Loading...
212105ORIGINAL — CITY CLERK F_ -I L 1/ u • V • CITY OF SAINT PAUL L;- C � D 01 _ifl1C I L RESOLUTION F,OUNCIL No. 0- N° 28 9 9 - FOR fcil EYIe No. 212105 T— By Milton �AUTHORIZATIO F LOCAL IMPROVEMENT PROJECT'�sen- the matter of grading and surfac- 1 /TY� with bituminous material Ear^ t at�7 ale& ??rive from Upper Aftr PRESENTED BY HON DA'0, .Y "st Sandralee ' Dove In the matter of grading and surfacing with bituminous mat'eriftl -Kast Sandralee Drive from Upper Afton Road to West Sandralee Drive and West Sandralee Drive from Upper Afton Road to East Sandralee Drive, under Pre- liminary Order 210338, approved December 11, 1962, and Final Order 211555, \approved March 12, 1963, and In the matter of constructing a sanitary and storm sewer in Sandralee Drive under Preliminary Order 208846, approved August 30, 1962, and Final Order 211557, approved March 12, 1963. RESOLVED, That the plans and specifications as submitted for the above improvement be and the same are hereby approved and the Commissioner of Public Works be and he is hereby directed to do the fine grading, place the stabilized base and do the bituminous surfacing by City forces at an estimated cost of $10,872.40, and the Purchasing Agent proceed to secure the necessary materials, and be it FURTHER RESOLVED, That the Purchasing Agent be and he is hereby directed to obtain bids for the improvement, the bids to show separately the amount for the grading work (except the work to be done by City forces) and the amount for the sewer work as per plans and specifications, and the total thereof to be considered as bids for the entire improvement, and be it FURTHER RESOLVED, That the cost of the above improvement including engineering and inspection expenses amounting to $1,087.25 or a total of $11,959.65 plus the cost of grading and sewer be assessed against the benefited property. II CONTRACT PRICE - - - - - - - - - - - s 10,872.40 DEPT. CONT. NO. ENGINEER'S ESTIMATE: S - - FORMAL BID NO. WATER CONNECTIONS, DETOURS, SOUNDINGS. ETC. - - - - $ ENGINEERING - - - - - - - - - - - s 1,087.25 INSPECTION 2% - - - - - - r - - - - - 11 TOTAL - - - - - - - - - - - - $ 11,959.65 NOTE: TO BE CERTIFIED AS TO FUNDS AVAILABLE BY COMPTROLLER BEFORE PRESENTING TO COUNCIL FOR ADOPTION. PERMANENT IMPROVEMENT REVOLVING FUND TO BE REIMBURSED FOR COST OF THIS IMPROVEMENT AS FOLLOWS: •� 1. ASSESSED AGAINST BENEFITTED PROPERTY - - - - - - - - - - - - - $ 1 1,959.65 + the 2. APPROPRIATED FROM CITY'S SHARE OF LOCAL IMPROVEMENTS— - - CODE $ Cost of grading 3. APPROPRIATED FROM LOCAL IMPROVEMENTS— EXEMPT PROPERTY— - CODE $ aild sewer. A. 'APPROPRIATED FROM BOND ISSUE —CODE $ S. COUNTY AID - - - - - - - - - - - - - - - - - - - $ S. MUNICIPAL STATE AID PROJECT NO. 7. TOTAL - - - - - - - - - - - ; COPIES TO: 1 HEREBY CERTIFY THAT THERE IS AN UNENCUMBERED BAL- CITY CLERK ANCE AVAILABLE IN THE ABOVE STATED APPROPRIATIONS TO LOCAL IMPROVEMENT NO COMPTROLLER REIMBURSE THE PERMANENT IMPROVEMENT REVOLVING FUND PUBLIC WORKS IN THE ABOVE AMOUNTS. " PURCHASING DATE FINAL ORDER ADOPTED � COMPTROLLER' BY COUNCILMEN YEAS MR. PRESIDENT 500 5-61 a®o® NAYS ADOPTED BY THE COUNCII APR 10 1963 IN FAVOR � APR 10 1963 APPROVED AGAINST - MAYOR