214128PUBLISHED 3- 3
ORIGINAL TO CITY CLERK 214128 CITY OF ST. PAUL FILENCIL NO.
OFFICE OF THE CITY CLERK
UNCIL RESOLUTION — GENERAL FORM `1 File No. 214128 - By Milton ,
° ireas, Additions and Deductions
PRESENTED BY might prove to be necessary in
COMMISSIONS DATE ,TImprovement described as the ST.
TER STREET -RONDO AVENUE
4 JRtgf ?WATER RELIEF SEWER;
ea RONDn
'rte -TI. ^" q'4'
WHEREAS, Additions and Deductions which +might prove to
necessary in the Improvement described as the ST. PETER STREET -
RONDO AVENUE STORM WATER RELIEF SEWER, SECTIONS I and II, and
RONDO AVENUE AND RICE STREET SANITARY DIVERSION SEWERS, Comp-
troller's Contract L -6307, Foley- Winston - Hurley, Contractors,
have been provided for in the specifications, and
WHEREAS, it has been found necessary to make the Additions and
Deductions of the quantities and in the amounts more particularly
set forth in the Change Orders numbering One (1) through Six (6 )
attached hereto and made a part hereof to -wit:
Change Order No. 1
Change Order.No. 2
Charge Order No.
Change Order No. Deduction
Change Order No- 5
Change Order No. 6
TOTAL NET ADDITIONS
2, 95.15
3 7.00
139 .3 6
( 6 .00)
30 .83
7,749.50
9 12, 64,9.8 , and
WHEREAS, the- total net Addition is $ 12,649.84, now therefore,
be 'it
RESOLVED, that the City of St. Paul through it *s City Council
approves the foregoing Addition made in accordance with the
specifications in the amount of $ 125649-84, said amount to
be added to the lump sum consideration named in the contract,
known as Comptroller's Contract L -6307, and which amouht is
to be financed from Bond Fund 210, Code SE -17.
The Commissioner of Public Works has agreed with the
above named contractors that the sum of $ 12,649.84 is the
correct amount to be added to the above contract.
JUL 3 0 1963
COUNCILMEN Adopted by the Council 19—
Yeas Nays
T,..IaI;,.► JUL 3 0 1963
Holland ��- pproved 19—
Loss In Favor '
Peterson
� v Mayor '
Against
Rosen
Mr. President, ,Vavoulis
font &62 �
CITY OF SAINT PAUL - DtPARTMU OF PUBLIC WORKS 21411
CONTRACT CHANGE AGREEMENT NO. 1
PROJECT NO. bt+d•.,M _ CONTRACT NO. CO CTOR
PROJECT DESCRIPTION St. Peter4nMa An. g *"M Water Val saf 9aw+� Ass I A IT
In accordance with Section 95 of the Charter of the City of Saint Paul,•the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
iabstitution of ooaerete baakfill arotimd the pre -east shaft seetioa between
elevation 49.25 to elevation 103.4 at the Rice- Roode soosss and drop
shafts in place of the compacted earth or sand fill origiaallT speeifisd
In order to yrovide stability and a rater seal for the shafts.
Glass s Conorete 200 0a. Ids. 6 $15.50 $3100.00
SYbstitation of cement pout backfill around the pre -cast shaft at 0011090
1v0 in pla00 of the eompaeted earth or sand fill originally
ar0 IMA. emont grout 33.85 Cu. Ids.' 4 $15.00 507.76
Substitution of 2" of stabilised gravel and a bituminous prize coat for a
portion of the 28 bituminous ourfaoed area at the portal.
Limp sm deduction 02.60
Net addition - this change agreement $2"5.11
This additional amount to be charged to Hoed Find 210, Code 33-17.
Cons ruction Engineer
,Z 1 9 G3
FOLEY- HURLED'- Wh,6iu,
(A PINT %E111URF) -- .Z 'ZG 19,43_
Contract
l
B Z/ 194
3 G 19 63
J12nu ±y Commissioner '
Original (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller To Construction Engineer
u
c�
r-
CITY OF SAINT PAUL - DEPARTIEI�T OF PUBLIC WORKS
CONTFACT CHANGE AGP,EE2,ENT
NO. 2
PROJECT NO. �8� -- Cf:NTFACT NO. CONTRACTOR *al Sy,& r] u4nXI
PROJECT DESCRIPTION ate, Eatermacedo &so- Attire y.ter R814of Ba.+wT.i_o- T mud TT
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
Additions and deductions for revision in sise and aligsasat of the 36" R.O. pipe
sews from the Rondo Street sewer to Manhole 1b. 5 In Ries Street •
Wuctiona flue to ohange in size f5ram 36" to 33" sewer azA a
sborter length.
