon which the Federal
Government bases its reimbursement, the City, upon notice from the State, shall
forthwith pay over to the State the difference between said amounts.
The cost of relocation provided for in the preceding paragraph shall
seen the amount paid by the City properly attributable to such relocation after
deducting therefrom any betterment of the new facility, any increase in valui,
including but not limited to credit for extended service life, and any salvage
value derived from the old facility being relocated.
It is agreed that the utility relocations provided for herein will
not extend the useful service beyond the time when the overall facilities of
which they are a part will remain in service.
All actual and related indirect costs of the City shall be accumulated
in accordance with its established accounting procedures. The City shall keep
its records of work performed and costs and expenses incurred in accordance with
said Policy and Procedure Memorandum 30-4 in such manner that said accounts may
be readily audited. The work to be performed by the City shall be under the
general supervision of said District Engineer, and shall be performed to his sat-
isfaction before payment is made by the State to the City as hereinafter provided.
VI
Statements submitted by the City to the State for payment for work
performed hereunder shall be in septuple and contain thereon a certification by
a responsible City official to the effect that all of the itsm therein are true
and correct and have been expended upon the work performed under the provisions
of this agreement.
It is estimated that the cost of work to be performed hereunder is in
the sun of $1,600.70 as set forth in the attached statement designated as Exhibit
"B ". In the event it appears at ar► time that such cost will exceed said sum,
-5-
----f,-2
53728
the City shall
promptly notify the Utilities
and Agreements
Engineer of the
Department of
Highways thereof in order that
the State my
encumber such
additional funds as nay be deemed necessary.
VII
The City indemnifies, seven and holds harmless the State and all of
its agents and employees of and from any and all claims, demands, actions or
causes of action of whatsoever nature or character arising out of or by reason
of the execution or performance of the work to be performed by the City provided
for herein and further agrees to defend at its own sole coat and expense any
action or proceeding comaaenced for the purpose of asserting any claim of what-
soever character arising hereunder by virtue of the execution or performance of
the work to be performed by the City as provided for herein.
VIII
It is further agreed that any and all employees of the City, and all
other employees While engaged in the performance of aror work or services required
,or provided for herein*to be performed by the City, shall not be considered em-
ployees of the State, and that any and all claims that may or might arise under
the Workmen's Compensation Act of the State of Minnesota on behalf of said em-
ployees while so engaged and any and all claims made by any third parties as a
consequence of any act or omission on the part of said City employees while so
engaged on any of the Work or services provided to be rendered herein shall in
no way be the obligation or responsibility of the State.
IZ
Before this contract becomes binding and effective, it shall be approved
by an appropriate resolution of the City Council, and it shall also receive the
approval of the Bureau of Public Roads and of such State officers as the law
may provide in addition to the Commissioner of Highways.
MM
53728
IN TESrIMNY WHEREOF the parties have duly executed this agreement
by their duly authorized officers and caused their respective seals to be
hereunto affixed.
(City seal)
Counteraigned:
City Comptroller
Approved as to form:
Corporation Counsel
-7-
CITY OF ST. PAUL:
BY
Mayor
By
City Clerk
�Comi ssioner of Public Worka
DEPARTMENT OF HIGHWAXS
Recommended for approval:
District Engineer
Utilities and Agreements Engineer
Approved as to form and execution:
Special Assistant Attorney General
STATE OF MINNESOTA )
ss
COUNTY OF RAMSEY }
53728
gyma • •m •
Commissioner of Highways
By
Road Design Engineer
Date
Date of Agreement
APPROVED:
Commissioner of Administration
By.
Authorized Signature
On this day of , 1963, before me personally
appeared , to me known to be the Road
Design Engineer, acting for the Commissioner of Highways of the State of Minnesota, and
the person described in and who executed the foregoing instrument in behalf of the
State of Minnesota, and the Commissioner of Highways, and acknowledged that he
executed the same as the free act and deed of the State of Minnesota.
10
EXHIBIT B AGREEMENT NO. 53728
STATE OF 14INNESOTA DEPARTME14T OF HIG91AYS
CITY OF ST. PAUL, MINNESOTA
COST ESTIMATE
Location of New Lines
North side of Twelfth St. from Robert St. to alley east of Robert St.
Ninth St. from Wacouta St. to Sibley St.
Broadway from Tenth St. to Grove St., on Grove St. from Mississippi St. to Pine St.
Wacouta St. from Ninth St. to alley north of Seventh St.
Remove Inplace Lines
South side of Twelfth St. from Robert St. to alley east of Robert St.
Sibley St. from Ninth St. to Tenth St., on Tenth St. from Sibley St. to Wacouta St.
Wacouta St. from Ninth St. to Tenth St.,on Tenth St. from Wacouta St. to Broadway
Wacouta St. from Ninth St. to alley north of Seventh St.
Ninth St. from Wacouta St. to Rosebel St., on Rosebel St. from Ninth St. to Eighth St.
Relocate Call Boxes
Eighth and Rosable to Spruce and Broadway
S. E. corner Robert and Twelfth to N.E. corner Robert and Twelfth
Material
3800 feet of No. 10 copper weld wire @ 137.28 per mile.
Miscellaneous material
Equipment
1 ton truck
3/4 ton truck
75 cfm compressor
Rte
1.15
0.95
2.00
Hours
75
75
8
Labor Rate IJOLAKS
Foreman 4.52 30
Electrician 4.03 220
Labor Additive
98.80
81.20
$1.80.00
Total
86.25
71.25
16.00
$173.50
Total
135.60
886.60
1022.20
X1247.20
MP TF,RIAL
180.00
EQUIPM IT
173.50
LABOR
,;x1247.20
TGT1 L LSTIlUkTED RELOCATIOli i;OS'T -
- $1600.70
Ja
•C -
• l EF � w �' �
/ < ��'
111, `�
�' �t'c - - — •
1 <
F14
J
1 -
`
I
1
Ae
vr
OOOIP
oA Vv
A`; .• 53728