WHEREAS, subsequent to the final payment to the F. Morettini
Company, contractor, for the construction of the AFTON
HEIGHTS ADDITION SEWER SYSTEM, Contract 61 -5 -884, Comptroller's
Contract L -6382, a leak became apparent in the intersection
of Eastview Avenue and MorniJhgside Drive, and
WHEREAS, the said contractor excavated•at the location of
the leak and discovered that the force main for the sewer
had cracked as a result of the construction of a water main
under t1,B force main at this point, and
WHEREAS, the contractor in repairing the force main and backfilling
the area opened in the intersection, incurred expense through
no fault of his own, therefore, be it
RESOLVED, that
in the amount
Afton Heights
L -6382.
4P
COUNCILMEN
Yeas Nays
Dalglish
" Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
IOM 6-62
tYie F. Morettini Company, contractor, be reimbursed
of $ 243.44, which sum is to be charged to the
Addition Sewer System, Comptroller's Contract
Council File No. 211951 —By Milton
Rosen —
Whereas, Subsequent - to the final
payment to the F. Morettini Company,
contractor, for the construction of the
AFTON HEIGHTS ADDITION SEWER
SYSTEM, Contract 61 -S -884, Comp-
troller's Contract L -6382, a leak became
apparent in the intersection of East -
view Avenue and Morningside Drive,
and
Whereas, The said contractor ex-
cavated at the location of the leak
and discovered that the force main for
the sewer had cracked as a result of
the construction of a water main under
the force main at this point, and
Whereas, The contractor in repair-
ing the force main and backfilling the
area opened in" the intersection, in-
curred expense through no fault of�
his own, therefore, be it _ _
r Resolved, That the F. Morettini 1
t Company, contractor, be reimbursed in
the amount of $243.44, 'which sum is
to be charged to the Afton Heights
Addition Sewer System, Comptroller's
Contract L -6382.
Adopted by the Council April 2, 1983.
Approved Apnl 2, 1963.
(April 8, 1963)' .
n Favor
Against
APR 21963
APR 21i
DUPLICATE TO PRINTER
v CITY OF ST. PAUL FILE No. NO � 95_
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
WHEREASy subsequent to the final payment to the F. Morettini
Companys, contractor,$ for the construction of the AFTON
HEIGHTS ADDITION SLAVER SYSTEM, Contraaet 61 -S -881, Comptrollers s
Contract L -63820 a leak became apparent in the inter section
of Eaastview Avenue and Morningaside Drive* and
WHEREAS, the said contractor excavated at the location of
the leak and discovered that the force mein for the sewer
had cracked an a result of the constructi= of a vaater main
under the force rain at this point, and
WHEREAS, the contractor in repairing the force main and baackfilling
the area opened in the intersection, incurred expense through
no fault of his own,. therefore, be it
RESOLVEDj that
in the amount
Afton Heights
L -6382.
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10A1 6-62
the F. Morettini Compaanys contractor, be reimbursed
of 0 243.44j, which sum is to be charged to the
Addition Sewer System$ Comptroller's Contrao t
Adopted by the Council 19—
Approved 19—
In Favor
Mayor
Against