Additions due to removing and reeonstruetiag Manhole No. s
in !lice Street
Not additions — Agreement No. 2
This additional amount to be charged to Bond Find 2109 Code 8&17.
etc cart 19C
Construction /Engineer
Of Engin
s MAR 8 1963
Deputy Commissioner
-
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
$14".00
$347.00
,CO LEY - Hl' t
jAXqi1 96/3
ntractor �
By G ` 19��
19 6.3
Comptr e
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller To Construction Engineer
SAINT PACL - DEPkRTN.ENT OF PUBLIC WORKS
CI
CONTFACT CHANGE AGF.FD/,ENT
CT AO. 61•s- __ CCU TFACT NG,_ X.•6xol
I
NO. 3.
CC%N7 .ACT ?R _.:'S2lqj - ir y -WI net on
' /EJECT DESCRIPTION St. Peter -Rondo Ave. Storm Water Relief Sewer, Sao, Y Yjs
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
I of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
I
the reasonable costs of those items for additions to,or deductions from,the contract.
ADDITIONS:
Reinforcing Steel for tunnel lining
through cave -in area, Station 30 plus 65
to Station 31 plus 65 3950 pounds
Reinforcing Steel for added concrete
diaphragm in 5 foot diameter shaft
at Rice and Rondo Streets . . . . . . . 1208 pounds
Additional reinforcing steel required
due to omissions in material lists in
Plane . . . . . . . . . . . . . . . . 3590 pounds
Total Additional reinforcing steel . . . 8788 lbs. 0 $0.22
This additional amount to be chw god to Bond Fund 210,
Code SE -17.
19 63
Con ruction Engineer
_4L a _ 4_,�1�19 63
Chi f Engineer
.� r M1 PR
C0 Mg _ 19
Deputy Ccw:inalcner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
FOLEY -HI 'RLEY- WINSTON 19 63.
Contractor
• -�- 3. � tchell "
l9 63
C ptroller
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller To Construction Engineer
CITY OF SAINT PAUL - DEPARTN,ENT OF PUBLIC WOP.KS
CONTRACT CHANGE AGREEMENT
NO. 4.
PROJECT NO.-61-8-4T9 __ CONTRACT NO. L -6307 CONTEaCT',F pole y- Hurls y - Winston
PROJECT DESCRIPTION St. Peter -Rondo Ave. Storm Hater Relief Bower, See, I do II t
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
Di,- LUC T I ON DUE `ID R 1;LO C AT :I ON A NI) REVISION OF THE
DIVERSION TUNNEL IbI Tf. :VICINITY OF THE b0OTH
BCIILLING NP-AR Trig; NA IR TUNd., I- OUTLET:
Leduc tion Lump sum
Lle
ConslAuction Engineer_
31963.
i.eio -,,= Ni.neer -
u APR ,3 1963
1963.
Deputy Commissioner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
Fole -hurls - Winston_ 196 ,
Contractor
6
19 63.
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller To Construction Engineer
CITY OF SAINT PAUL - DEPARTIENT OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT
NO. 2_
PROJECT NO. 61 -8 -479 __ CCNTFACT N0. L-6307 CONTRACTOR FOl*Z- Winston -RW16y
PROJECT DESCRIPTION ST. PETER -RONDO 3TORL WATER RELIEF SEY&H
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
ADDITIONS
The construction of the 33" Sewer across RONDO AVENUE out
through the existing 8 foot sewer in Rondo Avenue which is to be
abandoned. Concrete block bulkheads were constructed in the
existing sewer on either aide of the new sewer oonstructi on to
be paid for on the following basis:
LABOR
�ecbanic operator: 17.0 hors 0 $ 3. 6 7�
Lead Miner : 17.0 3• 6 .i8
$
Insuranoe 11.447% .6
HATER IAIS
- 4X8z12 oement blocks
12 - sacks of content
2 - cu. yds. of fine sand
Total
Overhead A Profit 159
Soo. Sec. & Unemployment
.18 # 9377.60
" 3.30 6.0
7.4259 of $127.93
Total Addition
This additional amount to be charged to
Bond Fund 210, Code SE -17.
may ;?'/ 19
Cong,t.,uction Engineer
may 1963
Chief Engineer
M I E MAY 2.`3 1963
19.
