Loading...
214128PUBLISHED 3- 3 ORIGINAL TO CITY CLERK 214128 CITY OF ST. PAUL FILENCIL NO. OFFICE OF THE CITY CLERK UNCIL RESOLUTION — GENERAL FORM `1 File No. 214128 - By Milton , ° ireas, Additions and Deductions PRESENTED BY might prove to be necessary in COMMISSIONS DATE ,TImprovement described as the ST. TER STREET -RONDO AVENUE 4 JRtgf ?WATER RELIEF SEWER; ea RONDn 'rte -TI. ^" q'4' WHEREAS, Additions and Deductions which +might prove to necessary in the Improvement described as the ST. PETER STREET - RONDO AVENUE STORM WATER RELIEF SEWER, SECTIONS I and II, and RONDO AVENUE AND RICE STREET SANITARY DIVERSION SEWERS, Comp- troller's Contract L -6307, Foley- Winston - Hurley, Contractors, have been provided for in the specifications, and WHEREAS, it has been found necessary to make the Additions and Deductions of the quantities and in the amounts more particularly set forth in the Change Orders numbering One (1) through Six (6 ) attached hereto and made a part hereof to -wit: Change Order No. 1 Change Order.No. 2 Charge Order No. Change Order No. Deduction Change Order No- 5 Change Order No. 6 TOTAL NET ADDITIONS 2, 95.15 3 7.00 139 .3 6 ( 6 .00) 30 .83 7,749.50 9 12, 64,9.8 , and WHEREAS, the- total net Addition is $ 12,649.84, now therefore, be 'it RESOLVED, that the City of St. Paul through it *s City Council approves the foregoing Addition made in accordance with the specifications in the amount of $ 125649-84, said amount to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L -6307, and which amouht is to be financed from Bond Fund 210, Code SE -17. The Commissioner of Public Works has agreed with the above named contractors that the sum of $ 12,649.84 is the correct amount to be added to the above contract. JUL 3 0 1963 COUNCILMEN Adopted by the Council 19— Yeas Nays T,..IaI;,.► JUL 3 0 1963 Holland ��- pproved 19— Loss In Favor ' Peterson � v Mayor ' Against Rosen Mr. President, ,Vavoulis font &62 � CITY OF SAINT PAUL - DtPARTMU OF PUBLIC WORKS 21411 CONTRACT CHANGE AGREEMENT NO. 1 PROJECT NO. bt+d•.,M _ CONTRACT NO. CO CTOR PROJECT DESCRIPTION St. Peter4nMa An. g *"M Water Val saf 9aw+� Ass I A IT In accordance with Section 95 of the Charter of the City of Saint Paul,•the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. iabstitution of ooaerete baakfill arotimd the pre -east shaft seetioa between elevation 49.25 to elevation 103.4 at the Rice- Roode soosss and drop shafts in place of the compacted earth or sand fill origiaallT speeifisd In order to yrovide stability and a rater seal for the shafts. Glass s Conorete 200 0a. Ids. 6 $15.50 $3100.00 SYbstitation of cement pout backfill around the pre -cast shaft at 0011090 1v0 in pla00 of the eompaeted earth or sand fill originally ar0 IMA. emont grout 33.85 Cu. Ids.' 4 $15.00 507.76 Substitution of 2" of stabilised gravel and a bituminous prize coat for a portion of the 28 bituminous ourfaoed area at the portal. Limp sm deduction 02.60 Net addition - this change agreement $2"5.11 This additional amount to be charged to Hoed Find 210, Code 33-17. Cons ruction Engineer ,Z 1 9 G3 FOLEY- HURLED'- Wh,6iu, (A PINT %E111URF) -- .Z 'ZG 19,43_ Contract l B Z/ 194 3 G 19 63 J12nu ±y Commissioner ' Original (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue) To Contractor To Accounting Div. To Comptroller To Construction Engineer u c� r- CITY OF SAINT PAUL - DEPARTIEI�T OF PUBLIC WORKS CONTFACT CHANGE AGP,EE2,ENT NO. 2 PROJECT NO. �8� -- Cf:NTFACT NO. CONTRACTOR *al Sy,& r] u4nXI PROJECT DESCRIPTION ate, Eatermacedo &so- Attire y.ter R814of Ba.