211169CITY OF ST. PAUL PUBLISHED -.- / b "
Resolution Ratifying Assessment
In the matter of the assessment of benefits, cost and expenses
for
grading and surfacing with bituminous material the alley in Block 28, Anna E. Ramsey's
Addition, Enlargement of, from Griggs St. to Ashland Ave., also constructing a storm
sewer in the alley from a point 207.6 ft. southeast of Ashland Ave. to the existing
sewer in Ashland Ave.
under Preliminary Order ....... 19$63_Z....... Intermediary Order ..... n9273......... Final Order .... 1999.73 ......... .
approved ............ November $ ?- ......... 19_...
A public hearing having been had upon the assessment for the above improvement, and said assessment
having been further considered by the Council, and having been considered finally satisfactory, be it therefore
RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same
is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation.
BE IT FURTHER -RESOLVED, That the said assessment be and it is hereby determined to be payable
im_-- ... - -__ -. _.....__..equal installments.
FEB 131963
Adoptedby the , Council- ...--------------------------•....•------......-------------- ••---------- 19......._.
c
FEB 13 1963 _ :
.. .. Clerk.
Approved--_ .................... -- ..... :• ..................... 19........
Form B. B. IS
File 15045
D
- ----------------------- - - - - -- Mayor.
I
•OLUTION W .S
•
-NCB
' ASSFSSM-
Council File No____
ati-
,t of
_______________________________
F" 36 i
n
e na-
By
J
1
rl cP
bn,
3U?
CITY OF ST. PAUL PUBLISHED -.- / b "
Resolution Ratifying Assessment
In the matter of the assessment of benefits, cost and expenses
for
grading and surfacing with bituminous material the alley in Block 28, Anna E. Ramsey's
Addition, Enlargement of, from Griggs St. to Ashland Ave., also constructing a storm
sewer in the alley from a point 207.6 ft. southeast of Ashland Ave. to the existing
sewer in Ashland Ave.
under Preliminary Order ....... 19$63_Z....... Intermediary Order ..... n9273......... Final Order .... 1999.73 ......... .
approved ............ November $ ?- ......... 19_...
A public hearing having been had upon the assessment for the above improvement, and said assessment
having been further considered by the Council, and having been considered finally satisfactory, be it therefore
RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same
is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation.
BE IT FURTHER -RESOLVED, That the said assessment be and it is hereby determined to be payable
im_-- ... - -__ -. _.....__..equal installments.
FEB 131963
Adoptedby the , Council- ...--------------------------•....•------......-------------- ••---------- 19......._.
c
FEB 13 1963 _ :
.. .. Clerk.
Approved--_ .................... -- ..... :• ..................... 19........
Form B. B. IS
File 15045
D
- ----------------------- - - - - -- Mayor.
I
S
o
CITY OF ST. PAUL
OFFICE OF THE COMMISSIONER OF FINANCE
Report of Completion of Assessment
In the matter of the Assessment of
4.��1 9
January15, 19 63
benefits, cost and expenses
for
grading and surfacing with bituminous material the alley in Block 28, Anna E. Ramsey's
Addition, Enlargement of, from Griggs St. to Ashland Ave., also constructing a storm
sewer in the alley from a point 207.6 feet southeast of Ashland Ave. to the existing
sewer.in Ashland Ave.
under Preliminary Order
198637
approved August 23,
1960
Intermediary Order
199273
, approved October 11,
1960
Final Order
199573
, approved November 8,
1960
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports to the Council the following as a statement of the ex-
penditures necessarily incurred for and in connection with the making of the above improvement, viz:
Cost of construction . ............................... $ 5 2 399.89
Engineering ............... .......................$ 571+.57
Inspection fees ...... ..............................$
Postal cards ............................ ..........$ 2.85
Publications ........ ..............................$ 28.50
Court costs for confirmation........ * ................$ 2.85
Total expenditures .............................$ 6,008.66
Said Commissioner further reports that he has assessed and levied the total amount as above ascer-
tained, to -wit: the sum of $6.008.66 upon each and every lot, part or parcel of land deemed
benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; that the said assessment has been completed, and that hereto attached,
identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as
completed by him, and which is herewith submitted to the Council for such action thereon as may be
considered proper.
Com ' sioner'of Finance.
2M 12 -b2 g