ComftsINW -W // AA(iGGV -
Deputy Commissioner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
FOLSY- HURLEr- WINSTON
$ W -57
1
9 Z60
3 9: OR
_9...S
1 308,231
Byt _ 19
Contract _ o�y- Wat
B may 2V 196_
escp
iterien
City Comptroller
may ;1-1--1965
p2rolier
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller To Construction Engine@;..
CITY OF SAINT PAUL - DEPARTMEI4'T OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT
NO. 6.
PROJECT NO. 61 -8!-1 9 — CON7FACT NO. L -6307 ^ CC'NTRACTOR F01eZ•Hur1e7•W1nst oa
PROJECT DESCRIPTION St. Teter -Rondo Storm Water Relief sewer, Sections I do II:
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
ADDITIONSt Furnish and place 96" reinforced concrete sewer pipe
to extend the new sewer to the existing stub, as this
and of the existing sewer was not at the place indicated
in the plans t
16.0 lin. ft. of 96" R.C.P Sewer (Lump Sum) 1,780.00
Additions and changes
in
accordance with
revised plans, sheets
4 ,
5 , and 7:
1 - Special Manhole
1,502.00
Cast Iron Weir guides
7<j.00
Addition to 2" stainless steel probe line
215510
Addition platform in knife gate
manhole do changes
in platform in manhole over
36"
well casing shaft
653.00
Substitution of heavy duty Manhole Cover
assemblies for lighter weight assemblies
originally specified t
8 foot manhole over knife gate valve }
foot nanhole over 36" shaft ) 70.00
foot Drop Shaft )
Changes and additions in access shaft at
Rice St. and Rondo Ave. in accordance with
revised plans, sheets 16 to 19, inclusive
Lump Sum 20944-50
Additional oast -iron pipe due to change in
location of College Ave. Shaft:
22.5 lin. ft. of 12" double mechanical joint east -
iron pipe . . . . . . . . . . . . . . . . . 60 C)0
TOTAL ALDITIOWS
N,B. This additional amount to be charged to
r Bond Fund 210, Code BE -1
//, 19,� FO:.}sY•W iSTON•HURLI:;Y ►3 t_19 _
Co ruction Engineer Contractor
19 f By May
Z GE E INDQUI
Ch, A7 0 °NC' IN rA
►y , 19 63 kay27 19 63
Comm _ 4omptroller'
Co:c��i:•siar,ci•
Original (White) Duplicate (Canary) riplicate (Pink) Quadruplicate (Blue),
ction Engi
To Contractor To Accounting Div. To Comptroller To Construrieer�;."
. y/ y �J
DUPLICATE TO PRINTER
• ;" -L
CITY OF ST. PAUL COUNCIL NO.
OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER
DATF
WHERSAS, Additions and Deductions which might prove to be
necessary in the Improvement described as tha ST* PETER STREET- �..
RONDO AVEM STORM WATER RELIEP SSWR, SECTIONS I and II, and
RONDO AVZM AND RICE STREET UNITARY DIVERSION SEWER$, Comp-
trollerts Contract L -6307, Voley- Winston - Hurley, Contractors,
have been provided for in the specifications, and
SAS, it has been found nesessar-y to make the Additions and
Deductions of the quantities and in the amounts more partioularly
set forth in the Change Orders numbering One (1) through Six (6)
attached hereto and made a part hereof to -wits r
Change
Order
No. 1 • • •
2,9 5.15
°1
Change
Order
N'o . 2 • • •
3.7.00
Change
Change
Order
Order
No. • . •
No. Deduction
1, • 66}
Change
Order
No.
3 •83
r
Change
Order
Ito • �
. ' 0
TOTAL NET ADDITIOM
WHRREAS, the total net Addition is 12,649.84$ now theref .. 144
be it
RESOLVED, that the City of St. Paul through it's City Coin �
approves the foregoing Addition made in acoordance with
specifications in the amount of $ 120,649.84., said a un.ts
be added to ,the lump suss consideration nomad in the can
]mown as Comptrollerls Contraot L -6307, and which amouht`
to be financed from Bond Fund 2103, Code 5E -17•
The Commissioner of Public Works hers eed with ,y `
above named contractors that the sum of $ 12, 6k9.84 is the �.
correct mount to be added to the above contract.
COUNCILMEN Adopted by the Council
JUL 3 0 196.' '
Yeas Nays
—D- ---�
Holland
Loss
Peterson
Rosen
Mr. President, Vavoulis
10164 6-64
5 Approved
Tn Favor
Mayor
u— against
.f
CITY OF SAINT PALL - DEPARMt T OF PiiBLIC WORKS 214128
CCNTRACT CHANGE AGRF&VZNT N0. �7 i
FHCJECT NO. 61A6M C.C.N FACT 1110. L-63E7 _ -- GX]_P tCT�. _F
PROJECT DESCRIPTION St. Feter=Rnndo sire= ate*_± Water E_•t imf Qarrert am- T & IT
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed•in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
Substitution of c onerete bao1d111 around -the pro -oast shaft section between
elevation 49.25 to elevation 103./+ at the Rice4ftndn access and drop
shafts in place of the compacted earth or sand fill origiadllp specified
In order to provide stability and a Mater seal for the shafts.