+wT.i_o- T mud TT In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. Additions and deductions for revision in sise and aligsasat of the 36" R.O. pipe sews from the Rondo Street sewer to Manhole 1b. 5 In Ries Street • Wuctiona flue to ohange in size f5ram 36" to 33" sewer azA a sborter length. Additions due to removing and reeonstruetiag Manhole No. s in !lice Street Not additions — Agreement No. 2 This additional amount to be charged to Bond Find 2109 Code 8&17. etc cart 19C Construction /Engineer Of Engin s MAR 8 1963 Deputy Commissioner - Original (White) Duplicate (Canary) To Contractor To Accounting Div. $14".00 $347.00 ,CO LEY - Hl' t jAXqi1 96/3 ntractor � By G ` 19�� 19 6.3 Comptr e Triplicate (Pink) Quadruplicate (Blue) To Comptroller To Construction Engineer SAINT PACL - DEPkRTN.ENT OF PUBLIC WORKS CI CONTFACT CHANGE AGF.FD/,ENT CT AO. 61•s- __ CCU TFACT NG,_ X.•6xol I NO. 3. CC%N7 .ACT ?R _.:'S2lqj - ir y -WI net on ' /EJECT DESCRIPTION St. Peter -Rondo Ave. Storm Water Relief Sewer, Sao, Y Yjs In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner I of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, I the reasonable costs of those items for additions to,or deductions from,the contract. ADDITIONS: Reinforcing Steel for tunnel lining through cave -in area, Station 30 plus 65 to Station 31 plus 65 3950 pounds Reinforcing Steel for added concrete diaphragm in 5 foot diameter shaft at Rice and Rondo Streets . . . . . . . 1208 pounds Additional reinforcing steel required due to omissions in material lists in Plane . . . . . . . . . . . . . . . . 3590 pounds Total Additional reinforcing steel . . . 8788 lbs. 0 $0.22 This additional amount to be chw god to Bond Fund 210, Code SE -17. 19 63 Con ruction Engineer _4L a _ 4_,�1�19 63 Chi f Engineer .� r M1 PR C0 Mg _ 19 Deputy Ccw:inalcner Original (White) Duplicate (Canary) To Contractor To Accounting Div. FOLEY -HI 'RLEY- WINSTON 19 63. Contractor • -�- 3. � tchell " l9 63 C ptroller Triplicate (Pink) Quadruplicate (Blue) To Comptroller To Construction Engineer CITY OF SAINT PAUL - DEPARTN,ENT OF PUBLIC WOP.KS CONTRACT CHANGE AGREEMENT NO. 4. PROJECT NO.-61-8-4T9 __ CONTRACT NO. L -6307 CONTEaCT',F ­pole y- Hurls y - Winston PROJECT DESCRIPTION St. Peter -Rondo Ave. Storm Hater Relief Bower, See, I do II t In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. Di,- LUC T I ON DUE `ID R 1;LO C AT :I ON A NI) REVISION OF THE DIVERSION TUNNEL IbI Tf. :VICINITY OF THE b0OTH BCIILLING NP-AR Trig; NA IR TUNd., I- OUTLET: Leduc tion Lump sum Lle ConslAuction Engineer_ 31963. i.eio -,,= Ni.neer - u APR ,3 1963 1963. Deputy Commissioner Original (White) Duplicate (Canary) To Contractor To Accounting Div. Fole -hurls - Winston_ 196 , Contractor 6 19 63. Triplicate (Pink) Quadruplicate (Blue) To Comptroller To Construction Engineer CITY OF SAINT PAUL - DEPARTIENT OF PUBLIC WORKS CONTRACT CHANGE AGREEMENT NO. 2_ PROJECT NO. 61 -8 -479 __ CCNTFACT N0. L-6307 CONTRACTOR FOl*Z- Winston -RW16y PROJECT DESCRIPTION ST. PETER -RONDO 3TORL WATER RELIEF SEY&H In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. ADDITIONS The construction of the 33" Sewer across RONDO AVENUE out through the existing 8 foot sewer in Rondo Avenue which is to be abandoned. Concrete block bulkheads were constructed in the existing sewer on either aide of the new sewer oonstructi on to be paid for on the following basis: LABOR �ecbanic operator: 17.0 hors 0 $ 3. 6 7� Lead Miner : 17.0 3• 6 .i8 $ Insuranoe 11.447% .6 HATER IAIS - 4X8z12 oement blocks 12 - sacks of content 2 - cu. yds. of fine sand Total Overhead A Profit 159 Soo. Sec. & Unemployment .18 # 9377.60 " 3.30 6.0 7.4259 of $127.93 Total Addition This additional amount to be charged to Bond Fund 210, Code SE -17. may ;?'/ 19 Cong,t.,uction Engineer may 1963 Chief Engineer M I E MAY 2.`3 1963 19. ComftsINW -W // AA(iGGV - Deputy Commissioner Original (White) Duplicate (Canary) To Contractor To Accounting Div. FOLSY- HURLEr- WINSTON $ W -57 1 9 Z60 3 9: OR _9...S 1 308,231 Byt _ 19 Contract _ o�y- Wat B may 2V 196_ escp iterien City Comptroller may ;1-1--1965 p2rolier Triplicate (Pink) Quadruplicate (Blue) To Comptroller To Construction Engine@;.. CITY OF SAINT PAUL - DEPARTMEI4'T OF PUBLIC WORKS CONTRACT CHANGE AGREEMENT NO. 6. PROJECT NO. 61 -8!-1 9 — CON7FACT NO. L -6307 ^ CC'NTRACTOR F01eZ•Hur1e7•W1nst oa PROJECT DESCRIPTION St. Teter -Rondo Storm Water Relief sewer, Sections I do II: In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. ADDITIONSt Furnish and place 96" reinforced concrete sewer pipe to extend the new sewer to the existing stub, as this and of the existing sewer was not at the place indicated in the plans t 16.0 lin. ft. of 96" R.C.P Sewer (Lump Sum) 1,780.00 Additions and changes in accordance with revised plans, sheets 4 , 5 , and 7: 1 - Special Manhole 1,502.00 Cast Iron Weir guides 7<j.00 Addition to 2" stainless steel probe line 215510 Addition platform in knife gate manhole do changes in platform in manhole over 36" well casing shaft 653.00 Substitution of heavy duty Manhole Cover assemblies for lighter weight assemblies originally specified t 8 foot manhole over knife gate valve } foot nanhole over 36" shaft ) 70.00 foot Drop Shaft ) Changes and additions in access shaft at Rice St. and Rondo Ave. in accordance with revised plans, sheets 16 to 19, inclusive Lump Sum 20944-50 Additional oast -iron pipe due to change in location of College Ave. Shaft: 22.5 lin. ft. of 12" double mechanical joint east - iron pipe . . . . . . . . . . . . . . . . . 60 C)0 TOTAL ALDITIOWS N,B. This additional amount to be charged to r Bond Fund 210, Code BE -1 //, 19,� FO:.