Class B Concrete 200 Cu. Ids. * $15.50
hlititation of cement grout baekfill around the pre -cast shaft at College
Avesne is plaos of the compacted earth or sand fill oriiinalt
specified. Cement grout 33.85 N. Ida. 4 $15.00
pedtitctim
institution of 20 of stabilised gravel And a bituminous prima coat for a
portion of the 2" bitua9noue surfaosd area at the portal.
Lmp sun deduction
Not addition - this change agreement
This additional amount to be charged to Bond Arad 210, Code 31-17.
!c c r rr i 19—.2
Cons ruction Engineer
C f i e
I O E FED t�;?
C
p?njt,y Commissioner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
$3100.00
a
507.75
632.60
.�—�.. ew
52955.15
�k
FOLEY - HURLEY - WINSiu,. •-
(A JOINT MOM-) �. � � G 19Z _3_
Contract i
g v� 1943,j�
o tro er ' •
Triplicate (Pink) QtrAdruplicate 0$lue) x
To Comptroller -'TO Construction Engine It',
d
CITY OF SADIT PAUL - DEPARTME %T OF PUBLIC, WORKS
CONTRACT CFANGE AGRE R E ?'T NO.
PF.-JECT NO. 4i1 -S••.4 9— -- CC?�iuA;
PROJECT DESCRIPTION St. P-ter ftzido A -qtL1= Wstg Rel44f SAW=_
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner ,
of Public Works has agreed with the Contractor that the basis of pay -rent and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract. +
Additions and deductions for revision in size and aligment of the 36* R.O. pipe Sw
sewer frail the Rondo Street sever to Manhole Flo. 5 In Rice Street.
t
Deductions due to nbnnge in size from 36" to 33" oe+rer and a $1097.00
shorter length.
Additions due to removing and reconstructing Manhole No. 5
in Rioe Street $x.4.00
Net additions - Agreement No. 2 $347.00
This additiaoal amount to be ebarged to Bond Fund 210, We SX-17. t
Y i
v Z'7 t C 19
Construction Engineer
En
S
1 _
MAR 8 1963
Depu';y CoTMir „toner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
S �
4
+y.
1
..�1•
,COLEY- 3:',;-..
to J;wl, ,.,wiltO
Contractor
By
Comptr�
Triplicate (Pink) Quadruplicate•(Blue) 4
a
To Comptroller To Construction Engineer' `` `
CITY OF SAINT PALL - DEPARTI�ENT OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT
NO. 1 4P_
PROJECT N0. 61-s -472 CONTRACT NO. CONTRACTOR Fgjjtjai1niP1eXtjjigS,q
PROJECT DESCRIPTION_ St. Peter -Ronde Ave. Storm Water Relief Sewer, S20- _j & III
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
ADDITIONSt
Reinforcing Steel for tunnel lining
through cave -in area, station 30 plus 65
to Station 31 plus 65 . . . . . . . . . 3990 pounds
Reinforcing Steel for added concrete
diaphragm in 5 toot diameter shaft
at Rice and Rondo Streets
1208 pounds
Additional reinforcing steel required
due to omissions in material lists in
Plane 3590 pounds
Total Additional reinforcing steel . . . 8788 lbs. •! $0.22
This additional amount to be chw god to Bond Fund 210,
Code SR -17.
13
�_ s t�— .3 1963
Con ruction Engineer
• _ �/� 963
Ch f Engineer
U :> : ry APR s 1963
19
Co
Deputy Commissioner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
FOLSY- HURLEY- WINSTON 19 63.
Contractor
lrce ,I- J. tchell
-- u:'ar y
19 63
C ptroller- .�• -� ••
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller To Construction Engineer,,
r
CITY OF SAINT PALL - DEPATNENT OF PUBLIC WORKS
CONTRACT CHANGE AGREE1,1EidT N0, 4_
PROJECT N0, 61 -s -479 CONTRACT N0, L-6307 ry*
- C
_.., :•�ITRACTOR-Foley- Hurley-NinetOa
PROJECT DESCRIPTION St. Peter -Rondo Ave. Storm Water Relief Sewer* Sea, I A IIt
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract,
L't:L'UCTION LLIE 9D RELOCATION ANL' NEV'[SION OF `1'i3E
DIVERSION TUN.Nh:L IN THE; VICINITY OF T&v, BOOTH
BUILL:ING N=.Ati ME AI14 TUN;3LI. OUTLLT:
Le duc ti on . . . . . . . . . . . Lump suin L+-22
1963.