}sY•W iSTON•HURLI:;Y ►3 t_19 _ Co ruction Engineer Contractor 19 f By May Z GE E INDQUI Ch, A7 0 °NC' IN rA ►y , 19 63 kay27 19 63 Comm _ 4omptroller' Co:c��i:•siar,ci• Original (White) Duplicate (Canary) riplicate (Pink) Quadruplicate (Blue), ction Engi To Contractor To Accounting Div. To Comptroller To Construrieer�;." . y/ y �J DUPLICATE TO PRINTER • ;" -L CITY OF ST. PAUL COUNCIL NO. OFFICE OF THE CITY CLERK FILE COUNCIL RESOLUTION — GENERAL FORM PRESENTED BY COMMISSIONER DATF WHERSAS, Additions and Deductions which might prove to be necessary in the Improvement described as tha ST* PETER STREET- �.. RONDO AVEM STORM WATER RELIEP SSWR, SECTIONS I and II, and RONDO AVZM AND RICE STREET UNITARY DIVERSION SEWER$, Comp- trollerts Contract L -6307, Voley- Winston - Hurley, Contractors, have been provided for in the specifications, and SAS, it has been found nesessar-y to make the Additions and Deductions of the quantities and in the amounts more partioularly set forth in the Change Orders numbering One (1) through Six (6) attached hereto and made a part hereof to -wits r Change Order No. 1 • • • 2,9 5.15 °1 Change Order N'o . 2 • • • 3.7.00 Change Change Order Order No. • . • No. Deduction 1, • 66} Change Order No. 3 •83 r Change Order Ito • � . ' 0 TOTAL NET ADDITIOM WHRREAS, the total net Addition is 12,649.84$ now theref .. 144 be it RESOLVED, that the City of St. Paul through it's City Coin � approves the foregoing Addition made in acoordance with specifications in the amount of $ 120,649.84., said a un.ts be added to ,the lump suss consideration nomad in the can ]mown as Comptrollerls Contraot L -6307, and which amouht` to be financed from Bond Fund 2103, Code 5E -17• The Commissioner of Public Works hers eed with ,y ` above named contractors that the sum of $ 12, 6k9.84 is the �. correct mount to be added to the above contract. COUNCILMEN Adopted by the Council JUL 3 0 196.' ' Yeas Nays —D- ---� Holland Loss Peterson Rosen Mr. President, Vavoulis 10164 6-64 5 Approved Tn Favor Mayor u— against .f CITY OF SAINT PALL - DEPARMt T OF PiiBLIC WORKS 214128 CCNTRACT CHANGE AGRF&VZNT N0. �7 i FHCJECT NO. 61A6M C.C.N FACT 1110. L-63E7 _ -- GX]_P tCT�. _F PROJECT DESCRIPTION St. Feter=Rnndo sire= ate*_± Water E_•t imf Qarrert am- T & IT In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed•in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. Substitution of c onerete bao1d111 around -the pro -oast shaft section between elevation 49.25 to elevation 103./+ at the Rice4ftndn access and drop shafts in place of the compacted earth or sand fill origiadllp specified In order to provide stability and a Mater seal for the shafts. Class B Concrete 200 Cu. Ids. * $15.50 hlititation of cement grout baekfill around the pre -cast shaft at College Avesne is plaos of the compacted earth or sand fill oriiinalt specified. Cement grout 33.85 N. Ida. 4 $15.00 pedtitctim institution of 20 of stabilised gravel And a bituminous prima coat for a portion of the 2" bitua9noue surfaosd area at the portal. Lmp sun deduction Not addition - this change agreement This additional amount to be charged to Bond Arad 210, Code 31-17. !c c r rr i 19—.2 Cons ruction Engineer C f i e I O E FED t�;? C p?njt,y Commissioner Original (White) Duplicate (Canary) To Contractor To Accounting Div. $3100.00 a 507.75 632.60 .�—�.. ew 52955.15 �k FOLEY - HURLEY - WINSiu,. •- (A JOINT MOM-) �. � � G 19Z _3_ Contract i g v� 1943,j� o tro er ' • Triplicate (Pink) QtrAdruplicate 0$lue) x To Comptroller -'TO Construction Engine It', d CITY OF SADIT PAUL - DEPARTME %T OF PUBLIC, WORKS CONTRACT CFANGE AGRE R E ?'T NO. PF.-JECT NO. 4i1 -S••.4 9— -- CC?�iuA; PROJECT DESCRIPTION St. P-ter ftzido A -qtL1= Wstg Rel44f SAW=_ In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner , of Public Works has agreed with the Contractor that the basis of pay -rent and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. + Additions and deductions for revision in size and aligment of the 36* R.O. pipe Sw sewer frail the Rondo Street sever to Manhole Flo. 5 In Rice Street. t Deductions due to nbnnge in size from 36" to 33" oe+rer and a $1097.00 shorter length. Additions due to removing and reconstructing Manhole No. 5 in Rioe Street $x.4.00 Net additions - Agreement No. 2 $347.00 This additiaoal amount to be ebarged to Bond Fund 210, We SX-17. t Y i v Z'7 t C 19 Construction Engineer En S 1 _ MAR 8 1963 Depu';y CoTMir „toner Original (White) Duplicate (Canary) To Contractor To Accounting Div. S � 4 +y. 1 ..�1• ,COLEY- 3:',;-.. to J;wl, ,.,wiltO Contractor By Comptr� Triplicate (Pink) Quadruplicate•(Blue) 4 a To Comptroller To Construction Engineer' `` ` CITY OF SAINT PALL - DEPARTI�ENT OF PUBLIC WORKS CONTRACT CHANGE AGREEMENT NO. 1 4P_ PROJECT N0. 61-s -472 CONTRACT NO. CONTRACTOR Fgjjtjai1niP1eXtjjigS,q PROJECT DESCRIPTION_ St. Peter -Ronde Ave. Storm Water Relief Sewer, S20- _j & III In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. ADDITIONSt Reinforcing Steel for tunnel lining through cave -in area, station 30 plus 65 to Station 31 plus 65 . . . . . . . . . 3990 pounds Reinforcing Steel for added concrete diaphragm in 5 toot diameter shaft at Rice and Rondo Streets 1208 pounds Additional reinforcing steel required due to omissions in material lists in Plane 3590 pounds Total Additional reinforcing steel . . . 8788 lbs. •! $0.22 This additional amount to be chw god to Bond Fund 210, Code SR -17. 13 �_ s t�— .3 1963 Con ruction Engineer • _ �/� 963 Ch f Engineer U :> : ry APR s 1963 19 Co Deputy Commissioner Original (White) Duplicate (Canary) To Contractor To Accounting Div. FOLSY- HURLEY- WINSTON 19 63. Contractor lrce ,I- J. tchell -- u:'ar y 19 63 C ptroller- .�• -� •• Triplicate (Pink) Quadruplicate (Blue) To Comptroller To Construction Engineer,, r CITY OF SAINT PALL - DEPATNENT OF PUBLIC WORKS CONTRACT CHANGE AGREE1,1EidT N0, 4_ PROJECT N0, 61 -s -479 CONTRACT N0, L-6307 ry* - C _.., :•�ITRACTOR-Foley- Hurley-NinetOa PROJECT DESCRIPTION St. Peter -Rondo Ave. Storm Water Relief Sewer* Sea, I A IIt In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract, L't:L'UCTION LLIE 9D RELOCATION ANL' NEV'[SION OF `1'i3E DIVERSION TUN.Nh:L IN THE; VICINITY OF T&v, BOOTH BUILL:ING N=.Ati ME AI14 TUN;3LI. OUTLLT: Le duc ti on . . . . . . . . . . . Lump suin L+-22 1963. Cons�Auction Engineer_ 5 31963• rsq-,Lngl.neer .; ; APR 3 1963 1963 • Deputy Commissioner Original (White) Duplicate (Canary) To Contractor To Accounting Div. Fole -Hurls - Winston la Contractor Triplicate (Pink) Quadruplicate (Blue) To Comptroller To Construction