Cons�Auction Engineer_
5 31963•
rsq-,Lngl.neer
.; ; APR 3 1963
1963 •
Deputy Commissioner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
Fole -Hurls - Winston la
Contractor
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller To Construction Engineer
n
t
t;
•r
•'J;
J `
CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT
NO. 5_
PROJECT NO. 61 -8n79 ___ CONTRACT N0. L-63o7 CONTRACTOR FOle7- fiMt*ll•Rur10y
PROJECT DESCRIPTION ST. P -ETER-RONDO STOR.,. WATER R)iLIEF STsY&R
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
ADDITIONS
The oonstruation of the 33" Sewer across RONDO AVENUE out
throuh the existing 8 foot newer in Rondo Avenue which is to be
abandoned. Concrete block bulkheads were constructed in the
existing sewer on either side of the new sewer construction to
be paid for on tbo following basis:
LABOR
'" acbanic Operator t 17.0 hours 0 $ 3.75 $ 6 .'j�
Lead Miner : 17.0 " " 3 'j�jg 6 ld
Insurance 11,447% ' 6
NATBRIAIS
520�= 4XBX12 cement blocks
12 - sacks of cement
2 - cu. yds. of fine sand
Total
Overhead A Profit 159
Soo. Sea. be Unemployment
" t 1:4.6 i3.6Z
3.30 1. o
7.425% of ja27.93
Total Addition
# W.57
117.72
39.0
k
t
1
This additional amount to be charged to
Bond Fund 210, Code SF -17.
_ i9 3
Cons ction Engineer
-ze !� • May 1963
Chie Engineer
M I T i E /IAY 1963
Comte 19
Deputy Commissioner
Original (White) Duplicate (Canary)
To Contractor To Accounting Div.
FOLEr- HUBlEY- WI N,;TON 1
liTi 19 ,
V
Contract - "ornoy- r'
By May 19
:r
City Camptroll-er 4-.
Z1 19Y
,,I 7UrUP iptrolier ., „r"
Triplicate (Pink) Quadruplicate (Blue) Ufa,
To Comptroller Tp Construction Engineer v'
CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT
NO. 6.
PROJECT NO. 61n+ - CONTRACT NO. L -6307 _ CONTRACTOR FOln-Hurler -W1nst et
PROJECT DESCRIPTION St. Peter -Rondo Storm Water Relief Sever, Sections I A III
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
ADDITIONSt Furnish and place 960 reinforced conarete'sewer pips
to extend the new newer to the existing stub,
as the
end of the existing sewer was not at the place
indisated
In the plans#
16.0 1311. ft. of 960 R.C.P Sower (Lump Sum)
1,780.00
Addition* and changes in accordance with
PY Y
revised plans, aheets 4 , 5 , and 7:
1 • Special Manhole . . . .
1,503.00
Cast Iron Weir guides . 0 0 6
Addition to 2" stainless steel probe line
.�
2
Addition platform in knife gate manhole & changes
�0O
in platform in manhole over 360 well easing shaft
653.00
Substitution of heavy duty ykanholo Cover
assemblies for lighter weight assemblies
originally ape o ified s
8 foot manhole over knife gate valve }
5 foot manhole over 36" shaft
70.00.
8 toot Drop Shaft ;
Changes and additions in acesss shaft at
Rise St. and Rondo Ave. in ao cordanse with
revised plans, sheets 16 to 19, inclusive
+
Lump Sun - - - -- ----- -• - - --
2i 944.50
Additional oast -iron pipe due to ehange in
location of College Ave. Shafts
22.5 lin. ft. of 12" double mechanical joint cast -
iron pipe
46o.00 `
Mai
TOTAL ADDITIONS a 7. 71&0Q
N.B. This additions
-' Bond Fund 210,
a 19 6
Co ruction Engineer�-
VAX___,1963
19 63
Comm
epu y Commissioner
1 amount to be charged to
Code SE -17.
FOI.TY•WINETON -MMLEY
77-C
BY ��, 19__
G, oRNCY ND'AUI
Xa?27 19 63
omptroller
Original (White) Duplicate (Canary) iplicate (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller ,, To Construction _l�agAn t°'
f.J