Engineer n t t; •r •'J; J ` CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE AGREEMENT NO. 5_ PROJECT NO. 61 -8n79 ___ CONTRACT N0. L-63o7 CONTRACTOR FOle7- fiMt*ll•Rur10y PROJECT DESCRIPTION ST. P -ETER-RONDO STOR.,. WATER R)iLIEF STsY&R In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. ADDITIONS The oonstruation of the 33" Sewer across RONDO AVENUE out throuh the existing 8 foot newer in Rondo Avenue which is to be abandoned. Concrete block bulkheads were constructed in the existing sewer on either side of the new sewer construction to be paid for on tbo following basis: LABOR '" acbanic Operator t 17.0 hours 0 $ 3.75 $ 6 .'j� Lead Miner : 17.0 " " 3 'j�jg 6 ld Insurance 11,447% ' 6 NATBRIAIS 520�= 4XBX12 cement blocks 12 - sacks of cement 2 - cu. yds. of fine sand Total Overhead A Profit 159 Soo. Sea. be Unemployment " t 1:4.6 i3.6Z 3.30 1. o 7.425% of ja27.93 Total Addition # W.57 117.72 39.0 k t 1 This additional amount to be charged to Bond Fund 210, Code SF -17. _ i9 3 Cons ction Engineer -ze !� • May 1963 Chie Engineer M I T i E /IAY 1963 Comte 19 Deputy Commissioner Original (White) Duplicate (Canary) To Contractor To Accounting Div. FOLEr- HUBlEY- WI N,;TON 1 liTi 19 , V Contract - "ornoy- r' By May 19 :r City Camptroll-er 4-. Z1 19Y ,,I 7UrUP iptrolier ., „r" Triplicate (Pink) Quadruplicate (Blue) Ufa, To Comptroller Tp Construction Engineer v' CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE AGREEMENT NO. 6. PROJECT NO. 61n+ - CONTRACT NO. L -6307 _ CONTRACTOR FOln-Hurler -W1nst et PROJECT DESCRIPTION St. Peter -Rondo Storm Water Relief Sever, Sections I A III In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. ADDITIONSt Furnish and place 960 reinforced conarete'sewer pips to extend the new newer to the existing stub, as the end of the existing sewer was not at the place indisated In the plans# 16.0 1311. ft. of 960 R.C.P Sower (Lump Sum) 1,780.00 Addition* and changes in accordance with PY Y revised plans, aheets 4 , 5 , and 7: 1 • Special Manhole . . . . 1,503.00 Cast Iron Weir guides . 0 0 6 Addition to 2" stainless steel probe line .� 2 Addition platform in knife gate manhole & changes �0O in platform in manhole over 360 well easing shaft 653.00 Substitution of heavy duty ykanholo Cover assemblies for lighter weight assemblies originally ape o ified s 8 foot manhole over knife gate valve } 5 foot manhole over 36" shaft 70.00. 8 toot Drop Shaft ; Changes and additions in acesss shaft at Rise St. and Rondo Ave. in ao cordanse with revised plans, sheets 16 to 19, inclusive + Lump Sun - - - -- ----- -• - - -- 2i 944.50 Additional oast -iron pipe due to ehange in location of College Ave. Shafts 22.5 lin. ft. of 12" double mechanical joint cast - iron pipe 46o.00 ` Mai TOTAL ADDITIONS a 7. 71&0Q N.B. This additions -' Bond Fund 210, a 19 6 Co ruction Engineer�- VAX___,1963 19 63 Comm epu y Commissioner 1 amount to be charged to Code SE -17. FOI.TY•WINETON -MMLEY 77-C BY ��, 19__ G, oRNCY ND'AUI Xa?27 19 63 omptroller Original (White) Duplicate (Canary) iplicate (Pink) Quadruplicate (Blue) To Contractor To Accounting Div. To Comptroller ,, To Construction _l�agAn t°' f.J